Sequitor Edge Rapid City is a proposed data center in Rapid City, South Dakota (Pennington County), operated by Sequitor Edge. The public record puts it at 2 MW planned, 10 acres.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Proposed

Operator
Sequitor Edge
Facility type
Data center
Location
S Highway 79, Black Hills Industrial Center, Rapid City, Pennington County, SD
Coordinates
44.0223, -103.1914 (approximate)
Power capacity
2 MW planned
Land
10 acres
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Black Hills Energy
Cooling
Closed loop
Water use
Not established from a public source
Jobs
3 permanent
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Confirmed by multiple independent sources or official documentation

Opposition and litigation at this site

Nothing on record as of October 10, 2026. No lawsuit, organized opposition, or contested hearing over Sequitor Edge Rapid City in Rapid City, Pennington County, South Dakota appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

Reported to require no new grid infrastructure for the initial phase.

Closed-loop cooling system with a one-time water fill of approximately 19,000 gallons (Baxtel, fetched 2026-09-13).

Notes on the record

Capacity figures differ between sources: Baxtel states an initial 2MW phase scaling to 10MW, and The Rapid City Post (February 2026) reports Sequitor Edge's Victoria Blatchford as saying the initial buildout, one data hall, will require up to 2 megawatts, scaling up to a maximum of 10 megawatts if five data halls are eventually constructed; KOTA TV separately reports 15MW for the same project (also citing a 1.3 PUE design target vs. an industry average of 1.8-2.0). The initial 2MW phase is recorded as planned capacity; the 10MW maximum and KOTA TV's 15MW are not. Tier 3 edge computing facility, greenfield, an initial ~30,000 sq ft building on a 1-acre footprint within a 10-acre site, expandable to five data halls across 7 acres. Construction was reported (by Baxtel and KOTA TV) to begin late summer 2026 with a roughly 14-month build targeting a 2027 opening; none of the sources checked (as of 2026-09-13) confirms construction has actually started. Coordinate is an OSM Nominatim road-level geocode of S Highway 79, Rapid City -- not a confirmed parcel.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Tax abatements or other public subsidy
  • How the community has received it
Which document closes each gap
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near Sequitor Edge Rapid City?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the Sequitor Edge Rapid City data center in Rapid City?

Nothing on record as of October 10, 2026. No lawsuit, organized opposition, or contested hearing over Sequitor Edge Rapid City in Rapid City, Pennington County, South Dakota appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the Sequitor Edge Rapid City data center?

No lawsuit over Sequitor Edge Rapid City appears in the record we track as of October 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Sequitor Edge Rapid City use?

No water withdrawal figure for Sequitor Edge Rapid City is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.

Who operates Sequitor Edge Rapid City, and how big is it?

Sequitor Edge is the operator on record. We hold 2 sites for that company across the registry. Capacity on record is 2 MW. The site is recorded at 10 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Sequitor Edge Rapid City," updated October 10, 2026, https://suedatacenters.org/data-centers/sequitor-edge-rapid-city-sd.

Facility data from Compute Atlas (E. Kubiak), version 1.34.1 (October 4, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/sequitor-edge-rapid-city-sd, retrieved October 29, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Sequitor Edge: Rapid City, South Dakota Data Center · Baxtel · retrieved September 13, 2026
  2. 2.South Dakota drought strains power grid as Rapid City data center moves forward · KOTA TV · retrieved September 13, 2026
  3. 3.Data Center Promises Low Impact on Rapid City · The Rapid City Post · retrieved October 10, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us