Sue Data Centers

Data Center Registry

Lancium Clean Campus (Crusoe / Stargate Site 1)

Abilene, Taylor County, Texas · All 4 Crusoe sites · Every OpenAI and Oracle case on our tracker

OperatingSupportedAI mixed useRecord updated July 26, 2026

Lancium Clean Campus (Crusoe / Stargate Site 1) is an operating data center in Abilene, Texas (Taylor County), operated by Crusoe. The public record puts it at announced December 2021, 1.2 GW planned, 1,000 acres. It has documented public support and no documented opposition.

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
Crusoe
Facility type
Data center, AI use mixed
Location
Abilene, Taylor County, TX
Coordinates
32.5022, -99.7887 (approximate)
Power capacity
200 MW operating; 1.2 GW planned
Land
1,000 acres
Investment
Not established from a public source
Announced
December 2021
Utility
ERCOT grid; Crusoe has separately contracted 4.5 GW of natural gas supply for its broader multi-site AI buildout
Power source
Grid
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
Supported
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. June 2025
    Operating
    First 2 of 8 planned buildings (~200+ MW) operational, hosting Oracle Cloud Infrastructure GPU capacity for OpenAI's Stargate project. Source: Data Center Frontier
  2. 2024
    Under construction
    Crusoe Energy begins building AI/HPC data-center buildings on the Lancium campus, pivoting the site from its original crypto-mining plan toward multi-tenant AI hosting (publicly branded "Stargate Site 1"). Source: Data Center Dynamics
  3. December 2021
    Proposed
    Lancium announces "Project Artemis": a Bitcoin-mining/grid-demand-response campus with Taylor County and the City of Abilene, projected at up to $2.4B over 20 years, scaling 200 MW to 1 GW. Source: PR Newswire

Opposition and litigation at this site

Not that we can document. Local officials or residents have expressed public support for Lancium Clean Campus (Crusoe / Stargate Site 1) in Abilene, Taylor County, Texas, and no opposition, petition, or lawsuit appears in the sources this registry tracks as of July 26, 2026. City leadership has been enthusiastic about jobs and tax-base growth, framing the project locally as the city's largest single investment since Dyess Air Force Base; some nearby residents have raised construction-traffic concerns.

How the community has taken it

Reception is a sourced signal, not an editorial judgment: supported means local officials or residents have expressed public support and no opposition is documented.

City leadership has been enthusiastic about jobs and tax-base growth, framing the project locally as the city's largest single investment since Dyess Air Force Base; some nearby residents have raised construction-traffic concerns. No organized opposition campaign found.

Source: KTXS (Sinclair)

Power and water

Originally designed as an ERCOT-integrated demand-response/curtailable load site. On-site behind-the-meter natural-gas generation for this campus IS now confirmed via TCEQ Standard Permit Reg. 177263 to 10 turbines totaling 360.5 MW, 'for onsite use only for data centers and computing,' with a large expansion proposed, tracked separately as the power_generation record crusoe-abilene-onsite-generation-tx.

Notes on the record

Originally proposed Dec 2021 as Lancium's "Project Artemis", a Bitcoin-mining and grid-demand-response campus using stranded/curtailed West Texas wind and solar power, with Lancium throttling load during ERCOT peak demand. Crusoe Energy has since built and operates AI/HPC data-center buildings on the site (publicly branded "Stargate Site 1"), with Oracle Cloud Infrastructure as the tenant hosting NVIDIA GPU clusters for OpenAI's Stargate project, Oracle sits contractually between Crusoe and OpenAI; no confirmed direct OpenAI-Crusoe lease. Lancium retains land/electrical-infrastructure ownership; Crusoe leases and operates part of an approximately 800-1,000-acre campus. First 2 of 8 planned buildings (~200+ MW) were operational by mid-2025; remaining 6 are under construction, with a full 1.2 GW build-out targeted for completion in 2026-2027 (dates vary by source). Construction-workforce and total AI-era investment figures conflict significantly across sources (reported range: 2,000-9,000 workers; an unverified ~$11.6B raise) and are not repeated here as fact. Coordinates are approximate (geocoded from a listed street address, not parcel-confirmed, the ~800-1,000-acre campus could place any specific building up to ~1-2 miles from this point). Also known as the Lancium Clean Campus.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
Which document closes each gap
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

  • Stargate Abilene · Abilene · OpenAI / Oracle / Crusoe5 mi · Operating · 1.2 GW · Mixed reception

Questions people ask about this site

Is there opposition to the Lancium Clean Campus (Crusoe / Stargate Site 1) in Abilene?

Not that we can document. Local officials or residents have expressed public support for Lancium Clean Campus (Crusoe / Stargate Site 1) in Abilene, Taylor County, Texas, and no opposition, petition, or lawsuit appears in the sources this registry tracks as of July 26, 2026. City leadership has been enthusiastic about jobs and tax-base growth, framing the project locally as the city's largest single investment since Dyess Air Force Base; some nearby residents have raised construction-traffic concerns.

Has anyone filed a lawsuit over the Lancium Clean Campus (Crusoe / Stargate Site 1)?

No lawsuit over Lancium Clean Campus (Crusoe / Stargate Site 1) appears in the record we track as of July 26, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does Lancium Clean Campus (Crusoe / Stargate Site 1) use?

No water withdrawal figure for Lancium Clean Campus (Crusoe / Stargate Site 1) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates Lancium Clean Campus (Crusoe / Stargate Site 1), and how big is it?

Crusoe is the operator on record. We hold 4 sites for that company across the registry. Capacity on record is 1.2 GW. The site is recorded at 1000 acres.

How to cite this page

SueDataCenters.org Data Center Registry, "Lancium Clean Campus (Crusoe / Stargate Site 1)," updated July 26, 2026, https://suedatacenters.org/data-centers/lancium-crusoe-abilene-tx.

Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/lancium-crusoe-abilene-tx, retrieved September 14, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Taylor County and City of Abilene Announce Historic Partnership With Lancium · PR Newswire · retrieved July 10, 2026
  2. 2.Crusoe Begins Construction on Second Phase of Abilene, Texas Data Center Campus · Data Center Dynamics · retrieved July 10, 2026
  3. 3.Crusoe Adds 4.5 GW of Natural Gas to Fuel AI, Expands Abilene Data Center to 1.2 GW · Data Center Frontier · retrieved July 10, 2026
  4. 4.Lancium, Crusoe Executives Brief Abilene Leaders on Major Northside Investment · KTXS (Sinclair) · retrieved July 10, 2026
  5. 5.City of Abilene, Taylor County to Build Billion-Dollar Data Center to Host Bitcoin Mining · Bitcoin Magazine · retrieved July 10, 2026

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us