Published counts of operating US data centers in 2026 range from about 1,300 to about 4,400, because no federal agency counts them. Here is every number by year, what each one actually measures, and why the planned figure is the least reliable of all.

Key Takeaways

  • No federal agency counts data centers. There is no permit, registry, or census of them. Every number you have read comes from a private company's directory, and those directories disagree with each other by more than three to one.
  • Published counts of operating US data centers in 2026 range from 1,306 to 4,423 depending on who is counting and what they call a data center. The most careful public analysis, from Pew Research Center in April 2026, puts it at more than 3,000.
  • More than 1,500 US data centers are in development, and 39 percent of them are planned for counties that do not have a single one today.
  • The only federal series is demonstrably broken. Census establishment counts rank Virginia sixth and falling 2 percent, while Virginia is the largest data center market on Earth. The series counts corporate headquarters, not buildings.
  • Electricity is the only rigorously measured national series. Data centers used 176 terawatt hours in 2023, 4.4 percent of all US electricity, and the Department of Energy's lab projects 325 to 580 terawatt hours by 2028.
  • The planned number is the least reliable figure in this entire subject. Utilities have received about 1,066 gigawatts of data center power requests. Wood Mackenzie expects roughly 298 gigawatts of it to be committed, which means about 72 percent may never be built.

There are more than 3,000 operating data centers in the United States and more than 1,500 more in development, according to the Pew Research Center's April 2026 analysis, the most careful public count available. But that is one answer among several. Other published counts of operating US facilities in 2026 run from 1,306 to 4,423, a spread of more than three to one for the same country in the same year.

The reason is simple and worth stating plainly: no government agency counts data centers. There is no federal registry, no national permit, and no census of them. Every figure in circulation traces back to a private company's directory, and each directory draws the line in a different place. This page gives you the numbers by year, tells you exactly what each one measures, and explains why the "planned" figure is the softest number in the whole subject.

Free case review

Dealing with a data center near your home? See if you have a case.

The short answer, and why it is a range

Ask five sources how many data centers are operating in the United States and you get five different answers. These are all published 2026 figures, for the same country, in the same year.

Published counts of operating US data centers, 2026

Each source is counting something slightly different, and none of them is counting buildings the way a county assessor would.

The highest published count is more than three times the lowest. No source is wrong; they are answering different questions.

CleanViewSeptember 20261,306AterioSeptember 20262,084Pew Research Centervia Data Center Map, Feb 20263,068StatistaApril 20264,423
CleanViewSeptember 20261,306 data centers
AterioSeptember 20262,084 data centers
Pew Research Centervia Data Center Map, Feb 20263,068 data centers
StatistaApril 20264,423 data centers
Source: Pew Research Center analysis of Data Center Map (April 13, 2026); CleanView; Aterio; Statista. Pew figure is the sum of its four published regional totals.SueDataCenters.org

There is also no credible year by year count of US data centers. No directory publishes a consistent back series, and the federal data cannot supply one, so any chart showing facilities per year since 2014 is built on a definition that changed underneath it. The only defensible annual series for this industry is electricity, which is why this page charts that instead.

The gap between the counts above is not sloppiness. It is definitional. A directory that counts commercial colocation facilities will list a single suite inside a downtown office building as one data center. A directory that counts campuses will record a 500 acre hyperscale site with six buildings as one data center too. Some include enterprise server rooms run by hospitals and banks. Some include crypto mining facilities; some do not. Some count announced projects alongside operating ones.

There is no licensing regime that would settle it. A data center is not a regulated category the way a landfill, a hospital, or a power plant is. In most of the country it is approved as an ordinary industrial or commercial use, sometimes by right, which is precisely why so many residents discover one is coming only when the site work starts.

Why there is no official number

The federal government has one annual series that touches this industry: the Census Bureau's County Business Patterns, which counts business establishments under NAICS 5182, retitled in 2022 as Computing Infrastructure Providers, Data Processing, Web Hosting, and Related Services. We pulled the national and state files directly for 2017 through 2023.

It does not work, and one comparison shows why.

NAICS 5182 establishments by state, 2023

The six largest states in the federal count, with each state's 2017 figure and the change since.

Virginia, the largest data center market on Earth, ranks sixth in the federal count and went DOWN 2 percent. This series does not measure data centers.

California2,658 in 2017, up 2 percent2,698Texas1,285 in 2017, up 10 percent1,412Florida1,042 in 2017, up 21 percent1,266New York1,000 in 2017, up 1 percent1,013Pennsylvania806 in 2017, up 16 percent937Virginia652 in 2017, DOWN 2 percent641
California2,658 in 2017, up 2 percent2,698 establishments
Texas1,285 in 2017, up 10 percent1,412 establishments
Florida1,042 in 2017, up 21 percent1,266 establishments
New York1,000 in 2017, up 1 percent1,013 establishments
Pennsylvania806 in 2017, up 16 percent937 establishments
Virginia652 in 2017, DOWN 2 percent641 establishments
Source: SueDataCenters.org analysis of US Census Bureau County Business Patterns, state files, 2017 and 2023 (NAICS 5182, all legal forms of organization).SueDataCenters.org

Northern Virginia is the largest data center market in the world, roughly 20 gigawatts of capacity and on the order of 13 percent of all live global capacity, with Loudoun County alone holding more than 30 million square feet. The federal series has Virginia sixth and shrinking. California leads it, because California is where hosting and software companies keep their offices.

County Business Patterns counts corporate headquarters, not server halls. A hyperscale campus is usually owned by a company registered in another state, so the building lands in your county while the establishment is recorded somewhere else, or is absorbed into a parent filing under a different code. Nationally the count barely moved, rising about 5 percent between 2017 and 2023, across the exact years this industry became a national controversy. The buildings are real. They are simply not in this table, which is why every number in circulation comes from a private directory instead.

The one national number that is rigorously measured is electricity

If you want a defensible national trend, stop counting buildings and count power. Lawrence Berkeley National Laboratory, funded by the Department of Energy, published the 2024 United States Data Center Energy Usage Report in December 2024. It is the standard reference, and it is the number that actually governs what happens in your county, because power is what a data center competes with you for.

US data center electricity use, 2014 to 2028

Terawatt hours per year. The shaded range for 2028 is the report's low and high scenario, not a single forecast.

Data center electricity use roughly tripled from 2014 to 2023. By 2028 the low scenario alone is nearly double 2023, and the high scenario is more than triple it.

030060020142018202320285876176580325
2014flat at about 60 TWh through 201658 TWh
20181.9 percent of US electricity76 TWh
20234.4 percent of US electricity176 TWh
20286.7 to 12.0 percent of US electricity, projected range325 to 580 TWh
Source: Shehabi et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, December 2024. The report states these anchor years in text; it does not publish a full annual table.SueDataCenters.org

Two details in that report matter more than the headline. First, growth accelerated sharply: the compound annual growth rate was about 7 percent from 2014 to 2018 and about 18 percent from 2018 to 2023. Second, the 2028 figure is a range built from scenarios, not a prediction. The distance between 325 and 580 terawatt hours is mostly a question of how many AI accelerators ship and how hard they are run. Anyone citing a single 2028 number has picked one end of a band and dropped the other.

We chart only the years the report states in its own text. It presents the full series as a figure rather than a table, and we do not publish numbers read off a chart as though they were tabulated data.

Free case review

Living next to a data center? Find out if you have a case.

How many data centers are planned, and where

Pew Research Center analyzed the Data Center Map database as of February 19, 2026 and found more than 1,500 US data centers in development against roughly 3,000 operating. The geography of that pipeline is the single most important fact on this page for anyone reading it from home.

US data centers in development by region, 2026

Planned, under construction, and land banked projects. The note under each region is how many already exist there.

The South and Midwest are each adding more than 60 percent on top of what they already have.

South1,209 existing, up 62 percent754Midwest655 existing, up 64 percent419West807 existing, up 34 percent277Northeast397 existing, up 26 percent106
South1,209 existing, up 62 percent754 planned projects
Midwest655 existing, up 64 percent419 planned projects
West807 existing, up 34 percent277 planned projects
Northeast397 existing, up 26 percent106 planned projects
Source: Pew Research Center analysis of Data Center Map data current as of February 19, 2026, published April 13, 2026.SueDataCenters.org

Project counts understate the change, because the projects being built now are far larger than the ones already standing. Measured in power, which is the unit that decides whether a project strains your grid and your water, the pipeline dwarfs the installed base.

US data center capacity, operating versus planned

Megawatts across tracked US facilities, September 2026. Planned includes projects at every stage of announcement.

Tracked planned capacity is more than six times what is currently operating. Read the next section before treating that as a forecast.

Operating1,306 facilities61,443Planned2,091 projects380,103
Operating1,306 facilities61,443 MW
Planned2,091 projects380,103 MW
Source: CleanView US data center tracker, September 2026.SueDataCenters.org

Why the planned number is the least reliable figure in this subject

Here is the part that almost no coverage explains. The enormous numbers you see quoted for future data center power are drawn from utility interconnection queues, and a queue is a list of requests, not a list of projects. Filing costs a developer very little. Not filing, in a market where grid capacity is finite and first in line wins, could cost them everything. So developers file for the same project with several utilities in several states, then build in one place and let the other applications sit until they are withdrawn.

The result is double counting on a scale that distorts every forecast built on it.

US data center power requests versus expected commitments

Gigawatts of large load interconnection requests across US utilities, and how much analysts expect utilities to actually commit to serve.

About 72 percent of requested data center power is expected never to be drawn from the grid.

Requestedacross US utilities1,066Expected to be committedabout 28 percent of requests298Already committedas of October 2025160
Requestedacross US utilities1,066 GW
Expected to be committedabout 28 percent of requests298 GW
Already committedas of October 2025160 GW
Source: Wood Mackenzie, reported by Bloomberg August 12, 2026 (requested and expected); Wood Mackenzie press release, October 27, 2025 (committed).SueDataCenters.org

Utility planners say this openly. Zachary Ruzycki, director of resource planning at Great River Energy in Minnesota, told Utility Dive in May 2025 that "Some requests could be duplicates, but there's no good way to tell which." In the same reporting, Camus Energy chief executive Astrid Atkinson estimated that speculative interconnection requests ran five to 10 times higher than the number of data centers actually being built. Near Minneapolis and St. Paul, at least 11 data center campuses had been proposed since 2020 and only one, Meta's, had begun construction.

When a utility applies real filters, the number collapses. Exelon reported roughly 11 gigawatts of what it classified as high probability data center load over a decade, a small fraction of what its queues contained.

What these numbers mean if a data center is proposed near you

The statistic that should shape your expectations is Pew's: 39 percent of planned data centers are going into counties that have none today. Most communities now facing one have no local precedent, and very often no ordinance written with this use in mind. That cuts both ways. It means your county probably has no noise standard tailored to a facility that runs every hour of every day, and it also means the rules are still being written, which is the only period when a resident has real leverage.

Three things follow from the data on this page.

Early is the only time the numbers are soft. Before a rezoning or a special use permit is granted, conditions can still be attached: setbacks, decibel limits with a stated measurement method, water commitments, road agreements, and decommissioning bonds. After approval, those are contract terms you were never a party to. Our guide on how to fight a proposed data center walks the sequence, and some communities have used a moratorium to buy the time to write real standards.

The power request tells you the true size. A project described as a few buildings may have asked the utility for hundreds of megawatts. That figure predicts noise, water use for cooling, and pressure on your rates better than the site plan does. Start with who pays for data center power and what it does to your electric bill.

If one is already running near you, document now. Whatever the national count turns out to be, your claim depends on your own record: dated decibel readings, well tests, photographs, and complaint logs. Our guide on the evidence to document data center harm is the place to start, and if you want a lawyer to look at it, a free case review connects you with independent attorneys handling these cases in your state.

Frequently asked questions

How many data centers are in the US?

Published counts of operating US data centers in 2026 range from about 1,306 to about 4,423, depending on the source and what it counts. The Pew Research Center's April 2026 analysis of the Data Center Map database found more than 3,000 operational facilities. No federal agency counts data centers, so there is no official figure.

How many data centers are planned in the US?

Pew Research Center found more than 1,500 US data centers in development as of February 2026, including planned, under construction, and land banked projects. That figure counts projects rather than power. Measured in electricity, utilities have received roughly 1,066 gigawatts of data center interconnection requests, but Wood Mackenzie expects only about 298 gigawatts of that to be committed.

Does the government keep a list of data centers?

No. There is no federal registry, permit, or census of data centers in the United States. The closest official annual series is the Census Bureau's County Business Patterns count of business establishments in NAICS 5182, which reached 18,544 in 2023, but that counts companies with payroll rather than buildings and includes many businesses that are not data centers.

How much electricity do US data centers use?

US data centers used about 176 terawatt hours in 2023, which was 4.4 percent of total US electricity consumption, according to Lawrence Berkeley National Laboratory. That was up from about 76 terawatt hours in 2018, or 1.9 percent. The lab projects 325 to 580 terawatt hours by 2028, or 6.7 to 12.0 percent of US electricity.

Are most new data centers being built in rural areas?

Yes. Pew Research Center found that 67 percent of planned US data centers are in rural areas, while 87 percent of existing ones are in urban areas. It also found that 39 percent of planned facilities are going into counties that currently have no data center at all.

Why do data center counts vary so much between sources?

Because there is no standard definition and no official registry. One directory counts a single colocation suite inside an office building as one data center; another counts a multi building hyperscale campus as one. Some include enterprise server rooms or crypto mining facilities and some do not, and some blend announced projects into the operating total.

Related reading

  • How to Fight a Proposed Data Center Before It Breaks Ground

    Approval fights are the most successful category of data center litigation. Here is the playbook: reading the rezoning file, spotting notice and open meetings defects, organizing neighbors, referendums and recalls, moratoriums, and the short appeal clocks that decide everything.

  • Who Pays for Data Center Power: The Ratepayer Tracker

    The numbers behind the electric bill fight: PJM's capacity price rose from $28.92 to $333.44 per megawatt-day in three years, data centers account for $29.4 billion of the last four auctions' capacity costs by the market monitor's count, and the average PJM household faces an estimated $70 a month more by 2028. The running record of what regulators have found, which 23 states have answered with large load tariffs, what those tariffs require, and what a resident can do about a bill.

  • Data Centers and Your Electric Bill: Who Pays for the Power Boom?

    When a data center demands power plant-scale electricity, the grid upgrades land on everyone's bills unless regulators stop it. No consumer class action exists yet; the fight lives at utility commissions, and residents can join it. Here is how the cost shift works and how to participate.

  • Is It Safe to Live Near a Data Center? What the Evidence Actually Shows

    The honest answer, separated into three buckets: harms that are documented and measurable (noise, sleep disruption, combustion emissions, construction dust, well problems, property value and power cost effects), the health questions that are genuinely unresolved because nobody has studied them, and the claims that do not survive contact with the physics. With WHO, EPA, NIDCD and Health Canada sources, and the real setback numbers from actual agreements.

Is a data center disrupting your home?

Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.

  • Free case review
  • Independent attorneys
  • No obligation

Attorney or law firm handling data center matters? Speak with us