Sue Data Centers

Data Center Registry

NYDIG Duchesne Data Center Power Station

Upalco, Duchesne County, Utah · All 13 NYDIG DFM sites

OperatingNo reception on recordRecord updated November 2, 2026

NYDIG Duchesne Data Center Power Station is an operating crypto mining site in Upalco, Utah (Duchesne County), operated by NYDIG DFM LLC (NYDIG).

Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.

Facility record

Operating

Operator
NYDIG DFM LLC (NYDIG)
Facility type
Crypto mining
Location
Upalco, Duchesne County, UT
Coordinates
40.2900, -110.2020 (approximate)
Power capacity
Not established from a public source
Land
Not established from a public source
Investment
Not established from a public source
Announced
Not established from a public source
Utility
Not established from a public source
Power source
On site gas
Cooling
Not established from a public source
Water use
Not established from a public source
Jobs
Not established from a public source
Public subsidy
Not established from a public source
Community reception
No reception on record
Source confidence
Reported by at least one credible outlet or filing

Timeline from the record

Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.

  1. January 22, 2026
    Operating
    DAQ amended approval order states NYDIG owns and operates the data center power station Source: Utah Division of Air Quality
  2. September 18, 2024
    Permitted
    Original DAQ Approval Order DAQE-AN161210003-24 Source: Utah Division of Air Quality

Opposition and litigation at this site

Nothing on record as of November 2, 2026. No lawsuit, organized opposition, or contested hearing over NYDIG Duchesne Data Center Power Station in Upalco, Duchesne County, Utah appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

If you live near this site and something is happening that this page does not show, that is worth telling us. Send us the document and it goes in the record with the source attached. For sites where opposition is already established, see every contested site we track.

A new status, a permit, a reception finding, or a lawsuit. Nothing else, ever.

Power and water

Flare-gas-fired engines and turbine; 13,364 kW turbine plus eight 2,500 hp generator engines per DAQ approval order.

Notes on the record

The permit puts the site 1 mile northeast of Upalco (UTM 12N 567,859 E / 4,460,140 N, NAD83); lat/lon were converted by hand and are approximate. Equipment: two 530 hp gas compressor engines, eight 2,500 hp gas generator engines, and one 13,364 kW gas turbine. All of it burns gas that would otherwise be flared, from the adjacent XCL facility, and powers small onsite data centers. NYDIG DFM is the Digital Flare Mitigation bitcoin-mining business NYDIG agreed to buy from Crusoe in 2025, so the site is classed as crypto mining.

What the record does not establish, and the document that would

In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.

  • Power capacity in megawatts
  • Cooling method and water use
  • Tax abatements or other public subsidy
  • Permanent jobs promised
  • Land area
  • How the community has received it
  • Which utility serves it
Which document closes each gap
Power capacity in megawatts
The utility's large load service agreement, the interconnection request in the grid operator's queue, or the electrical site plan in the permit file.
Cooling method and water use
The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
Tax abatements or other public subsidy
The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
Permanent jobs promised
The economic development application or incentive agreement, which usually states a job commitment and a clawback.
Land area
The rezoning application, the plat, or the deed recorded with the county.
How the community has received it
Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Which utility serves it
The electric service agreement or the utility's filing with the state public utility commission.

Have one of these documents? Send it to us and we will add it to the record with attribution.

Other sites within 30 miles

Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.

Tell us about your situation

Living near NYDIG Duchesne Data Center Power Station?

Tell us the basics. Where a participating attorney in your state is available, we may share your information with them with your consent. Free, no obligation, and no guarantee anyone will contact you.

Questions people ask about this site

Is there opposition to the NYDIG Duchesne Data Center Power Station in Upalco?

Nothing on record as of November 2, 2026. No lawsuit, organized opposition, or contested hearing over NYDIG Duchesne Data Center Power Station in Upalco, Duchesne County, Utah appears in the sources this registry tracks. That is an absence in our sources rather than a finding that none exists, and local opposition often predates any coverage a national dataset would pick up.

Has anyone filed a lawsuit over the NYDIG Duchesne Data Center Power Station?

No lawsuit over NYDIG Duchesne Data Center Power Station appears in the record we track as of November 2, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.

How much water does NYDIG Duchesne Data Center Power Station use?

No water withdrawal figure for NYDIG Duchesne Data Center Power Station is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.

Who operates NYDIG Duchesne Data Center Power Station, and how big is it?

NYDIG DFM LLC (NYDIG) is the operator on record. We hold 13 sites for that company across the registry. No capacity figure is on record for this site.

How to cite this page

SueDataCenters.org Data Center Registry, "NYDIG Duchesne Data Center Power Station," updated November 2, 2026, https://suedatacenters.org/data-centers/nydig-duchesne-data-center-power-station-upalco-ut.

Facility data from Compute Atlas (E. Kubiak), version 1.35.1 (November 2, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/nydig-duchesne-data-center-power-station-upalco-ut, retrieved November 5, 2026.

Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.

Sources for this record

As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.

  1. 1.Utah DAQ Approval Order DAQE-AN161210005-26, NYDIG DFM LLC - Duchesne Data Center Power Station · Utah Division of Air Quality · retrieved November 2, 2026
  2. 2.NYDIG to acquire Crusoe's bitcoin mining operations (incl. Digital Flare Mitigation) · Bitcoin Magazine · retrieved November 2, 2026

Is a data center disrupting your home?

Tell us what is happening. Where a participating attorney who handles data center cases in your state is available, we may share your information with them with your consent. It is free and carries no obligation, but we cannot promise that anyone will contact you.

  • Tell us about your situation
  • Independent attorneys
  • No obligation