Silverton, Briscoe County, Texas · All 8 Soluna Holdings sites
Soluna Project Dorothy is an operating crypto mining site in Silverton, Texas (Briscoe County), operated by Soluna Holdings. The public record puts it at 98 MW operating.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Soluna Holdings
- Facility type
- Crypto mining
- Location
- Silverton, Briscoe County, TX
- Coordinates
- 34.3916, -101.3183 (approximate)
- Power capacity
- 98 MW operating
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- Not established from a public source
- Utility
- Not established from a public source
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Confirmed by multiple independent sources or official documentation
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- July 17, 2026OperatingPhases 1A (25MW) + 1B (25MW) + 2 (48MW) = 98 MW, co-located with the 150 MW Briscoe wind farm. Source: SEC EDGAR
Opposition and litigation at this site
Nothing on record as of November 4, 2026. No lawsuit, organized opposition, or contested hearing over Soluna Project Dorothy in Silverton, Briscoe County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.
People and entities in the record
Generate Capital · lender
Soluna's 10-Q reports a credit facility with Generate under which Tranche A-1 and A-3 financed Dorothy 1A and Dorothy 2, with the Dorothy subsidiaries granting Generate a first-priority leasehold deed of trust.
SourceSpring Lane Capital · investor
Soluna's 10-Q states Project Dorothy 2 is financed through an investment vehicle of Spring Lane Capital, which retains membership interests in it, and that Spring Lane earlier committed $35 million to Project Dorothy 1A.
Source
Notes on the record
Phases 1A (25MW) + 1B (25MW) + 2 (48MW) = 98 MW, co-located with the 150 MW Briscoe wind farm. Explicit entry in Soluna's 10-Q.
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
- Which utility serves it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
- Which utility serves it
- The electric service agreement or the utility's filing with the state public utility commission.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Soluna Project Grace · Silverton · Soluna Holdings5 mi · Under construction · 2 MW
- QTS-Lancium Hall County Data Center Campus · Turkey · QTS Data Centers / Lancium24 mi · Proposed
- Amazon Data Services Floydada Data Center · Floydada · Amazon Data Services, Inc.28 mi · Proposed
Questions people ask about this site
Is there opposition to the Soluna Project Dorothy data center in Silverton?
Nothing on record as of November 4, 2026. No lawsuit, organized opposition, or contested hearing over Soluna Project Dorothy in Silverton, Briscoe County, Texas appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.
Has anyone filed a lawsuit over the Soluna Project Dorothy data center?
No lawsuit over Soluna Project Dorothy appears in the record we track as of November 4, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Soluna Project Dorothy use?
No water withdrawal figure for Soluna Project Dorothy is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Soluna Project Dorothy, and how big is it?
Soluna Holdings is the operator on record. We hold 8 sites for that company across the registry. Capacity on record is 98 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Soluna Project Dorothy," updated November 4, 2026, https://suedatacenters.org/data-centers/soluna-project-dorothy-silverton-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.35.1 (November 2, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/soluna-project-dorothy-silverton-tx, retrieved November 5, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Soluna Holdings 10-Q Q1 2026 (site table) · SEC EDGAR · retrieved July 17, 2026
- 2.Soluna Holdings 10-Q for the quarter ended 2026-06-30 · Soluna Holdings, Inc. (SEC) · retrieved November 4, 2026
Is a data center disrupting your home?
Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.
- Tell us about your situation
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us