DATA3 Tulsa Data Center is an operating data center in Tulsa, Oklahoma (Tulsa County), operated by DATA3 Corporation.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- DATA3 Corporation
- Facility type
- Data center
- Location
- 2448 E 81st St, Suite 700, Tulsa, Tulsa County, OK, 74137
- Coordinates
- 36.0428, -95.9535 (approximate)
- Power capacity
- Not established from a public source
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- September 14, 2026OperatingListed as an operating carrier-neutral colocation facility in the Cloud and Colocation Oklahoma directory. Source: Cloud and Colocation
Opposition and litigation at this site
Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over DATA3 Tulsa Data Center in Tulsa, Tulsa County, Oklahoma appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Carrier-neutral Tier-3-style colocation suite in the Cityplex Towers complex in south Tulsa. Backup power is a 500 kVA diesel generator with two utility feeds and in-line UPS; fire suppression is waterless FM200. No IT load figure is published, so capacityMw is omitted. Coordinates are a street-address geocode of the tower complex.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Power capacity in megawatts
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Power capacity in megawatts
- The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- ENGUARD Data Center (Jackson Technical) · Tulsa · Jackson Technical8 mi · Operating · 0.4 MW
- Meta Project Anthem, Tulsa · Tulsa · Meta8 mi · Under construction · Contested
- TulsaConnect Tulsa Data Center (DC-2) · Tulsa · TulsaConnect8 mi · Operating
- OCOSA Communications Tulsa Data Center (321 S Boston) · Tulsa · OCOSA Communications8 mi · Operating
- TulsaConnect Tulsa Data Center (DC-1) · Tulsa · TulsaConnect8 mi · Operating
- Host Digital Northeast Oklahoma Data Center · Tulsa · Host Digital Infrastructure LLC8 mi · Operating · 43 MW
- TierPoint Tulsa - State Farm · Tulsa · TierPoint8 mi · Operating
- TulsaConnect Downtown (DC-5) · Tulsa · TulsaConnect8 mi · Operating
Questions people ask about this site
Is there opposition to the DATA3 Tulsa Data Center in Tulsa?
Nothing on record as of September 14, 2026. No lawsuit, organized opposition, or contested hearing over DATA3 Tulsa Data Center in Tulsa, Tulsa County, Oklahoma appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the DATA3 Tulsa Data Center?
No lawsuit over DATA3 Tulsa Data Center appears in the record we track as of September 14, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does DATA3 Tulsa Data Center use?
No water withdrawal figure for DATA3 Tulsa Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates DATA3 Tulsa Data Center, and how big is it?
DATA3 Corporation is the operator on record. No capacity figure is on record for this site.
How to cite this page
SueDataCenters.org Data Center Registry, "DATA3 Tulsa Data Center," updated September 14, 2026, https://suedatacenters.org/data-centers/data3-tulsa-ok.
Facility data from Compute Atlas (E. Kubiak), version 1.34.0 (September 21, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/data3-tulsa-ok, retrieved October 1, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Data3 - Tulsa Data Center · Cloud and Colocation · retrieved September 14, 2026
- 2.Oklahoma Data Center Location Map · Cloud and Colocation · retrieved September 14, 2026
- 3.OpenStreetMap Nominatim geocode for 2448 E 81st St, Tulsa, OK 74137 · OpenStreetMap · retrieved September 14, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us