Leola Data Center
Leola, McPherson County, South Dakota
Leola Data Center is a proposed data center in Leola, South Dakota (McPherson County), operated by Leola Data Center, LLC. The public record puts it at 50 MW planned, 20 acres. It is the subject of active public debate, with hearings, petitions, or organized opposition on record.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Leola Data Center, LLC
- Facility type
- Data center
- Location
- 11641 358th Avenue, Leola, McPherson County, SD
- Coordinates
- 45.7044, -99.0354 (approximate)
- Power capacity
- 50 MW planned
- Land
- 20 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- Contested
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- December 2024ProposedMcPherson County enacted a moratorium on data-center siting and a one-mile setback ordinance while continuing to review this application. Source: Aberdeen Insider
- November 2024ProposedOriginal conditional use permit application filed with McPherson County for a 50 MW data center on 2 of 20 acres adjacent to MDU's Leola Substation. Source: McPherson County, SD (via South Dakota PUC docket EL24-027)
Opposition and litigation at this site
Yes. Leola Data Center in Leola, McPherson County, South Dakota is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. McPherson County's Board of Adjustment deferred action on Leola Data Center's conditional use permit application (confirmed via direct fetch of Aberdeen Insider's report, 2026-09-13; the site's own article text was largely paywalled so the exact hearing date could not be independently confirmed this run).
How the community has taken it
Reception is a sourced signal, not an editorial judgment: contested means active public debate is on record, with hearings, petitions, or organized opposition, without litigation.
McPherson County's Board of Adjustment deferred action on Leola Data Center's conditional use permit application (confirmed via direct fetch of Aberdeen Insider's report, 2026-09-13; the site's own article text was largely paywalled so the exact hearing date could not be independently confirmed this run). The county separately enacted a moratorium on data-center siting plus a one-mile setback from any church, school or residence, in county reporting tied explicitly to this application and dated to December 2024 (Aberdeen Insider, fetched 2026-09-13, also partially paywalled). Other press coverage surfaced by search but NOT independently fetched this run additionally describes a subsequent county ordinance permitting data centers as a conditional use, a July 2026 refiling of the application, an August 11, 2026 hearing, and a proposed $150,000/year payment to local emergency services -- these specific figures are flagged as unverified against a primary document this run.
Power and water
McPherson County CUP supplemental filing (2024-11-07) describes a closed-loop, 30:70 glycol:water immersion cooling process, with the glycol:water solution itself air-cooled via low-noise fans -- a recirculating water circuit is present, so this is closed_loop under the schema's tie-breaker rule, not air.
Notes on the record
Site is legally described as Section 28 (part E1/2), Township 126N, Range 68W, McPherson County -- a 20-acre parcel adjacent to Montana-Dakota Utilities' Leola Substation, at the SW corner of 358th Avenue (Highway 17) and 116th Street, about 5 miles southwest of Leola. The CUP application itself lists 11641 358th Avenue, Leola, SD 57456 as the site's general area/street address, which is what was geocoded here (US Census geocoder); precision is approximate because this is a street-level geocode, not a confirmed parcel-corner survey point. As of 2026-09-13 no final CUP decision had been located in sources checked this run.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Tax abatements or other public subsidy
- Permanent jobs promised
- Which utility serves it
Which document closes each gap
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Questions people ask about this site
Is there opposition to the Leola Data Center in Leola?
Yes. Leola Data Center in Leola, McPherson County, South Dakota is contested. Hearings, public comment, petitions, or organized opposition are on record, and no lawsuit has been filed so far. McPherson County's Board of Adjustment deferred action on Leola Data Center's conditional use permit application (confirmed via direct fetch of Aberdeen Insider's report, 2026-09-13; the site's own article text was largely paywalled so the exact hearing date could not be independently confirmed this run).
Has anyone filed a lawsuit over the Leola Data Center?
No lawsuit over Leola Data Center appears in the record we track as of September 13, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Leola Data Center use?
No water withdrawal figure for Leola Data Center is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Leola Data Center, and how big is it?
Leola Data Center, LLC is the operator on record. Capacity on record is 50 MW. The site is recorded at 20 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Leola Data Center," updated September 13, 2026, https://suedatacenters.org/data-centers/leola-data-center-mcpherson-county-sd.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/leola-data-center-mcpherson-county-sd, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Leola Data Center -- McPherson County Conditional Use Permit Application & Supplemental Information · McPherson County, SD (via South Dakota PUC docket EL24-027) · retrieved September 13, 2026
- 2.McPherson County Postpones Approval Of Leola Data Center Conditional Use Permit · Aberdeen Insider · retrieved September 13, 2026
- 3.McPherson County Approves Moratorium On Data Centers, Enacts 1 Mile Setback · Aberdeen Insider · retrieved September 13, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us