STACK Trade Zone Park (SVYDC 05 / SVYDC 06)

San Jose, Santa Clara County, California · All 22 STACK Infrastructure sites

PermittedNo reception on recordRecord updated September 21, 2026

STACK Trade Zone Park (SVYDC 05 / SVYDC 06) is a permitted data center in San Jose, California (Santa Clara County), operated by STACK Infrastructure. The public record puts it at 90 MW planned.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Permitted

Operator
STACK Infrastructure
Facility type
Data center
Location
2400 Ringwood Avenue, San Jose, Santa Clara County, CA, 95131
Coordinates
37.4029, -121.8950 (approximate)
Power capacity
90 MW planned
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Pacific Gas and Electric Company
Power source
Grid
On site generation
91 MW
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. April 12, 2023
    Permitted
    CEC granted the small power plant exemption following certification of the Final EIR on 2023-03-30. Source: California Energy Commission

Opposition and litigation at this site

Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over STACK Trade Zone Park (SVYDC 05 / SVYDC 06) in San Jose, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

CEC Small Power Plant Exemption 21-SPPE-02: 39 diesel-fired generators (36 rated 3 MW and 3 rated 1 MW) arranged in two generation yards, each serving one of the two data center buildings.

City of San José approved-project list (PD22-001) states cooling technology is air-cooled and the facility does not use significant amounts of potable water; heat-rejection method not further specified.

Notes on the record

At the corner of Trade Zone Boulevard and Ringwood Avenue (2400 Ringwood Avenue and 1849 Fortune Drive), San Jose, distinct from the tracked STACK Silicon Valley (SVY01/SVY02) and Hayward (SVY03A) sites. Acreage and building square footage appeared only in secondary summaries and are omitted.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Free case review

Living near STACK Trade Zone Park (SVYDC 05 / SVYDC 06)?

Tell us the basics and an independent attorney handling data center cases in your state will follow up. Free, and you are never obligated to hire anyone.

Questions people ask about this site

Is there opposition to the STACK Trade Zone Park (SVYDC 05 / SVYDC 06) data center in San Jose?

Nothing on record as of September 21, 2026. No lawsuit, organized opposition, or contested hearing over STACK Trade Zone Park (SVYDC 05 / SVYDC 06) in San Jose, Santa Clara County, California appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the STACK Trade Zone Park (SVYDC 05 / SVYDC 06) data center?

No lawsuit over STACK Trade Zone Park (SVYDC 05 / SVYDC 06) appears in the record we track as of September 21, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does STACK Trade Zone Park (SVYDC 05 / SVYDC 06) use?

No water withdrawal figure for STACK Trade Zone Park (SVYDC 05 / SVYDC 06) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates STACK Trade Zone Park (SVYDC 05 / SVYDC 06), and how big is it?

STACK Infrastructure is the operator on record. We hold 22 sites for that company across the registry. Capacity on record is 90 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "STACK Trade Zone Park (SVYDC 05 / SVYDC 06)," updated September 21, 2026, https://suedatacenters.org/data-centers/stack-trade-zone-park-san-jose-ca.

Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/stack-trade-zone-park-san-jose-ca, retrieved October 1, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.STACK Trade Zone Park (21-SPPE-02) · California Energy Commission · retrieved September 14, 2026
  2. 2.Nominatim geocode of 2400 Ringwood Avenue, San Jose, CA · OpenStreetMap contributors · retrieved September 14, 2026
  3. 3.CPUC Resolution E-5447: PG&E EPC agreement (AL 7653-E) supporting energization of STACK Infrastructure's new 90 MW data center load in San Jose · California Public Utilities Commission · retrieved September 21, 2026
  4. 4.City of San José, Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13) · City of San José Planning Division · retrieved September 21, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us