Data Center Registry
Skybox PowerCampus Dallas (Lancaster)
Lancaster, Dallas County County, Texas · All 7 Skybox Datacenters sites
Skybox PowerCampus Dallas (Lancaster) is a data center under construction in Lancaster, Texas (Dallas County County), operated by Skybox Datacenters (with Bandera Ventures and Principal Asset Management). The public record puts it at 300 MW planned.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- Skybox Datacenters (with Bandera Ventures and Principal Asset Management)
- Facility type
- Data center
- Location
- Lancaster, Dallas County County, TX
- Coordinates
- 32.5921, -96.7561 (approximate)
- Power capacity
- 300 MW planned
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Oncor
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- 2024Under constructionDallas Innovates reports Skybox began work on the campus Source: Dallas Innovates
- November 20, 2023ProposedStatus change recorded. Source: Data Center Frontier
Opposition and litigation at this site
Nothing on record as of November 4, 2026. No lawsuit, organized opposition, or contested hearing over Skybox PowerCampus Dallas (Lancaster) in Lancaster, Dallas County County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Private 300 MW on-site substation served by Oncor.
Notes on the record
A 300 MW campus of about 100 to 110 acres near I-35E in southern Dallas County, with up to 1 million sq ft. Skybox still lists PowerCampus Dallas as an active project. Current build-out status has not been confirmed.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- STACK DFW02 (Lancaster) · Lancaster · STACK Infrastructureunder 1 mile · Under construction · 500 MW
- Red Oak Campus · Red Oak · Compass Datacenters5 mi · Proposed · Mixed reception
- Red Oak Campus · Red Oak · DataBank6 mi · Under construction · 480 MW
- Google Red Oak Campus · Red Oak · Google6 mi · Operating · Mixed reception
- Crow Holdings Stemmons Corridor Data Center Campus · Dallas · Crow Holdings (developed and leased by CleanArc Data Centers)13 mi · Proposed · 245 MW
- Flexential Dallas - Downtown Dallas · Dallas · Flexential15 mi · Operating · 6.66 MW
- PowerHouse Grand Prairie Campus · Grand Prairie · PowerHouse Data Centers15 mi · Under construction · 1.8 GW
- TierPoint Dallas · Dallas · TierPoint16 mi · Operating
Questions people ask about this site
Is there opposition to the Skybox PowerCampus Dallas (Lancaster) data center in Lancaster?
Nothing on record as of November 4, 2026. No lawsuit, organized opposition, or contested hearing over Skybox PowerCampus Dallas (Lancaster) in Lancaster, Dallas County County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Skybox PowerCampus Dallas (Lancaster) data center?
No lawsuit over Skybox PowerCampus Dallas (Lancaster) appears in the record we track as of November 4, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Skybox PowerCampus Dallas (Lancaster) use?
No water withdrawal figure for Skybox PowerCampus Dallas (Lancaster) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Skybox PowerCampus Dallas (Lancaster), and how big is it?
Skybox Datacenters (with Bandera Ventures and Principal Asset Management) is the operator on record. We hold 7 sites for that company across the registry. Capacity on record is 300 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Skybox PowerCampus Dallas (Lancaster)," updated November 4, 2026, https://suedatacenters.org/data-centers/skybox-powercampus-dallas-lancaster-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.35.1 (November 2, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/skybox-powercampus-dallas-lancaster-tx, retrieved November 5, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Skybox Plans 300-Megawatt Campus South of Dallas · Data Center Frontier · retrieved November 4, 2026
- 2.Skybox Datacenters Begins Work on Massive Data Center in Southern Dallas County · Dallas Innovates · retrieved November 4, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us