TierPoint Omaha - Bellevue Data Center is an operating data center in Bellevue, Nebraska (Sarpy County), operated by TierPoint. The public record puts it at 5.5 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- TierPoint
- Facility type
- Data center, AI use mixed
- Location
- 1001 North Fort Crook Road, Bellevue, Sarpy County, NE, 68005
- Coordinates
- 41.1530, -95.9250 (approximate)
- Power capacity
- 5.5 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Opposition and litigation at this site
Nothing on record as of August 16, 2026. No lawsuit, organized opposition, or contested hearing over TierPoint Omaha - Bellevue Data Center in Bellevue, Sarpy County, Nebraska appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
Power and water
Five redundant on-site generators totaling 5.5 MW with a minimum 48 hours of runtime, backup capacity, not IT load.
Notes on the record
Multi-tenant colocation facility at 1001 North Fort Crook Road, Bellevue (Sarpy County): 100,000+ total sq ft with 21,000+ sq ft of raised floor, A-side/B-side power distribution, a 100% uptime SLA, and 10,000 sq ft of business-continuity seating with a 300-seat recovery space. Carrier-class, carrier-neutral, with cloud on-ramps and a 10G wave to five regional TierPoint facilities. Certified SOC 1/2 Type II, SOC 2 + HITRUST, GLBA, HIPAA, PCI-DSS, NIST SP 800-53, ISO 27001, ITAR and Data Privacy Framework registered. capacityMw is deliberately OMITTED: the only power figure the operator publishes is 'five redundant generators totaling 5.5 MW', which is BACKUP generator nameplate, not IT load, recording it as facility capacity would overstate the site. Directory listings associate this address with Cosentry, the regional provider TierPoint acquired; no source fetched this session states that, so it is noted rather than asserted. Coordinates are a street-address approximation. confidence is 'reported', single source (the operator's own page).
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- CyrusOne OCB1 Council Bluffs Data Center · Council Bluffs · CyrusOne5 mi · Operating
- LightEdge Omaha Data Center · Papillion · LightEdge6 mi · Operating
- Google Council Bluffs Data Center · Council Bluffs · Google7 mi · Operating
- 1623 Farnam · Omaha · 1623 Farnam7 mi · Operating · 8 MW
- First National Technology Solutions Omaha Data Center · Omaha · First National Technology Solutions8 mi · Operating
- H5 Data Centers Omaha (La Vista) · La Vista · H5 Data Centers8 mi · Operating · 17.3 MW
- Edged Council Bluffs Data Center Campus (Project Lola) · Council Bluffs · Edged Energy11 mi · Under construction
- Google Papillion Data Center · Papillion · Google11 mi · Operating · Supported
Questions people ask about this site
Is there opposition to the TierPoint Omaha - Bellevue Data Center in Bellevue?
Nothing on record as of August 16, 2026. No lawsuit, organized opposition, or contested hearing over TierPoint Omaha - Bellevue Data Center in Bellevue, Sarpy County, Nebraska appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the TierPoint Omaha - Bellevue Data Center?
No lawsuit over TierPoint Omaha - Bellevue Data Center appears in the record we track as of August 16, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does TierPoint Omaha - Bellevue Data Center use?
No water withdrawal figure for TierPoint Omaha - Bellevue Data Center is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates TierPoint Omaha - Bellevue Data Center, and how big is it?
TierPoint is the operator on record. We hold 25 sites for that company across the registry. Capacity on record is 5.5 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "TierPoint Omaha - Bellevue Data Center," updated August 16, 2026, https://suedatacenters.org/data-centers/tierpoint-omaha-bellevue-ne.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/tierpoint-omaha-bellevue-ne, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.TierPoint Omaha - Bellevue Data Center, 1001 North Fort Crook Road, Bellevue NE 68005; '100,000+ total square feet, 21,000+ square feet of raised floor space'; 'Five redundant generators totaling 5.5 MW' · TierPoint · retrieved August 14, 2026
- 2.TierPoint Omaha - Bellevue Data Center, 1001 North Fort Crook Road, Bellevue NE 68005; '100,000+ total square feet, 21,000+ square feet of raised floor space'; 'Five redundant generators totaling 5.5 MW' · TierPoint · retrieved August 16, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us