Calvert Infrastructure Hub is a proposed data center in Calvert, Alabama (Mobile County), operated by Beacon Data Centers. The public record puts it at 650 acres, a reported $6 billion investment.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Proposed
- Operator
- Beacon Data Centers
- Facility type
- Data center, AI use likely
- Location
- Calvert, Mobile County, AL
- Coordinates
- 31.1552, -88.0100 (approximate)
- Power capacity
- Not established from a public source
- Land
- 650 acres
- Investment
- $6 billion
- Announced
- Not established from a public source
- Utility
- Alabama Power
- Power source
- Grid
- Cooling
- Closed loop
- Water use
- Not established from a public source
- Jobs
- 250 permanent; 1,000 construction
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Opposition and litigation at this site
Nothing on record as of September 9, 2026. No lawsuit, organized opposition, or contested hearing over Calvert Infrastructure Hub in Calvert, Mobile County, Alabama appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Developer's campus page states "Alabama Power will service the site using high voltage power lines they already own." No megawatt figure is given for this campus on that page.
Developer states verbatim: "The site will utilize a closed-loop water system. Evaporative cooling will not be used." That is an explicit recirculating circuit with evaporative rejection ruled out, closed_loop, not `air` (a water circuit exists) and not `evaporative`. No withdrawal or consumption figure is stated.
Notes on the record
Developer's campus page states verbatim: "A 95 acre development out of a 650 acre lot" with "less than 15% of the site planned for development"; "$6 billion"; two data center buildings plus supporting infrastructure; "2027 First Building Completed"; currently in a "planning, engineering, and community engagement phase"; "up to 1,000 construction workers at peak construction" and "250 staff for operations" at an "average salary of $115,000". landAcres records the 650-acre site; the built footprint is 95 acres. NO CAPACITY RECORDED: the campus page states no MW figure. Secondary coverage attributes 6 GW to Beacon's WHOLE portfolio of six-plus campuses across Alberta, New Brunswick, Tom Green County TX, Kern County CA and Calvert, that is a portfolio figure, not this site's capacity, and is deliberately not recorded. COUNTY AMBIGUITY: Beacon's own page places the hub in Mobile County and that is what is recorded, but Calvert is an unincorporated community straddling Mobile and Washington counties, and the OSM village node used for the coordinate sits on the Washington County side. Verify the county against the parcel before publishing. SUBSIDY: no incentive or abatement is mentioned on the developer's page; Mobile County and Alabama Commerce records were NOT checked in this run, so this is an unchecked gap, not an audited negative. Coordinates are the Calvert community centroid, not the 650-acre parcel.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Tax abatements or other public subsidy
- How the community has received it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Edged Prichard Data Center (Project Gateway) · Prichard · Edged US29 mi · Proposed · 8 MW · Mixed reception
Questions people ask about this site
Is there opposition to the Calvert Infrastructure Hub data center in Calvert?
Nothing on record as of September 9, 2026. No lawsuit, organized opposition, or contested hearing over Calvert Infrastructure Hub in Calvert, Mobile County, Alabama appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Calvert Infrastructure Hub data center?
No lawsuit over Calvert Infrastructure Hub appears in the record we track as of September 9, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Calvert Infrastructure Hub use?
No water withdrawal figure for Calvert Infrastructure Hub is on record here. Cooling is recorded as closed_loop, which is the strongest available clue: closed loop and air cooled plant draw far less than evaporative cooling. We leave the number blank rather than estimate one.
Who operates Calvert Infrastructure Hub, and how big is it?
Beacon Data Centers is the operator on record. We hold 3 sites for that company across the registry. No capacity figure is on record for this site. The site is recorded at 650 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Calvert Infrastructure Hub," updated September 9, 2026, https://suedatacenters.org/data-centers/beacon-calvert-al.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/beacon-calvert-al, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Calvert - Beacon Data Centers (developer's campus page) · Beacon Data Centers · retrieved September 9, 2026
- 2.Nominatim geocode of Calvert, Alabama, returns both a census place spanning Mobile and Washington counties and a village node (31.1551748, -88.0099997) in Washington County · OpenStreetMap / Nominatim · retrieved September 9, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us