Data Center Registry
Ionic Digital Cedarvale Facility
Barstow, Ward County County, Texas
Ionic Digital Cedarvale Facility is a data center under construction in Barstow, Texas (Ward County County), operated by Ionic Digital (leased to Nscale). The public record puts it at 234 MW planned.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Under construction
- Operator
- Ionic Digital (leased to Nscale)
- Facility type
- Data center, AI use confirmed
- Location
- Barstow, Ward County County, TX, 79719
- Coordinates
- 31.4618, -103.3949 (approximate)
- Power capacity
- 234 MW planned
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- 2026Under constructionTracker lists operational, construction and planned phases, first built in 2026 with expansions through 2027 Source: Baxtel
Opposition and litigation at this site
Nothing on record as of November 4, 2026. No lawsuit, organized opposition, or contested hearing over Ionic Digital Cedarvale Facility in Barstow, Ward County County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Notes on the record
Ionic leased the site's full 234 MW to Nscale on a 10-year triple-net lease of about $2B, announced in October 2025. The site hosts Nscale hardware for Microsoft AI services, about 104,000 Nvidia GB300 GPUs. Microsoft can add another 700 MW from late 2027. The exact phase status is unclear, and the coordinates are the town point.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Microsoft Pecos Data Center Campus · Pecos · Microsoft6 mi · Proposed · 2 GW · Supported
- BlockchAIn Reeves County AI GPU Hosting Site · BlockchAIn Digital Infrastructure, Inc.6 mi · Proposed
- Core Scientific Pecos AI Campus · Pecos · Core Scientific11 mi · Under construction
- Cipher Black Pearl Campus · Wink · Cipher Digital24 mi · Under construction · 300 MW
Questions people ask about this site
Is there opposition to the Ionic Digital Cedarvale Facility in Barstow?
Nothing on record as of November 4, 2026. No lawsuit, organized opposition, or contested hearing over Ionic Digital Cedarvale Facility in Barstow, Ward County County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Ionic Digital Cedarvale Facility?
No lawsuit over Ionic Digital Cedarvale Facility appears in the record we track as of November 4, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Ionic Digital Cedarvale Facility use?
No water withdrawal figure for Ionic Digital Cedarvale Facility is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Ionic Digital Cedarvale Facility, and how big is it?
Ionic Digital (leased to Nscale) is the operator on record. Capacity on record is 234 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Ionic Digital Cedarvale Facility," updated November 4, 2026, https://suedatacenters.org/data-centers/ionic-digital-cedarvale-barstow-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.35.1 (November 2, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/ionic-digital-cedarvale-barstow-tx, retrieved November 5, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Nscale Wins $14B Microsoft AI Deal, Secures Texas Site via Lease with Ionic Digital · The Energy Mag · retrieved November 4, 2026
- 2.Neocloud Data Center (Cedarvale) · Baxtel · retrieved November 4, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us