LN Compute Cuthbert Bitcoin Mine

Cuthbert, Randolph County, Georgia

OperatingNo reception on recordRecord updated August 5, 2026

LN Compute Cuthbert Bitcoin Mine is an operating crypto mining site in Cuthbert, Georgia (Randolph County), operated by LN Compute Inc. The public record puts it at announced September 2025, 7 MW operating.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
LN Compute Inc.
Facility type
Crypto mining
Location
Cuthbert, Randolph County, GA
Coordinates
31.7708, -84.7936 (approximate)
Power capacity
7 MW operating
Land
Not established from a public source
Investment
Not established from a public source
Announced
September 2025
Utility
Not established from a public source
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Opposition and litigation at this site

Nothing on record as of August 5, 2026. No lawsuit, organized opposition, or contested hearing over LN Compute Cuthbert Bitcoin Mine in Cuthbert, Randolph County, Georgia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

Notes on the record

An operational bitcoin-mining facility in Cuthbert's industrial park (Randolph County), reported by WALB to have officially opened by September 2025 and to consume about 7 MW (WALB: 'the equivalent of powering 5,000 homes'). Attributed to LN Compute Inc. via a DataCenterMap listing (50 Industrial Blvd); WALB names only the on-site project manager (Hao Chen), not the operating company, so the operator is carried at 'reported' confidence and no specific LN Energy numbered-LLC entity is asserted (LN Compute's Georgia sites use several such LLCs). WALB notes the site was chosen partly for low-mineral city water, consistent with water/liquid cooling, but the cooling type is not explicitly stated, so it is omitted. Coordinates are Cuthbert city-center (approximate); the listing's 50 Industrial Blvd address was not parcel-confirmed. Distinct from LN Compute's former Soperton site (sold to Cango Inc., Aug 2025) and from the separate LN Energy Blackshear/Pierce County proposal whose permit was denied (id=ln-energy-blackshear-pierce-ga).

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Questions people ask about this site

Is there opposition to the LN Compute Cuthbert Bitcoin Mine in Cuthbert?

Nothing on record as of August 5, 2026. No lawsuit, organized opposition, or contested hearing over LN Compute Cuthbert Bitcoin Mine in Cuthbert, Randolph County, Georgia appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the LN Compute Cuthbert Bitcoin Mine?

No lawsuit over LN Compute Cuthbert Bitcoin Mine appears in the record we track as of August 5, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does LN Compute Cuthbert Bitcoin Mine use?

No water withdrawal figure for LN Compute Cuthbert Bitcoin Mine is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates LN Compute Cuthbert Bitcoin Mine, and how big is it?

LN Compute Inc. is the operator on record. Capacity on record is 7 MW.

How to cite this page

SueDataCenters.org Data Center Registry, "LN Compute Cuthbert Bitcoin Mine," updated August 5, 2026, https://suedatacenters.org/data-centers/ln-compute-cuthbert-ga.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/ln-compute-cuthbert-ga, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.WALB (Sept 25, 2025): a new crypto-mining facility has officially opened in Cuthbert's industrial park, Randolph County; consumes about 7 megawatts (WALB's 'equivalent of powering 5,000 homes'); on-site project manager Hao Chen; Atkinson County facility expected to break ground next · WALB News 10 · retrieved August 5, 2026
  2. 2.DataCenterMap listing: LN Compute Cuthbert, 50 Industrial Blvd, Cuthbert, GA, attributes the site to LN Compute · DataCenterMap · retrieved August 5, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us