Data Center Registry
Iron Mountain Data Centers NJE-1
Edison, Middlesex County, New Jersey · All 13 Iron Mountain sites
Iron Mountain Data Centers NJE-1 is an operating data center in Edison, New Jersey (Middlesex County), operated by Iron Mountain. The public record puts it at 30 MW operating, 43 acres.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Iron Mountain
- Facility type
- Data center
- Location
- 3003 Woodbridge Avenue, Edison, Middlesex County, NJ
- Coordinates
- 40.5211, -74.3474 (approximate)
- Power capacity
- 30 MW operating
- Land
- 43 acres
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Power source
- Mixed
- On site generation
- 7.2 MW
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Opposition and litigation at this site
Nothing on record as of September 12, 2026. No lawsuit, organized opposition, or contested hearing over Iron Mountain Data Centers NJE-1 in Edison, Middlesex County, New Jersey appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Operator states 100% renewable energy matching plus on-site solar via '18,000+ rooftop solar panels' (7.2 MW on-site solar generation capacity), described as the largest such installation of any North American data center, per Iron Mountain's own site.
Notes on the record
TIA-942-certified, 830,000 sq ft on a 43-acre campus, 30 MW with 2N redundancy, N+1 cooling/UPS, ISO 50001/14001 certified, PUE as low as 1.2. Acquired by Iron Mountain in January 2018 as part of a $1.34B acquisition of IO Data Centers' US portfolio (which also included sites in Phoenix, Scottsdale, and Columbus, OH), per the operator's own site. Hosts 180+ customers including 20+ carriers and two IXPs. Coordinate provenance (resolved 2026-09-12): Iron Mountain's own location page embeds a Google Maps link containing TWO coordinate pairs from two different Place IDs. This record uses 40.5210834,-74.3473835, the pair the link anchors directly to the literal address string "3003 Woodbridge Ave, Edison, NJ 08837, USA", which sits ~29 m from the independently-mapped OpenStreetMap building tagged "IO Datacenter" at the same address. The other page-stated pair (40.5216986,-74.3461546) carries no address string and lands ~145 m away; a naive extraction returns it, since the page labels neither. Both page-stated pairs are ~1.8-1.9 km from the US Census geocoder's point for this address, which interpolates along the street centre line and is wrong here.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Digital Realty New York EWR11 · Piscataway Township · Digital Realty6 mi · Operating
- Digital Realty New York EWR12 · Piscataway Township · Digital Realty6 mi · Operating
- Equinix NY11 · Carteret · Equinix7 mi · Operating
- QTS Piscataway 1 · Piscataway · QTS Data Centers8 mi · Operating · 65 MW
- CyrusOne NYM1 (Somerset) · Somerset · CyrusOne10 mi · Operating · 30 MW
- Telehouse New York (Staten Island Teleport) · Staten Island · Telehouse America (KDDI)11 mi · Operating
- Digital Realty Somerset (650 Randolph Road) · Franklin Township (Somerset) · Digital Realty11 mi · Operating
- CoreWeave NEST Campus · Kenilworth · CoreWeave11 mi · Under construction · 250 MW · Contested
Questions people ask about this site
Is there opposition to the Iron Mountain Data Centers NJE-1 data center in Edison?
Nothing on record as of September 12, 2026. No lawsuit, organized opposition, or contested hearing over Iron Mountain Data Centers NJE-1 in Edison, Middlesex County, New Jersey appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Iron Mountain Data Centers NJE-1 data center?
No lawsuit over Iron Mountain Data Centers NJE-1 appears in the record we track as of September 12, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Iron Mountain Data Centers NJE-1 use?
No water withdrawal figure for Iron Mountain Data Centers NJE-1 is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Iron Mountain Data Centers NJE-1, and how big is it?
Iron Mountain is the operator on record. We hold 13 sites for that company across the registry. Capacity on record is 30 MW. The site is recorded at 43 acres.
How to cite this page
SueDataCenters.org Data Center Registry, "Iron Mountain Data Centers NJE-1," updated September 12, 2026, https://suedatacenters.org/data-centers/iron-mountain-nje1-edison-nj.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/iron-mountain-nje1-edison-nj, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.New Jersey Data Center | New Jersey Colocation · Iron Mountain · retrieved September 12, 2026
- 2.Iron Mountain Data Centers NJE-1 to 3003 Woodbridge Avenue · DataCenterHawk · retrieved September 12, 2026
- 3.OpenStreetMap way/204316962, IO Datacenter, 3003, Woodbridge Avenue · OpenStreetMap contributors · retrieved September 12, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us