Why Are Data Centers Bad? The Evidence, Harm by Harm, and What Is Overstated
Data centers are bad for neighbors and communities in specific, documented ways: grid costs passed to household bills, water drawn from local supplies, round the clock low frequency noise, diesel and gas turbine exhaust, rezoned farmland, tax breaks that cost more than a million dollars per permanent job, construction damage, and deals negotiated under NDAs and code names. Here is the evidence for each harm, a real case from the record, what gets overstated, and the honest case for data centers too.
Key Takeaways
- Data centers are bad for the people around them mainly because the costs land locally while the benefits are spread out: higher grid costs, water demand, noise, combustion exhaust, land conversion, and tax breaks fall on a county, while the computing serves the whole world.
- Electricity is the most widely felt harm. PJM's independent market monitor attributes $29.4 billion, or 46 percent, of capacity charges across four auctions to data center load, and consumer advocates project the average PJM household paying about $70 a month more by 2028. Outside PJM, the effect depends on each state's rate cases.
- Water is a local problem more than a national one. U.S. data centers directly consumed about 66 billion liters in 2023, per Lawrence Berkeley National Laboratory, but one Google campus in Council Bluffs, Iowa consumed 1,346.0 million gallons in 2025 while Google's air cooled sites used almost none.
- Noise is the most common neighbor complaint and the subject of the largest class actions: more than 1,000 homes in the Microsoft case in Wisconsin and more than 10,000 people in the xAI turbine case in Mississippi. Both are pending.
- The jobs math is thin. Virginia's legislative auditors were told a typical 250,000 square foot data center has about 50 full-time workers, and Virginia's sales tax exemption cost $928.6 million in FY23 while the industry added about 800 new full-time jobs.
- Some claims are overstated. Radiation and EMF fears are not supported, data center noise is generally far below the level that damages hearing, and many projects pay full property tax. In Loudoun County, Virginia, data centers supplied 31 percent of local tax revenue.
In this article
Why are data centers bad? For the people who live near them, the short answer is that a large data center concentrates its costs on one community: it can raise electricity costs across a grid, draw heavily on local water, produce mechanical noise that runs all night, burn diesel or natural gas on site, convert farmland under rushed rezonings, and arrive with tax breaks and nondisclosure agreements that leave residents learning the details last. Each of those harms is documented in court filings, utility records, permits and state audits, and several are the subject of pending lawsuits on our tracker. Not every claim made about data centers holds up, though. Some are exaggerated, some are about the internet in general rather than the building down the road, and some projects are genuinely good deals for the counties that host them. This guide takes the harms one at a time: what the evidence shows, a real example from the record, and what gets overstated. Then it makes the fair case for data centers, and ends with what to do if one is proposed near you.
Electricity bills and grid costs
What the evidence says. A hyperscale campus can ask a utility for as much power as a small city, and someone has to pay for the generation and transmission built to serve it. Lawrence Berkeley National Laboratory estimated that U.S. data centers used 176 terawatt hours in 2023, 4.4 percent of all U.S. electricity, and projected 6.7 to 12.0 percent by 2028. When that demand arrives faster than new supply, prices rise for everyone on the grid, and the clearest measurement of that comes from PJM, the grid operator for 13 states and Washington, D.C.
The documented example. PJM's capacity auction price rose from $28.92 per megawatt-day for 2024/25 to $333.44 for 2027/28, the last two auctions held at a federally approved cap. PJM's independent market monitor attributes $29.4 billion, or 46 percent, of the $63.6 billion in capacity charges across those four auctions to data center load. Capacity charges pass through to retail bills, and consumer advocates project the average PJM household paying about $70 a month more by 2028. Our ratepayer tracker has the full numbers, and our report on the Ohio data center electric rate fight follows the first data center tariff through the state supreme court.
What is overstated. Not every rate increase is a data center increase. Fuel, transmission and storm costs move bills too, and a Rutgers policy analysis of New Jersey concluded that data centers were, as of its writing, mostly not yet the cause of that state's increases. States are also responding: as of May 2026, 23 states had approved at least one large load tariff, which sets minimum bills, long contracts and collateral so that a data center pays for the capacity it reserves. Whether a given household is subsidizing a given campus depends on the state, the utility and the tariff, and that is decided in a public rate proceeding residents can join. Our electric bill guide explains how.
Water: why data centers are bad for local supplies
What the evidence says. Servers turn electricity into heat, and the cheapest way to get rid of heat is to evaporate water in a cooling tower. Lawrence Berkeley National Laboratory estimated that U.S. data centers directly consumed about 66 billion liters of water in 2023, up from 21.2 billion liters in 2014, and that the power plants supplying them consumed nearly 800 billion liters more. At the site level the numbers get large fast. Google's own 2026 Environmental Report shows its Council Bluffs, Iowa campus consumed 1,346.0 million gallons in 2025, about 3.7 million gallons a day, water that evaporated and did not return to the local system.
The documented examples. Water harm shows up in two ways. The first is contamination from what a facility discharges: in Oregon, Amazon Data Services agreed in March 2026 to a $20.5 million settlement of a class action alleging that wastewater from its data centers added to nitrate contamination in the Lower Umatilla Basin. Amazon denies wrongdoing. See our nitrate settlement file. The second is competition for supply and recharge: the Coweta County, Georgia lawsuit over Project Sail concerns rural land inside a state-designated Most Significant Groundwater Recharge Area with roughly 103 acres of wetlands, and is pending. See the Project Sail case file.
What is overstated. Nationally, data center water use is modest; Google's report notes that U.S. data centers use less than one percent of the water Americans put on their lawns each year. And water use is a design choice, not a constant. Five Google sites its report footnotes as air cooled each consumed 0.1 million gallons in all of 2025. The catch is that air cooling uses more electricity, so a campus that wins the water argument often loses the power one. The right question for any specific project is which cooling method it will use and whether the water figures are permit conditions or projections. Our guide to how much water a data center uses walks through every number.
Noise, including the low frequency hum
What the evidence says. Noise is the most common complaint from people who live next to a data center, and it is the harm that has produced the largest lawsuits. Chillers, cooling towers, air handlers and condenser fans run 24 hours a day, and the sound often carries a steady tonal hum with strong low frequency content. That matters because most noise ordinances use A-weighted decibels, which discount low frequencies, so a hum that keeps people awake can still measure as compliant. WHO recommends less than 30 A-weighted decibels in bedrooms for quality sleep and a night noise guideline of 40 dB outside, and in a quiet rural area, steady mechanical noise is a large change.
The documented examples. In Mount Pleasant, Wisconsin, residents filed a proposed class action over Microsoft's Fairwater campus seeking to represent households within 1.5 miles, more than 1,000 homes, and Microsoft acknowledged that residents had noticed a tonal humming sound it attributed to cooling fans. See the Fairwater class action. In Southaven, Mississippi, a proposed class of more than 10,000 residents sued over the gas turbines powering xAI's Colossus 2, alleging near-constant roaring and low frequency vibration and readings above 70 dBA at property lines. See the Southaven turbine case. Both are pending, and none of the allegations has been proven in court.
What is overstated. Data center noise is generally not loud enough to damage hearing; NIDCD says sounds at or below 70 dBA are unlikely to cause hearing loss even after long exposure. The documented harm is chronic annoyance and lost sleep, which is real but different. Noise is also fixable. In the Great Oak neighborhood near Manassas, Virginia, roughly 300 homes about 600 feet from Amazon data centers pushed for county-backed noise studies, and Amazon's engineering changes cut the sound by roughly 10 decibels without a lawsuit. See the Great Oak dispute, our guide to what a data center sounds like, and our noise claim center.
Air: diesel backup generators and on-site gas turbines
What the evidence says. A data center burns nothing during normal operation, but its engines do. Every campus has diesel backup generators that are tested on a schedule and run during outages, and a growing number of AI campuses run natural gas turbines on site as primary power. Those are combustion sources of nitrogen oxides and fine particles, pollutants EPA links to aggravated asthma and, for particles, premature death in people with heart or lung disease.
The documented examples. Virginia is the only state that has counted the fleet publicly. Its data centers hold roughly 9,000 diesel backup generators, about 4,700 in Loudoun County, and about 8,000 statewide are older Tier 2 units, according to the state Department of Environmental Quality as reported by VPM. DEQ estimated that in a worst case the fleet could emit 9,000 tons of nitrogen oxides a year, about half of Northern Virginia's typical annual emissions from all other sources. In early 2026, over about 400 comments in opposition and fewer than 10 in support, DEQ adopted a change letting those generators run during planned utility outages. On gas turbines, the NAACP sued xAI in federal court in April 2026, alleging that 27 methane gas turbines ran at its Southaven campus without the Clean Air Act permits a major pollution source needs. The case is pending. See NAACP v. xAI and our guide to data center diesel generators.
What is overstated. Backup generators spend most of their lives switched off, and the 9,000 ton figure is DEQ's worst case, not a measured annual total. No published study has measured health outcomes at a data center fence line; the health findings come from research on the same pollutants from traffic, power plants and industry. The honest version is that emissions depend on fleet size, engine tier, run hours and distance, and all of those are in the facility's air permit, which is a public record. Turbines running as primary power are a different and larger category than backup diesel, and the two should not be described as the same thing.
Land use, farmland and zoning
What the evidence says. The newest campuses are measured in hundreds or thousands of acres, and many are proposed on rural or agricultural land because that is where large parcels and transmission lines are. That usually requires rezoning land from agricultural, residential or conservation use to industrial, which changes what a place is for good. Communities have pushed back hard: as of August 26, 2026, 40 states had at least one local data center moratorium or ban, and 94 local pauses were adopted in 2026 alone, according to the Programs.com national tracker summarized in our moratoriums tracker.
The documented examples. The PW Digital Gateway in Prince William County, Virginia proposed more than 22 million square feet of data centers on roughly 2,000 acres along Pageland Lane near the Manassas battlefield. Residents and the American Battlefield Trust sued, a judge voided the rezonings for legally defective public notice, the Virginia Court of Appeals affirmed, and QTS withdrew the final appeal on July 2, 2026, stating it had decided to terminate the project. See the Digital Gateway case. In Saline Township, Michigan, the township denied rezoning of 575 acres of farmland for a $7 billion campus serving OpenAI and Oracle; the developer and landowners sued, and the township settled, letting the project proceed with a community benefits package of roughly $14 million. See the Saline Township case.
What is overstated. The idea that a local "no" always ends the matter. Saline Township shows that a small government that denies a rezoning can face a lawsuit from the developer and settle. The opposite claim, that projects cannot be stopped, is also wrong: Digital Gateway is dead. What decides these fights is usually procedure and timing, notice defects, open meetings violations and appeal deadlines, rather than a general argument that data centers are bad. Our zoning and land use center covers the claims.
Tax breaks and few permanent jobs
What the evidence says. Data centers are among the most capital intensive buildings a county will ever host and among the least labor intensive once running. Virginia's Joint Legislative Audit and Review Commission reported that data center representatives described a typical 250,000 square foot facility as having about 50 full-time workers, roughly half of them contractors, and that 80 percent of the annual jobs attributed to the industry come from construction. Meanwhile, most states exempt data center equipment from sales tax. Virginia's exemption saved data centers and their tenants $928.6 million in FY23, and JLARC found it returns 48 cents in state revenue for every dollar it costs.
The documented example. Divide Virginia's $928.6 million FY23 exemption by the roughly 800 new full-time jobs the industry added that year and you get about $1.16 million per new job; that division is ours, using JLARC's figures. Good Jobs First states the general pattern: because these subsidies favor capital investment rather than job creation, taxpayer costs routinely exceed $1 million per permanent job. Local deals can stack on top. In Effingham County, Georgia, records show county leaders finalized a tax break for a $20 billion OpenAI project the day before it was publicly announced. Our guide to data center tax abatements lays out the statutes and packages.
What is overstated. The claim that data centers pay no taxes. Many pay a great deal of property tax, and some take no abatement at all. Barber County, Kansas approved Google's Project Helium with 100 percent of ad valorem property taxes and no abatement, a projected $327.5 million over 20 years. Mount Pleasant, Wisconsin gave Microsoft no public financial incentives and got a $1.4 billion minimum assessed value guarantee instead. The tax question is never whether a data center pays, but what the specific deal gives up and whether the public saw the math before the vote.
Construction: dust, blasting, wells and trucks
What the evidence says. A large campus can take one to several years to build, with heavy truck traffic, clearing, grading, and in rocky ground, blasting. This is the phase in which neighbors report dust, vibration and damaged private wells, and it is often waved off as temporary, which is true and not much comfort to someone whose well has gone brown. Construction also draws water that rarely appears in the headline figures: Meta's 2025 Environmental Data Index notes that 1,019 megaliters, roughly 269 million gallons, was withdrawn for data center construction and is not included in its operating totals.
The documented examples. In Louisa County, Virginia, a homeowner sued Amazon in July 2026 over brown well water, dust and noise from campus construction, pleading nuisance, negligence and property damage. See the Louisa County case. In Georgia, four families near Meta's Stanton Springs campus sued in late August 2026, alleging that clearing, blasting and excavation filled their wells with silt and sediment. See the Newton County well case. Both are pending.
What is overstated. Causation is genuinely contested in these cases. Meta says a groundwater study it commissioned found that groundwater flows away from the plaintiffs' properties and that its facility was likely not the cause. No court has found that either operator damaged either household's well. The lesson is practical rather than rhetorical: the homeowner who has a dated, certified well test from before construction started is in a far stronger position than one who does not. Our guide to construction damage claims covers the evidence.
Secrecy: NDAs, code names and fast votes
What the evidence says. Data center projects routinely move through local government under code names, with officials bound by nondisclosure agreements and the end user unnamed until late in the process. Developers say this protects competitive information. The effect on residents is that by the time they learn what is proposed, key votes may already have happened and appeal clocks may already be running.
The documented examples. In Hermantown, Minnesota, the Minnesota Star Tribune reported that the city administrator, 22 St. Louis County employees and three county commissioners signed nondisclosure agreements with the developer. Google was revealed as the end user of what it called Project Loon in March 2026, and on August 17, 2026 the company announced it was terminating its NDAs with city officials. See our Hermantown records review. In Grayslake, Illinois, a lawsuit filed in July 2026 alleges that public notices identified a 472 acre campus only by the code name T5@Chicago IV and that a hearing removing the site's residential uses lasted 61 seconds with no public comment. See the Grayslake case. In Festus, Missouri, residents allege that a 29 page development agreement for a $6 billion project was released on a Friday for a Monday vote. See the Festus sunshine lawsuit. Both suits are pending.
What is overstated. Secrecy is not automatically illegal, and it is not proof that a project is a bad deal. In Pima County, Arizona, opponents of Project Blue sued under the state's open meeting law, and the superior court dismissed the case in April 2026; the plaintiffs said they would appeal. See the Project Blue case. What secrecy reliably does is shorten the time residents have to read the record and respond, which is why a public records request filed early is one of the most useful things a neighbor can do.
What data centers do well: the case for them
A site that publishes only facts has to publish these too. Data centers are not landfills, and many counties have hosted them for years without the problems above.
- Tax base. Where equipment is taxable and abatements are limited, the revenue can be transformative. JLARC found that in Loudoun County, Virginia, data centers supplied 31 percent of total local tax revenue, and that localities used the money to lower real estate tax rates and build reserve funds. Barber County, Kansas negotiated full property taxes, community benefit payments, road security and decommissioning security.
- Some well paid jobs, and a lot of construction work. Permanent operations jobs are few, but JLARC scored Virginia's exemption at 84 jobs per $1 million spent against 58 for the average Virginia incentive, because construction and supplier employment are counted. Whether that is worth the cost is a local political judgment.
- Low water designs exist and are being used. Air cooled and closed loop campuses use very little water. Barber County's agreement makes Google's Project Helium air cooled and closed loop with no new water wells. Microsoft says a closed loop chip cooling design it introduced in 2024 avoids evaporative cooling and is expected to save more than 125 million liters a year per data center. Google reported that 394.3 of the 440.6 million gallons withdrawn at its Douglas County, Georgia campus in 2025 was reclaimed wastewater.
- Costs can be assigned to the data center. Large load tariffs in 23 states, and laws in states from Texas to New Jersey, are designed to make data centers pay for the capacity they reserve rather than spread it across households.
- Harms can be engineered down. Great Oak's roughly 10 decibel reduction shows that noise is often a design and enforcement problem with a technical fix.
- Some fears are unfounded. The National Cancer Institute states that non-ionizing electromagnetic fields, the kind produced by electrical equipment and power lines, cannot damage DNA or cells directly. Radiation is not a credible concern near a data center. Our guide on whether it is safe to live near a data center sorts the supported health concerns from the unsupported ones.
The fair summary is that a data center is not inherently good or bad for a community. It is a very large industrial load whose effect depends on the cooling design, the power source, the distance to homes, the tax deal and the enforceable conditions written into the approval. Those terms are negotiated, and the communities that end up with the better outcomes are usually the ones that read the record and showed up before the vote.
What you can do if one is proposed near you
The time to act is before approval, when the whole project is still on the table. After it is built, the options narrow to complaints, enforcement and damages.
- Find out what is near you. Our data center registry lets you search operating and proposed sites near your address, and your county's planning agendas will show rezonings, special use permits and development agreements before they are announced.
- Get the documents. Ask for the application, the staff report, any development or tax agreement, and the noise, traffic and water studies. If the project has a code name or officials have signed NDAs, file a public records request now.
- Ask the five questions that decide most harms. What cooling method, and what annual water withdrawal? What power source, including any on-site turbines? How many generators, of what tier, permitted for how many hours? What nighttime sound limit, measured where, in dBA and dBC? What tax deal, and how many permanent jobs?
- Protect your own baseline. If you are on a well, get a certified test now. Record current nighttime sound levels at your property line. Photograph your foundation and driveway before trucks arrive.
- Watch the deadlines. Appeal windows after an approval can be as short as 30 days, and some are shorter. Our zoning appeal deadlines guide lists them by state.
Our full playbook is how to fight a proposed data center, which covers reading the application, spotting notice and open meetings defects, organizing neighbors and the political routes that have worked. If a facility near you is already causing harm you can document, our evidence guide explains what to keep, and a free case review form lets you tell us what is happening; where an independent attorney in our network who handles these matters is available, we may share your information with them with your consent, but we cannot promise that anyone will contact you.
Frequently asked questions
Why are data centers bad?
For nearby communities, the documented harms are higher grid costs that can reach household bills, heavy local water use, constant mechanical noise including a low frequency hum, exhaust from diesel generators and on-site gas turbines, rezoning of farmland and rural land, tax breaks that often exceed $1 million per permanent job, construction dust and well damage, and approvals negotiated under NDAs and code names. How much of that applies depends on the specific project's design, location and deal. Some claims, such as radiation risk, are not supported.
Why are data centers bad for the environment?
They use large amounts of electricity, 4.4 percent of all U.S. electricity in 2023 per Lawrence Berkeley National Laboratory, and that power has to be generated somewhere, with whatever emissions the local grid carries. Evaporative cooling consumes water, and on-site diesel generators and gas turbines emit nitrogen oxides and fine particles. The size of each impact varies widely by cooling design and power source; air cooled campuses use very little water but more electricity.
Why are data centers bad for communities?
Because the costs fall locally while the benefits are spread out. Neighbors report round the clock noise, construction traffic and dust, well problems, and changes to rural land, and counties often grant tax breaks for projects that employ few permanent workers; Virginia's auditors were told a typical 250,000 square foot facility has about 50 full-time workers. Many deals are also negotiated under nondisclosure agreements and code names, leaving residents little time to respond before votes.
Why are data centers bad for water?
Many cool their servers by evaporating water, which removes it from the local supply, and a single large campus can consume millions of gallons a day; Google's Council Bluffs, Iowa campus consumed 1,346.0 million gallons in 2025. Cooling tower discharge carries concentrated minerals and chemicals, and construction can disturb shallow groundwater that private wells draw from. Air cooled and closed loop designs use far less water but more electricity.
What are the pros and cons of living near a data center?
The cons that are documented include continuous cooling equipment noise, generator testing and outage running, a multi-year construction period with trucks, dust and sometimes blasting, risk to private wells during construction, and large substation and transmission infrastructure. The pros are mainly fiscal: where taxes are not heavily abated, data centers can fund schools and roads and lower residential tax rates, as in Loudoun County, Virginia, and once built they occupy land that might otherwise become a use with more traffic. No published study has examined the health of people living near data centers.
Are data centers bad for the environment?
They carry real environmental costs, mainly electricity demand, water consumption where evaporative cooling is used, and combustion emissions from backup generators and on-site turbines. Those costs are not fixed: water use ranges from near zero at air cooled sites to over a billion gallons a year at large evaporative campuses, and emissions depend on engine tier and run hours listed in the air permit. Judging a specific project means looking at its cooling, power source and permits.
Article sources
Our editorial standards require primary sources: government publications, regulator data, company filings, and established industry research.
- 1.Lawrence Berkeley National Laboratory: 2024 United States Data Center Energy Usage Report (December 2024), electricity share and direct and indirect water consumption
- 2.Utility Dive: Data centers drove $6.3B in PJM capacity auction costs, market monitor (July 20, 2026)
- 3.Utility Dive: PJM capacity prices hit record high as grid operator falls short of reliability target (December 18, 2025)
- 4.Clean Energy Group: States are stepping up to protect households from rising energy bills due to data centers (July 16, 2026)
- 5.Columbia Law School Climate Law Blog: What local governments should know about large-load tariffs (June 2, 2026)
- 6.Rutgers New Jersey State Policy Lab: Are data centers raising your electric bill? Mostly not. Yet.
- 7.Google 2026 Environmental Report (FY2025 data): water use by data center location, air cooled sites, reclaimed water
- 8.Meta 2025 Environmental Data Index (construction water withdrawal)
- 9.Microsoft 2026 Environmental Sustainability Report (closed loop chip cooling design)
- 10.Oregon Capital Chronicle: Amazon to pay $20.5 million settlement over northeast Oregon nitrate pollution (March 31, 2026)
- 11.The Citizen: Coweta residents sue to block Project Sail data center (May 11, 2026)
- 12.Wisconsin Examiner: Mount Pleasant residents file class action suit over Microsoft data center noise (July 2026)
- 13.Mississippi Free Press: Southaven residents sue xAI alleging near-constant noise from gas turbines (June 2026)
- 14.Data Center Knowledge: Amazon tones down its data center noise after residents sound the alarm (Great Oak)
- 15.WHO Regional Office for Europe: Noise fact sheet (bedroom and night noise recommendations)
- 16.NIDCD: Noise-Induced Hearing Loss (70 dBA threshold)
- 17.EPA: Basic Information about NO2
- 18.EPA: Health and Environmental Effects of Particulate Matter (PM)
- 19.VPM: Virginia data centers' diesel backup generators, DEQ counts and worst-case emissions (December 17, 2025)
- 20.Prince William Times: Despite hundreds of complaints, Virginia eases its rules on dirtier data center generators (2026)
- 21.Southern Environmental Law Center: Civil rights group sues xAI for illegal pollution from data center power plant (April 2026)
- 22.Programs.com: Data center moratoriums by state, tracker and statistics (as of August 26, 2026)
- 23.WTOP: Digital Gateway data center project dies after final developer withdraws appeal (July 2026)
- 24.Fortune: AI data center politics and farmland in Saline, Michigan (May 6, 2026)
- 25.Planet Detroit: Saline data center settlement challenge (December 2025)
- 26.JLARC: Data Centers in Virginia, Report 598 (December 9, 2024), exemption value, jobs, local revenue share and return per dollar
- 27.Good Jobs First: Clouded Judgment: Data Center Subsidies Don't Add Up (May 8, 2025, updated January 23, 2026)
- 28.WTOC: Records show Effingham County leaders finalized tax break for $20B OpenAI data center day before public announcement (July 29, 2026)
- 29.Barber County, Kansas: Summary of agreement terms with Google regarding Project Helium (August 31, 2026)
- 30.Wisconsin Public Radio: Mount Pleasant deal with Microsoft will include no public financial incentives (November 13, 2023)
- 31.Virginia Mercury: Brown water, dust and loud noises: Louisa homeowner sues Amazon over data center construction (July 28, 2026)
- 32.Atlanta Journal-Constitution: Georgia families sue Meta, accuse its data center of tainting their water (September 2026)
- 33.Minnesota Star Tribune: St. Louis County leaders blasted for signing data center-related NDAs (October 15, 2025)
- 34.MPR News: Tech giant Google is behind controversial data center proposal in Hermantown (March 3, 2026)
- 35.Duluth News Tribune: Hermantown leaders apologize for disparaging data center critics (August 17, 2026)
- 36.Lake and McHenry County Scanner: Lake County residents file lawsuit to block 472 acre data center campus in Grayslake (August 8, 2026)
- 37.St. Louis Public Radio: Data center opposition group sues city of Festus, proposed developer (April 10, 2026)
- 38.AZPM: Pima County judge tosses lawsuit over Project Blue data center rezoning (April 13, 2026)
- 39.National Cancer Institute: Electromagnetic Fields and Cancer fact sheet
Related reading
- Is It Safe to Live Near a Data Center? What the Evidence Actually Shows
The honest answer, separated into three buckets: harms that are documented and measurable (noise, sleep disruption, combustion emissions, construction dust, well problems, property value and power cost effects), the health questions that are genuinely unresolved because nobody has studied them, and the claims that do not survive contact with the physics. With WHO, EPA, NIDCD and Health Canada sources, and the real setback numbers from actual agreements.
- How to Fight a Proposed Data Center Before It Breaks Ground
Approval fights are the most successful category of data center litigation. Here is the playbook: reading the rezoning file, spotting notice and open meetings defects, organizing neighbors, referendums and recalls, moratoriums, and the short appeal clocks that decide everything.
- What Communities Give Up: Data Center Tax Abatements, Line by Line
A data center is sold to a county on a property tax number, and that number is usually reduced by a statute or a negotiated deal the public never reads. The mechanisms explained, the qualifying thresholds quoted from the Ohio, Texas, Virginia, Georgia, and Iowa statutes, real packages on record from Barber County, Kansas to Effingham County, Georgia, what the states now say the exemptions cost, and the records a resident can request.
- Who Pays for Data Center Power: The Ratepayer Tracker
The numbers behind the electric bill fight: PJM's capacity price rose from $28.92 to $333.44 per megawatt-day in three years, data centers account for $29.4 billion of the last four auctions' capacity costs by the market monitor's count, and the average PJM household faces an estimated $70 a month more by 2028. The running record of what regulators have found, which 23 states have answered with large load tariffs, what those tariffs require, and what a resident can do about a bill.
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.