Data Center Registry
Helios (Galaxy Digital / CoreWeave)
Afton, Dickens County, Texas · All 3 Galaxy Digital sites
Helios (Galaxy Digital / CoreWeave) is an operating data center in Afton, Texas (Dickens County), operated by Galaxy Digital. The public record puts it at announced March 2025, 800 MW planned.
Every line on this page traces to a public source listed at the bottom. Where a figure was looked for and not found, the row says so. A blank is never a zero.
Facility record
Operating
- Operator
- Galaxy Digital
- Facility type
- Data center, AI use mixed
- Location
- Afton, Dickens County, TX
- Coordinates
- 33.7814, -100.8791 (approximate)
- Power capacity
- 200 MW operating; 800 MW planned
- Land
- Not established from a public source
- Investment
- Not established from a public source
- Announced
- March 2025
- Utility
- ERCOT grid (800 MW approved)
- Power source
- Grid
- Cooling
- Not established from a public source
- Water use
- Not established from a public source
- Jobs
- Not established from a public source
- Public subsidy
- Not established from a public source
- Community reception
- No reception on record
- Source confidence
- Reported by at least one credible outlet or filing
Timeline from the record
Newest first. Record entries come from the filings and reports the registry cites. Coverage entries are headlines from publisher feeds we monitor daily, linked to the outlet; last checked September 14, 2026.
- 2026OperatingGalaxy delivers Phase I (200 MW gross / 133 MW critical IT load) to CoreWeave; site begins generating lease revenue. Remaining phases (toward 800 MW) still under construction, financed by a $1.4B, 36-month debt facility (plus $350M Galaxy equity) closed August 2025. Source: Data Center Dynamics
- March 2025Under constructionGalaxy signs a 15-year lease with CoreWeave to convert Helios to AI/HPC hosting (ERCOT-approved capacity expanded to 800 MW); Bitcoin-mining equipment wind-down begins. Source: CryptoBriefing
- December 2022OperatingArgo sells Helios to Galaxy Digital for approximately $65M amid the 2022 crypto-market downturn, alongside a two-year hosting agreement. Source: Argo Blockchain
- May 2022OperatingArgo Blockchain completes a 180 MW Bitcoin-mining facility ("Helios") on 160 acres in Dickens County, TX. Source: Argo Blockchain
Opposition and litigation at this site
The record carries no reception finding for Helios (Galaxy Digital / CoreWeave) in Afton, Dickens County, Texas, but it does carry this note as of July 10, 2026: No local community-reaction coverage (water/land/noise) surfaced in this research pass, flagged as an under-covered angle, not confirmed as non-contentious.
Power and water
800 MW ERCOT-approved for the site; Phase I delivered 200 MW gross power / 133 MW critical IT load to CoreWeave.
Notes on the record
Built by Argo Blockchain as a 180 MW Bitcoin-mining facility (2022), sold to Galaxy Digital in Dec 2022 amid the crypto downturn. Galaxy has converted the site to AI/HPC hosting for CoreWeave under a 15-year lease signed March 28, 2025; ERCOT has approved 800 MW for the site (up from the original 180 MW mining build). Bitcoin mining is reported wound down (equipment removal/demolition began Q2 2025) ahead of the CoreWeave conversion, no source found describes concurrent mining and AI operation. The $1.4B figure is a project-financing debt facility (36-month term, secured by Phase I assets), not total investment or deal value; Galaxy separately committed $350M equity, investmentUsd is deliberately omitted rather than picking one of these ambiguous figures. A separate, unreconciled $460M figure appears in one lower-confidence source and is not repeated here as fact. Coordinates are approximate (single-source, not independently cross-verified, geocoding tools could not confirm the street address this pass).
What the record does not establish, and the document that would
In every fight on our tracker the decisive fact came out of a public records request. These are the requests for this site.
- Cooling method and water use
- Tax abatements or other public subsidy
- Permanent jobs promised
- Land area
- How the community has received it
Which document closes each gap
- Cooling method and water use
- The water service agreement, any groundwater appropriation permit, and the mechanical narrative in the site plan.
- Tax abatements or other public subsidy
- The abatement, PILOT, or development agreement approved by the county, city, or development authority, and the state's data center sales tax exemption certificate if one was issued.
- Permanent jobs promised
- The economic development application or incentive agreement, which usually states a job commitment and a clawback.
- Land area
- The rezoning application, the plat, or the deed recorded with the county.
- How the community has received it
- Planning commission and governing body minutes, public comment records, and any petition or lawsuit filed in the county.
Have one of these documents? Send it to us and we will add it to the record with attribution.
Other sites within 30 miles
Distances are between recorded coordinates, many of which are a city or county centroid, so treat them as approximate. Cumulative load on one utility and one aquifer is the question a planning commission rarely asks.
- Galaxy Helios Data Center Campus · Afton · Galaxy Digital5 mi · Under construction · 1.6 GW · Supported
Questions people ask about this site
Is there opposition to the Helios (Galaxy Digital / CoreWeave) data center in Afton?
The record carries no reception finding for Helios (Galaxy Digital / CoreWeave) in Afton, Dickens County, Texas, but it does carry this note as of July 10, 2026: No local community-reaction coverage (water/land/noise) surfaced in this research pass, flagged as an under-covered angle, not confirmed as non-contentious.
Has anyone filed a lawsuit over the Helios (Galaxy Digital / CoreWeave) data center?
No lawsuit over Helios (Galaxy Digital / CoreWeave) appears in the record we track as of July 10, 2026. Residents most often reach a lawyer over water supply, well drawdown, noise from cooling plant, property value, or a rezoning approved without the notice the ordinance required. If any of that is happening near this site, it is worth a review whether or not a case has been filed yet.
How much water does Helios (Galaxy Digital / CoreWeave) use?
No water withdrawal figure for Helios (Galaxy Digital / CoreWeave) is on record here. Water use is rarely published voluntarily; it usually surfaces through a utility service agreement or a state withdrawal permit, both of which are public records. We leave the number blank rather than estimate one.
Who operates Helios (Galaxy Digital / CoreWeave), and how big is it?
Galaxy Digital is the operator on record. We hold 3 sites for that company across the registry. Capacity on record is 800 MW.
How to cite this page
SueDataCenters.org Data Center Registry, "Helios (Galaxy Digital / CoreWeave)," updated July 10, 2026, https://suedatacenters.org/data-centers/galaxy-helios-dickens-tx.
Facility data from Compute Atlas (E. Kubiak), version 1.32.0 (September 7, 2026), licensed CC BY 4.0, record https://www.compute-atlas.com/facilities/galaxy-helios-dickens-tx, retrieved September 14, 2026.
Corrections with a public source are welcome at the Compute Atlas record or through our contact page. The whole registry is available as CSV and JSON under CC BY 4.0.
Sources for this record
As compiled and cited by Compute Atlas, with our own reporting appended. Archived links are used where the original has moved.
- 1.Sale of Helios to Galaxy Digital Holdings · Argo Blockchain · retrieved July 10, 2026
- 2.Galaxy Digital Delivers First 200MW Phase to CoreWeave Under 15-Year Lease · CryptoBriefing · retrieved July 10, 2026
- 3.Galaxy Digital Closes $1.4bn Debt Facility for Helios Data Center Campus in Texas · Data Center Dynamics · retrieved July 10, 2026
- 4.Galaxy Delivers 133 MW of Critical IT Load to CoreWeave as Helios Bitcoin Mine Turns AI Hub · The Block · retrieved July 10, 2026
Is a data center disrupting your home?
Tell us what is happening. We will connect you with an independent attorney who handles data center cases in your state, free and with no obligation. These cases are commonly taken on contingency, so there are typically no upfront fees.
- Free case review
- Independent attorneys
- No obligation
Attorney or law firm handling data center matters? Speak with us