 "name": "SueDataCenters.org Data Center Registry",
 "url": "https://suedatacenters.org/data-centers",
 "documentation": "https://suedatacenters.org/data-centers/data",
 "license": "https://creativecommons.org/licenses/by/4.0/",
 "attribution": "Facility data from Compute Atlas (E. Kubiak) v1.32.0, CC BY 4.0, with case reporting and additional records by SueDataCenters.org. Cite both.",
 "basedOn": {
  "name": "Compute Atlas",
  "url": "https://www.compute-atlas.com",
  "version": "1.32.0",
  "versionDate": "2026-09-07",
  "doi": "https://doi.org/10.5281/zenodo.22284476"
 },
 "retrieved": "2026-09-14",
 "count": 1576,
 "profiles": 1441,
 "fields": [
  {
   "name": "id",
   "description": "Stable identifier. Matches the Compute Atlas facility id where the record came from the survey."
  },
  {
   "name": "name",
   "description": "Facility or campus name as it appears in the public record."
  },
  {
   "name": "operator",
   "description": "Operator or developer named in the record."
  },
  {
   "name": "company",
   "description": "Our company page slug where the operator maps to one, else blank."
  },
  {
   "name": "facility_type",
   "description": "data_center or crypto_mining."
  },
  {
   "name": "status",
   "description": "proposed, permitted, under_construction, operational, or cancelled."
  },
  {
   "name": "community_reception",
   "description": "supported, mixed, contested, opposed, litigation, or blank where no reception is on record."
  },
  {
   "name": "source_confidence",
   "description": "confirmed, reported, or rumored, per the survey's definitions."
  },
  {
   "name": "city",
   "description": ""
  },
  {
   "name": "county",
   "description": ""
  },
  {
   "name": "state",
   "description": "Two letter postal code."
  },
  {
   "name": "latitude",
   "description": "Decimal degrees. See coordinate_precision."
  },
  {
   "name": "longitude",
   "description": ""
  },
  {
   "name": "coordinate_precision",
   "description": "exact, approximate (city or county centroid), or blank."
  },
  {
   "name": "capacity_mw_planned",
   "description": "Planned or announced capacity in megawatts."
  },
  {
   "name": "capacity_mw_operational",
   "description": "Operating capacity in megawatts."
  },
  {
   "name": "land_acres",
   "description": ""
  },
  {
   "name": "investment_usd",
   "description": "Announced investment in US dollars."
  },
  {
   "name": "jobs_permanent",
   "description": "Permanent jobs promised in the record."
  },
  {
   "name": "jobs_construction",
   "description": ""
  },
  {
   "name": "cooling_type",
   "description": ""
  },
  {
   "name": "water_reported_mgd",
   "description": "Reported water use in million gallons per day."
  },
  {
   "name": "energy_source",
   "description": ""
  },
  {
   "name": "utility",
   "description": "Serving electric utility named in the record."
  },
  {
   "name": "on_site_generation_mw",
   "description": ""
  },
  {
   "name": "subsidy_programs",
   "description": "Number of public subsidy programs on record."
  },
  {
   "name": "subsidy_usd_known",
   "description": "Sum of subsidy amounts where an amount is on record."
  },
  {
   "name": "announced_date",
   "description": ""
  },
  {
   "name": "record_updated",
   "description": "Date the record was last changed."
  },
  {
   "name": "source_count",
   "description": "Number of cited sources."
  },
  {
   "name": "record_origin",
   "description": "compute-atlas or suedatacenters."
  },
  {
   "name": "case_files",
   "description": "URLs of our case files about this site, separated by a space."
  },
  {
   "name": "profile_url",
   "description": "The profile page, present where the record clears our publishing threshold."
  }
 ],
 "statuses": {
  "operational": "Operating",
  "under_construction": "Under construction",
  "permitted": "Permitted",
  "proposed": "Proposed",
  "cancelled": "Cancelled"
 },
 "receptions": {
  "litigation": "In litigation",
  "opposed": "Opposed",
  "contested": "Contested",
  "mixed": "Mixed reception",
  "supported": "Supported",
  "unknown": "No reception on record"
 },
 "facilities": [
  {
   "id": "prime-storage-powers-ferry-place-marietta-ga",
   "name": "1155 Powers Ferry Place Data Center (Prime Storage conversion)",
   "operator": "Prime Storage (Prime Group Holdings), end user undisclosed",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Marietta",
   "county": "Cobb",
   "state": "GA",
   "latitude": 33.926145,
   "longitude": -84.4857377,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 18,
   "capacity_mw_operational": null,
   "land_acres": 11,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prime-storage-powers-ferry-place-marietta-ga"
  },
  {
   "id": "123net-dc4-byron-center-mi",
   "name": "123NET DC4 Grand Rapids Data Center",
   "operator": "123NET",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Byron Center",
   "county": "Kent",
   "state": "MI",
   "latitude": 42.826202163837,
   "longitude": -85.67268596115,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-11",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/123net-dc4-byron-center-mi"
  },
  {
   "id": "123net-dc1-southfield-mi",
   "name": "123NET Southfield DC1",
   "operator": "123NET",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Southfield",
   "county": "Oakland",
   "state": "MI",
   "latitude": 42.4716416,
   "longitude": -83.2380417,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 4,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/123net-dc1-southfield-mi"
  },
  {
   "id": "123net-dc2-southfield-mi",
   "name": "123NET Southfield DC2 (Southfield Data Center NW)",
   "operator": "123NET",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Southfield",
   "county": "Oakland",
   "state": "MI",
   "latitude": 42.467179479879,
   "longitude": -83.234668656697,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/123net-dc2-southfield-mi"
  },
  {
   "id": "123net-dc3-southfield-mi",
   "name": "123NET Southfield DC3 (Southfield Data Center W)",
   "operator": "123NET",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Southfield",
   "county": "Oakland",
   "state": "MI",
   "latitude": 42.466994454342,
   "longitude": -83.234393055905,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-11",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/123net-dc3-southfield-mi"
  },
  {
   "id": "priseda-prosperity-drive-silver-spring-md",
   "name": "12401 Prosperity Drive Data Center",
   "operator": "Sansone Group / Priseda",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Silver Spring",
   "county": "Montgomery",
   "state": "MD",
   "latitude": 39.058994201626,
   "longitude": -76.965681665201,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 35.2,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/priseda-prosperity-drive-silver-spring-md"
  },
  {
   "id": "penzance-1500-gateway-fredericksburg-va",
   "name": "1500 Gateway Data Center (denied)",
   "operator": "1500 Gateway LLC (Penzance)",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Fredericksburg",
   "county": null,
   "state": "VA",
   "latitude": 38.301,
   "longitude": -77.509,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 83,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/penzance-1500-gateway-fredericksburg-va"
  },
  {
   "id": "security-land-woodlawn-baltimore-county-md",
   "name": "1500 Woodlawn Drive Data Center Campus",
   "operator": "Security Land and Development LP",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Woodlawn",
   "county": "Baltimore",
   "state": "MD",
   "latitude": 39.3196,
   "longitude": -76.7448,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 150,
   "capacity_mw_operational": null,
   "land_acres": 42,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Baltimore Gas and Electric",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-12",
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/security-land-woodlawn-baltimore-county-md"
  },
  {
   "id": "1623-farnam-omaha-ne",
   "name": "1623 Farnam",
   "operator": "1623 Farnam",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Omaha",
   "county": "Douglas",
   "state": "NE",
   "latitude": 41.2578,
   "longitude": -95.9375,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 8,
   "land_acres": null,
   "investment_usd": 10000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/1623-farnam-omaha-ne"
  },
  {
   "id": "165-halsey-street-newark-nj",
   "name": "165 Halsey Street",
   "operator": "Tishman Real Estate",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Newark",
   "county": "Essex",
   "state": "NJ",
   "latitude": 40.7369,
   "longitude": -74.1739,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 80,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/165-halsey-street-newark-nj"
  },
  {
   "id": "32-avenue-of-the-americas-ny",
   "name": "32 Avenue of the Americas",
   "operator": "Multi-tenant carrier hotel (Digital Realty, CoreSite, and other carrier/telecom tenants)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "New York",
   "county": "New York",
   "state": "NY",
   "latitude": 40.720012,
   "longitude": -74.004641,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Con Edison",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/32-avenue-of-the-americas-ny"
  },
  {
   "id": "netrality-325-hudson-street-ny",
   "name": "325 Hudson Street",
   "operator": "Netrality Properties (JV with Jamestown, LP); H5 Data Centers operates colocation space in the building",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "New York",
   "county": "New York",
   "state": "NY",
   "latitude": 40.7268,
   "longitude": -74.008,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/netrality-325-hudson-street-ny"
  },
  {
   "id": "365-data-centers-dt1-southfield-mi",
   "name": "365 Data Centers Detroit (DT1)",
   "operator": "365 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Southfield",
   "county": "Oakland",
   "state": "MI",
   "latitude": 42.4691728,
   "longitude": -83.2604844,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": 0.75,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/365-data-centers-dt1-southfield-mi"
  },
  {
   "id": "365datacenters-marlborough-ma",
   "name": "365 Data Centers Marlborough (MA1)",
   "operator": "365 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Marlborough",
   "county": "Middlesex",
   "state": "MA",
   "latitude": 42.3527,
   "longitude": -71.58411,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2.8,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/365datacenters-marlborough-ma"
  },
  {
   "id": "365-data-centers-washington-dc",
   "name": "365 Data Centers, Washington, D.C.",
   "operator": "365 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Washington",
   "county": null,
   "state": "DC",
   "latitude": 38.902580481701,
   "longitude": -77.029210511723,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/365-data-centers-washington-dc"
  },
  {
   "id": "four-three-glenbrook-salem-township-luzerne-pa",
   "name": "4-3 Glenbrook Group Salem Township Data Center Campus (Salem 3)",
   "operator": "4-3 Glenbrook Group",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Salem Township",
   "county": "Luzerne",
   "state": "PA",
   "latitude": 41.1078249,
   "longitude": -76.1791155,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 3500,
   "capacity_mw_operational": null,
   "land_acres": 4000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/four-three-glenbrook-salem-township-luzerne-pa"
  },
  {
   "id": "grandilla-foot-creek-491st-thomas-tonopah-az",
   "name": "491st Avenue and Thomas Road Data Center / Solar Site",
   "operator": "Grandilla (Arizona) Inc. and Foot Creek Corporation",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tonopah",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.481,
   "longitude": -113.134,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 638,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-28",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/grandilla-foot-creek-491st-thomas-tonopah-az"
  },
  {
   "id": "anchorstone-58-east-data-campus-ringgold-va",
   "name": "58 East Data Campus (Route 58 East Data Center Campus)",
   "operator": "Anchorstone Advisors LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Ringgold",
   "county": "Pittsylvania",
   "state": "VA",
   "latitude": 36.6048,
   "longitude": -79.2905,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 945.75,
   "investment_usd": 5000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/anchorstone-58-east-data-campus-ringgold-va"
  },
  {
   "id": "5c-group-vultr-prime-ohio-springfield-oh",
   "name": "5C Group / Vultr Data Center (Prime Ohio)",
   "operator": "5C Group (Hypertec Cloud + 5C Data Centers); tenant Vultr (The Constant Company, LLC)",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Springfield",
   "county": "Clark",
   "state": "OH",
   "latitude": 39.8664,
   "longitude": -83.7936,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 150,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 1300000000,
   "jobs_permanent": 120,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Ohio Edison / FirstEnergy",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": 127000000,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/5c-group-vultr-prime-ohio-springfield-oh"
  },
  {
   "id": "5c-mem01-memphis-tn",
   "name": "5C MEM01 Memphis (former Fred's headquarters)",
   "operator": "5C Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Memphis",
   "county": "Shelby",
   "state": "TN",
   "latitude": 35.0301213,
   "longitude": -89.936928,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 15,
   "capacity_mw_operational": null,
   "land_acres": 59,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/5c-mem01-memphis-tn"
  },
  {
   "id": "60-hudson-street-ny",
   "name": "60 Hudson Street",
   "operator": "Multi-tenant carrier hotel (Hudson Interxchange, Digital Realty, DataBank, Equinix, and 100+ telecom tenants)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "New York",
   "county": "New York",
   "state": "NY",
   "latitude": 40.71767,
   "longitude": -74.008348,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 15,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Con Edison",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-08",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/60-hudson-street-ny"
  },
  {
   "id": "9ldg-niagara-falls-ny",
   "name": "9LDG Niagara AI Data Center",
   "operator": "9 Lives Digital Group (9LDG)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Niagara Falls",
   "county": "Niagara",
   "state": "NY",
   "latitude": 43.0628,
   "longitude": -79.0175,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 22,
   "investment_usd": 100000000,
   "jobs_permanent": null,
   "jobs_construction": 500,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-08",
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/9ldg-niagara-falls-ny"
  },
  {
   "id": "a1-data-center-millville-nj",
   "name": "A1 Data Center Campus",
   "operator": "A1 Data Center",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Millville",
   "county": "Cumberland",
   "state": "NJ",
   "latitude": 39.402,
   "longitude": -75.043,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1400,
   "capacity_mw_operational": null,
   "land_acres": 66,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Atlantic City Electric",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/a1-data-center-millville-nj"
  },
  {
   "id": "aaim-data-centers-blue-earth-mn",
   "name": "AAIM Data Centers, Blue Earth (Minnesota 1)",
   "operator": "AAIM Data Centers",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Blue Earth",
   "county": "Faribault",
   "state": "MN",
   "latitude": 43.635,
   "longitude": -94.098,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 15,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aaim-data-centers-blue-earth-mn"
  },
  {
   "id": "aboutbit-merom-sullivan-county-in",
   "name": "AboutBit Merom Cryptocurrency Mining Facility",
   "operator": "AboutBit",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Merom",
   "county": "Sullivan",
   "state": "IN",
   "latitude": 39.067889,
   "longitude": -87.513056,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 115,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 50000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "WIN Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-05",
   "record_updated": "2026-09-02",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aboutbit-merom-sullivan-county-in"
  },
  {
   "id": "abundant-mines-cascadelocks-or",
   "name": "Abundant Mines, Cascade Locks Facility",
   "operator": "Abundant Mines (Good Life Realty LLC)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Cascade Locks",
   "county": "Hood River",
   "state": "OR",
   "latitude": 45.6697,
   "longitude": -121.8931,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/abundant-mines-cascadelocks-or"
  },
  {
   "id": "acehost-marion-tampa-fl",
   "name": "AceHost Marion Mining Facility",
   "operator": "AceHost",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Tampa",
   "county": "Hillsborough",
   "state": "FL",
   "latitude": 27.946873,
   "longitude": -82.455567,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 3,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/acehost-marion-tampa-fl"
  },
  {
   "id": "adams-fork-harless-datacenter-logan-county-wv",
   "name": "Adams Fork Energy Campus Data Center (Harless Industrial Park, Holden)",
   "operator": "TransGas Development Systems",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Holden",
   "county": "Logan",
   "state": "WV",
   "latitude": 37.8134,
   "longitude": -81.9822,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/adams-fork-harless-datacenter-logan-county-wv"
  },
  {
   "id": "adams-fork-wharncliffe-datacenter-mingo-county-wv",
   "name": "Adams Fork Energy Campus Data Center (Twisted Gun Golf Course, Wharncliffe)",
   "operator": "TransGas Development Systems",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Wharncliffe",
   "county": "Mingo",
   "state": "WV",
   "latitude": 37.6412,
   "longitude": -81.9689,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/adams-fork-wharncliffe-datacenter-mingo-county-wv"
  },
  {
   "id": "adp-ladysmith-data-hub-caroline-va",
   "name": "ADP Ladysmith Data Hub",
   "operator": "ADP Ladysmith Data Hub, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ruther Glen",
   "county": "Caroline",
   "state": "VA",
   "latitude": 38.00386898862997,
   "longitude": -77.5030262165529,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 140.38,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Rappahannock Electric Co-op",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/adp-ladysmith-data-hub-caroline-va"
  },
  {
   "id": "advanced-internet-technologies-fayetteville-nc",
   "name": "Advanced Internet Technologies (AIT) Fayetteville Data Center",
   "operator": "Advanced Internet Technologies, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Fayetteville",
   "county": "Cumberland",
   "state": "NC",
   "latitude": 35.085,
   "longitude": -78.97722,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-29",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/advanced-internet-technologies-fayetteville-nc"
  },
  {
   "id": "agriforce-east-palestine-columbiana-oh",
   "name": "AgriFORCE Bitcoin Mining Facility, East Palestine",
   "operator": "AgriFORCE Growing Systems Ltd.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "East Palestine",
   "county": "Columbiana",
   "state": "OH",
   "latitude": 40.8326,
   "longitude": -80.5432,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/agriforce-east-palestine-columbiana-oh"
  },
  {
   "id": "agriforce-west-point-columbiana-oh",
   "name": "AgriFORCE Bitcoin Mining Facility, West Point",
   "operator": "AgriFORCE Growing Systems Ltd.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "West Point",
   "county": "Columbiana",
   "state": "OH",
   "latitude": 40.662,
   "longitude": -80.702,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 3,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/agriforce-west-point-columbiana-oh"
  },
  {
   "id": "ainet-cybernap-glen-burnie-md",
   "name": "AiNET CyberNAP",
   "operator": "AiNET",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Glen Burnie",
   "county": "Anne Arundel",
   "state": "MD",
   "latitude": 39.169,
   "longitude": -76.612,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 80,
   "land_acres": 15,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ainet-cybernap-glen-burnie-md"
  },
  {
   "id": "ainet-one-market-center-baltimore-md",
   "name": "AiNET One Market Center (Baltimore Carrier Hotel)",
   "operator": "AiNET",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Baltimore",
   "county": null,
   "state": "MD",
   "latitude": 39.291652966378,
   "longitude": -76.619738877727,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 80,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "alaska-communications-anchorage-ak",
   "name": "Alaska Communications Data Center",
   "operator": "Alaska Communications",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Anchorage",
   "county": null,
   "state": "AK",
   "latitude": 61.188009403546,
   "longitude": -149.87239078076,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "canaan-alborz-happy-tx",
   "name": "Alborz Bitcoin Mine",
   "operator": "WindHQ LLC / Canaan Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Happy",
   "county": "Randall",
   "state": "TX",
   "latitude": 35.012,
   "longitude": -101.9165,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 40,
   "land_acres": null,
   "investment_usd": 46900000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "wind",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-03",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/canaan-alborz-happy-tx"
  },
  {
   "id": "aligned-coal-city-il",
   "name": "Aligned Coal City Campus",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Coal City",
   "county": "Grundy",
   "state": "IL",
   "latitude": 41.2575,
   "longitude": -88.303,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 305,
   "investment_usd": null,
   "jobs_permanent": 300,
   "jobs_construction": 2000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": 0.0415,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-11-25",
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-coal-city-il"
  },
  {
   "id": "aligned-atl-01-lithia-springs-ga",
   "name": "Aligned Data Centers ATL-01",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Lithia Springs",
   "county": "Douglas",
   "state": "GA",
   "latitude": 33.7943,
   "longitude": -84.6602,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-28",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "aligned-quantum-frederick-md",
   "name": "Aligned Data Centers IAD-04 Frederick",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Adamstown",
   "county": "Frederick",
   "state": "MD",
   "latitude": 39.263,
   "longitude": -77.387,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 72,
   "capacity_mw_operational": null,
   "land_acres": 75,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Potomac Edison / FirstEnergy",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-02",
   "record_updated": "2026-08-26",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-quantum-frederick-md"
  },
  {
   "id": "aligned-iad-06-frederick-md",
   "name": "Aligned Data Centers IAD-06 Frederick",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Frederick",
   "county": "Frederick",
   "state": "MD",
   "latitude": 39.3417,
   "longitude": -77.5089,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 72,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-08-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-iad-06-frederick-md"
  },
  {
   "id": "aligned-project-caprock-hale-county-tx",
   "name": "Aligned Data Centers Project Caprock",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Abernathy",
   "county": "Hale",
   "state": "TX",
   "latitude": 33.84,
   "longitude": -101.84,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 540,
   "capacity_mw_operational": null,
   "land_acres": 313,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Xcel Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-04",
   "record_updated": "2026-07-06",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-project-caprock-hale-county-tx"
  },
  {
   "id": "aligned-conesville-oh",
   "name": "Aligned Data Centers, Conesville Industrial Park",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Conesville",
   "county": "Coshocton",
   "state": "OH",
   "latitude": 40.27,
   "longitude": -81.83,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 340,
   "capacity_mw_operational": null,
   "land_acres": 197,
   "investment_usd": null,
   "jobs_permanent": 149,
   "jobs_construction": 1800,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AEP Ohio (PJM interconnect)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-09-09",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-conesville-oh"
  },
  {
   "id": "aligned-pataskala-licking-oh",
   "name": "Aligned Data Centers, Pataskala",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Pataskala",
   "county": "Licking",
   "state": "OH",
   "latitude": 39.9956,
   "longitude": -82.6743,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-pataskala-licking-oh"
  },
  {
   "id": "aligned-dfw-01-tx",
   "name": "Aligned DFW-01",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Plano",
   "county": "Collin",
   "state": "TX",
   "latitude": 33.0093142,
   "longitude": -96.6765617,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 60,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Oncor Electric Delivery",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-dfw-01-tx"
  },
  {
   "id": "aligned-dfw-03-tx",
   "name": "Aligned DFW-03",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Mansfield",
   "county": "Tarrant",
   "state": "TX",
   "latitude": 32.5498227,
   "longitude": -97.0748553,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 27,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Oncor Electric Delivery",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-dfw-03-tx"
  },
  {
   "id": "aligned-chillicothe-ross-oh",
   "name": "Aligned HPC Campus at Former Pixelle Paper Mill (Chillicothe)",
   "operator": "Aligned Data Centers (in partnership with U.S. Paper Mill LLC / U.S. Medical Glove Company)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Chillicothe",
   "county": "Ross",
   "state": "OH",
   "latitude": 39.3331,
   "longitude": -82.9824,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 1500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07-02",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-chillicothe-ross-oh"
  },
  {
   "id": "aligned-iad-01-va",
   "name": "Aligned IAD-01",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0136079,
   "longitude": -77.4705563,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 60,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-iad-01-va"
  },
  {
   "id": "aligned-iad-03-va",
   "name": "Aligned IAD-03",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 38.9886354,
   "longitude": -77.4407776,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-iad-03-va"
  },
  {
   "id": "aligned-neo-01-oh",
   "name": "Aligned NEO-01",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sandusky (Perkins Township)",
   "county": "Erie",
   "state": "OH",
   "latitude": 41.4321977,
   "longitude": -82.7189574,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 96,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Ohio Edison (FirstEnergy)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-neo-01-oh"
  },
  {
   "id": "aligned-ord-01-il",
   "name": "Aligned ORD-01",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Northlake",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.9140034,
   "longitude": -87.9175163,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 48,
   "land_acres": 18.5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-ord-01-il"
  },
  {
   "id": "aligned-ord-02-northlake-il",
   "name": "Aligned ORD-02",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Northlake",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.9169,
   "longitude": -87.8956,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 18.5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-ord-02-northlake-il"
  },
  {
   "id": "aligned-ord-03-elk-grove-village-il",
   "name": "Aligned ORD-03",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Elk Grove Village",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.0039,
   "longitude": -87.9703,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 36,
   "investment_usd": 285000000,
   "jobs_permanent": 21,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 17812500,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-ord-03-elk-grove-village-il"
  },
  {
   "id": "aligned-pdx-01-or",
   "name": "Aligned PDX-01",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5540594,
   "longitude": -122.9492507,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 27,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Portland General Electric (PGE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-pdx-01-or"
  },
  {
   "id": "aligned-phx-01-02-03-az",
   "name": "Aligned PHX-01/02/03",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Phoenix",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.6590546,
   "longitude": -112.1111595,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 55,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "Arizona Public Service (APS)",
   "on_site_generation_mw": 63,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-phx-01-02-03-az"
  },
  {
   "id": "aligned-phx13-glendale-az",
   "name": "Aligned PHX-13",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Glendale",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.5387,
   "longitude": -112.186,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 72,
   "capacity_mw_operational": null,
   "land_acres": 100,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Arizona Public Service (APS)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-04",
   "record_updated": "2026-09-10",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-phx13-glendale-az"
  },
  {
   "id": "aligned-west-jordan-ut",
   "name": "Aligned Salt Lake City Campus (SLC-01/02/03)",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "West Jordan",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.5861,
   "longitude": -111.96973,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 60,
   "capacity_mw_operational": 48,
   "land_acres": 55,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-west-jordan-ut"
  },
  {
   "id": "aligned-west-valley-city-ut",
   "name": "Aligned SLC-04",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "West Valley City",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.71498,
   "longitude": -112.05576,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-west-valley-city-ut"
  },
  {
   "id": "aliquippa-data-center-beaver-county-pa",
   "name": "Aliquippa Data Center (former J&L Steel site)",
   "operator": "Five 9s Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "rumored",
   "city": "Aliquippa",
   "county": "Beaver",
   "state": "PA",
   "latitude": 40.6023,
   "longitude": -80.2456,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 496,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aliquippa-data-center-beaver-county-pa"
  },
  {
   "id": "solstice-data-allen-park-mi",
   "name": "Allen Park Data Center",
   "operator": "Solstice Data",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Allen Park",
   "county": "Wayne",
   "state": "MI",
   "latitude": 42.2830061,
   "longitude": -83.1947008,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 26,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/solstice-data-allen-park-mi"
  },
  {
   "id": "alpha-technologies-huntington-wv",
   "name": "Alpha Technologies Huntington Headquarters Data Center",
   "operator": "Alpha Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Huntington",
   "county": "Cabell",
   "state": "WV",
   "latitude": 38.419045646836,
   "longitude": -82.437058798916,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 10000000,
   "jobs_permanent": 30,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/alpha-technologies-huntington-wv"
  },
  {
   "id": "alpha-technologies-south-charleston-wv",
   "name": "Alpha Technologies South Charleston DC01",
   "operator": "Alpha Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "South Charleston",
   "county": "Kanawha",
   "state": "WV",
   "latitude": 38.3530922,
   "longitude": -81.6962715,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/alpha-technologies-south-charleston-wv"
  },
  {
   "id": "alterra-development-marshall-mi",
   "name": "Alterra Marshall Technology & Energy Center",
   "operator": "Alterra Development",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Marshall",
   "county": "Calhoun",
   "state": "MI",
   "latitude": 42.276,
   "longitude": -84.955,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1400,
   "capacity_mw_operational": null,
   "land_acres": 270,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": 1000,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/alterra-development-marshall-mi"
  },
  {
   "id": "amazon-gilroy-ca",
   "name": "Amazon AWS Gilroy Data Center",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Gilroy",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 36.997,
   "longitude": -121.541,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 98,
   "capacity_mw_operational": null,
   "land_acres": 56,
   "investment_usd": 2000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": 0.016,
   "energy_source": "grid",
   "utility": "Pacific Gas & Electric (PG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-07",
   "record_updated": "2026-07-06",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/amazon-gilroy-ca"
  },
  {
   "id": "amazon-becker-mn",
   "name": "Amazon Becker Data Center (Suspended)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Becker",
   "county": "Sherburne",
   "state": "MN",
   "latitude": 45.397,
   "longitude": -93.876,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 348,
   "investment_usd": 1000000000,
   "jobs_permanent": 100,
   "jobs_construction": 1200,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Xcel Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-07-25",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/amazon-becker-mn"
  },
  {
   "id": "aws-boardman-morrow-county-or",
   "name": "Amazon Boardman Exascale Data Center Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Boardman",
   "county": "Morrow",
   "state": "OR",
   "latitude": 45.84,
   "longitude": -119.702,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 1300,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": "PacifiCorp (Pacific Power)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-03",
   "record_updated": "2026-07-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-boardman-morrow-county-or"
  },
  {
   "id": "aws-grafton-ma",
   "name": "Amazon Data Services Grafton",
   "operator": "Amazon Data Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Grafton",
   "county": "Worcester",
   "state": "MA",
   "latitude": 42.25013,
   "longitude": -71.68772,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1.8,
   "investment_usd": 15100000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-11",
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-grafton-ma"
  },
  {
   "id": "amazon-data-services-reno-storey-county-nv",
   "name": "Amazon Data Services Reno Data Center Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Sparks",
   "county": "Storey",
   "state": "NV",
   "latitude": 39.517683,
   "longitude": -119.479421,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "NV Energy (Sierra Pacific Power Company)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-01-23",
   "record_updated": "2026-09-11",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/amazon-data-services-reno-storey-county-nv"
  },
  {
   "id": "aws-westborough-ma",
   "name": "Amazon Data Services Westborough",
   "operator": "Amazon Data Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Westborough",
   "county": "Worcester",
   "state": "MA",
   "latitude": 42.28296,
   "longitude": -71.58339,
   "coordinate_precision": "representative_multi_site",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 19,
   "investment_usd": 11600000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-11",
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-westborough-ma"
  },
  {
   "id": "amazon-devlin-tech-park-va",
   "name": "Amazon Devlin Technology Park",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Bristow",
   "county": "Prince William",
   "state": "VA",
   "latitude": 38.724,
   "longitude": -77.558,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 188.5,
   "investment_usd": 700000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-07-06",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/amazon-devlin-tech-park-va"
  },
  {
   "id": "amazon-pecos-county-data-center-tx",
   "name": "Amazon Pecos County Data Center Campus",
   "operator": "Amazon Data Services, Inc.",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Pecos",
   "state": "TX",
   "latitude": 30.8981,
   "longitude": -102.8779,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 900000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-08-09",
   "record_updated": "2026-08-25",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/amazon-pecos-county-data-center-tx"
  },
  {
   "id": "amazon-perry-township-stark-oh",
   "name": "Amazon Perry Township Data Center",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Canton",
   "county": "Stark",
   "state": "OH",
   "latitude": 40.7517,
   "longitude": -81.4,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 240,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-03",
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/amazon-perry-township-stark-oh"
  },
  {
   "id": "amazon-project-rainier-new-carlisle-in",
   "name": "Amazon Project Rainier",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "New Carlisle",
   "county": "St. Joseph",
   "state": "IN",
   "latitude": 41.6978,
   "longitude": -86.5117,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 2200,
   "capacity_mw_operational": 590,
   "land_acres": 1200,
   "investment_usd": 11000000000,
   "jobs_permanent": 400,
   "jobs_construction": 600,
   "cooling_type": "air",
   "water_reported_mgd": 1.58,
   "energy_source": "grid",
   "utility": "Indiana Michigan Power (AEP)",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2024-04-25",
   "record_updated": "2026-08-16",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/amazon-project-rainier-new-carlisle-in"
  },
  {
   "id": "aws-benton-bossier-parish-la",
   "name": "Amazon Web Services Bossier Parish Campus (Benton)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Benton",
   "county": "Bossier",
   "state": "LA",
   "latitude": 32.77,
   "longitude": -93.74,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "SWEPCO (Southwestern Electric Power Company)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-02",
   "record_updated": "2026-08-27",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-benton-bossier-parish-la"
  },
  {
   "id": "aws-blanchard-caddo-parish-la",
   "name": "Amazon Web Services Caddo Parish Campus (Blanchard)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Blanchard",
   "county": "Caddo",
   "state": "LA",
   "latitude": 32.6,
   "longitude": -94.04,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "SWEPCO (Southwestern Electric Power Company)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-02",
   "record_updated": "2026-08-27",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-blanchard-caddo-parish-la"
  },
  {
   "id": "aws-falls-township-pa",
   "name": "Amazon Web Services Innovation Campus, Falls Township",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Falls Township",
   "county": "Bucks",
   "state": "PA",
   "latitude": 40.1545,
   "longitude": -74.7882,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": 1250,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "PECO",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-06",
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-falls-township-pa"
  },
  {
   "id": "aws-richmond-county-nc",
   "name": "Amazon Web Services Richmond County Data Center Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Rockingham",
   "county": "Richmond",
   "state": "NC",
   "latitude": 34.9445,
   "longitude": -79.775,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 800,
   "investment_usd": 10000000000,
   "jobs_permanent": 500,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Duke Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-06",
   "record_updated": "2026-08-29",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-richmond-county-nc"
  },
  {
   "id": "aws-resilient-technology-park-shreveport-la",
   "name": "Amazon Web Services Shreveport Campus (Resilient Technology Park)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Shreveport",
   "county": "Caddo",
   "state": "LA",
   "latitude": 32.5135356,
   "longitude": -93.7477839,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 6000000000,
   "jobs_permanent": 210,
   "jobs_construction": 2250,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Southwestern Electric Power Company (SWEPCO)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-08-19",
   "record_updated": "2026-08-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-resilient-technology-park-shreveport-la"
  },
  {
   "id": "aws-wilmington-clinton-county-oh",
   "name": "Amazon Web Services Wilmington Data Center Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Wilmington",
   "county": "Clinton",
   "state": "OH",
   "latitude": 39.4453,
   "longitude": -83.8286,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 471,
   "investment_usd": 4000000000,
   "jobs_permanent": 100,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 7,
   "record_origin": "suedatacenters",
   "case_files": "https://suedatacenters.org/lawsuits/wilmington-ohio-amazon-data-center-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/aws-wilmington-clinton-county-oh"
  },
  {
   "id": "american-bitcoin-niagara-falls-ny",
   "name": "American Bitcoin, Niagara Falls (\"Alpha Site\")",
   "operator": "American Bitcoin (Hut 8)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Niagara Falls",
   "county": "Niagara",
   "state": "NY",
   "latitude": 43.082124888357896,
   "longitude": -79.03094758819105,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 50,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/american-bitcoin-niagara-falls-ny"
  },
  {
   "id": "american-tower-edc-oklahoma-city-ok",
   "name": "American Tower EDC Oklahoma (Oklahoma City)",
   "operator": "American Tower",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Oklahoma City",
   "county": "Oklahoma County",
   "state": "OK",
   "latitude": 35.5896,
   "longitude": -97.4934,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 4,
   "capacity_mw_operational": null,
   "land_acres": 83.5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/american-tower-edc-oklahoma-city-ok"
  },
  {
   "id": "american-tower-reedy-creek-charlotte-nc",
   "name": "American Tower Reedy Creek Data Center (East Charlotte)",
   "operator": "American Tower",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Charlotte",
   "county": "Mecklenburg",
   "state": "NC",
   "latitude": 35.2703,
   "longitude": -80.7229,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 10,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/american-tower-reedy-creek-charlotte-nc"
  },
  {
   "id": "andover-hpc-development-nj",
   "name": "Andover HPC Data Center (former Newton Airport Site)",
   "operator": "Andover HPC Development",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Andover",
   "county": "Sussex",
   "state": "NJ",
   "latitude": 41.0419,
   "longitude": -74.7381,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 97,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "JCP&L (FirstEnergy)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-08",
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/andover-hpc-development-nj"
  },
  {
   "id": "pronghorn-antelope-cedar-city-ut",
   "name": "Antelope Data Center (Project Antelope)",
   "operator": "Pronghorn Development LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Cedar City",
   "county": "Iron",
   "state": "UT",
   "latitude": 37.6775,
   "longitude": -113.0619,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1500,
   "capacity_mw_operational": null,
   "land_acres": 640,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-04",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/pronghorn-antelope-cedar-city-ut"
  },
  {
   "id": "viridian-apecs-janesville-wi",
   "name": "APECS Data Center Campus (Former GM Assembly Plant)",
   "operator": "Viridian Acquisitions LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Janesville",
   "county": "Rock",
   "state": "WI",
   "latitude": 42.66331,
   "longitude": -89.02056,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 800,
   "capacity_mw_operational": null,
   "land_acres": 250,
   "investment_usd": 8000000000,
   "jobs_permanent": 600,
   "jobs_construction": 1200,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-08-18",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/viridian-apecs-janesville-wi"
  },
  {
   "id": "natelli-appeal-digital-park-lusby-md",
   "name": "Appeal Digital Park",
   "operator": "Natelli Holdings",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Lusby",
   "county": "Calvert",
   "state": "MD",
   "latitude": 38.39,
   "longitude": -76.435,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 133,
   "investment_usd": null,
   "jobs_permanent": 110,
   "jobs_construction": 6100,
   "cooling_type": "evaporative",
   "water_reported_mgd": 0.4,
   "energy_source": "grid",
   "utility": "SMECO",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/natelli-appeal-digital-park-lusby-md"
  },
  {
   "id": "apple-maiden-nc",
   "name": "Apple Maiden Data Center (iCloud)",
   "operator": "Apple",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Maiden",
   "county": "Catawba",
   "state": "NC",
   "latitude": 35.588607,
   "longitude": -81.256686,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 183,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Duke Energy",
   "on_site_generation_mw": 10,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2009",
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/apple-maiden-nc"
  },
  {
   "id": "apple-mesa-az",
   "name": "Apple Mesa Data Center (Global Command Center)",
   "operator": "Apple",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Mesa",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.3615205,
   "longitude": -111.6012177,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 83.17,
   "investment_usd": 2000000000,
   "jobs_permanent": 150,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "Salt River Project (SRP)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2015",
   "record_updated": "2026-08-31",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/apple-mesa-az"
  },
  {
   "id": "apple-prineville-or",
   "name": "Apple Prineville Data Center Campus",
   "operator": "Apple",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Prineville",
   "county": "Crook",
   "state": "OR",
   "latitude": 44.30349,
   "longitude": -120.84639,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 150,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/apple-prineville-or"
  },
  {
   "id": "apple-reno-nv",
   "name": "Apple Reno Data Center (Reno Technology Park)",
   "operator": "Apple",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Sparks",
   "county": "Washoe",
   "state": "NV",
   "latitude": 39.563085,
   "longitude": -119.554805,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1700,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 89000000,
   "announced_date": "2012",
   "record_updated": "2026-08-14",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/apple-reno-nv"
  },
  {
   "id": "oppidan-apple-valley-technology-park-mn",
   "name": "Apple Valley Technology Park (Oppidan/Rockport)",
   "operator": "Oppidan Investment Company",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Apple Valley",
   "county": "Dakota",
   "state": "MN",
   "latitude": 44.7546223,
   "longitude": -93.1731744,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 134,
   "investment_usd": null,
   "jobs_permanent": 200,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/oppidan-apple-valley-technology-park-mn"
  },
  {
   "id": "apple-waukee-ia",
   "name": "Apple Waukee Data Center",
   "operator": "Apple",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Waukee",
   "county": "Dallas",
   "state": "IA",
   "latitude": 41.6193799,
   "longitude": -93.9258365,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 2000,
   "investment_usd": 1300000000,
   "jobs_permanent": 50,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "MidAmerican Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 208000000,
   "announced_date": "2017",
   "record_updated": "2026-08-14",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/apple-waukee-ia"
  },
  {
   "id": "applied-digital-adair-ia",
   "name": "Applied Digital Adair County Data Center",
   "operator": "Applied Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Adair",
   "county": "Adair",
   "state": "IA",
   "latitude": 41.5005601,
   "longitude": -94.6434954,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-04",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/applied-digital-adair-ia"
  },
  {
   "id": "applied-digital-delta-forge-1-la",
   "name": "Applied Digital Delta Forge 1 AI Factory Campus",
   "operator": "Applied Digital Corporation",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Boyce",
   "county": "Rapides",
   "state": "LA",
   "latitude": 31.4,
   "longitude": -92.65,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 300,
   "investment_usd": 3600000000,
   "jobs_permanent": 200,
   "jobs_construction": 1000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Cleco",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-05",
   "record_updated": "2026-09-03",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/applied-digital-delta-forge-1-la"
  },
  {
   "id": "applied-digital-deuel-county-sd",
   "name": "Applied Digital Deuel County AI Campus",
   "operator": "Applied Digital Corporation",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Toronto",
   "county": "Deuel",
   "state": "SD",
   "latitude": 44.567,
   "longitude": -96.62,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 430,
   "capacity_mw_operational": null,
   "land_acres": 200,
   "investment_usd": null,
   "jobs_permanent": 200,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Otter Tail Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-07-25",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/applied-digital-deuel-county-sd"
  },
  {
   "id": "applied-digital-jamestown-nd",
   "name": "Applied Digital Jamestown Facility",
   "operator": "Applied Digital Corporation",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Jamestown",
   "county": "Stutsman",
   "state": "ND",
   "latitude": 47.029587,
   "longitude": -98.679092,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 106,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-18",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "applied-digital-polaris-forge-1-ellendale-nd",
   "name": "Applied Digital Polaris Forge 1",
   "operator": "Applied Digital Corporation",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Ellendale",
   "county": "Dickey",
   "state": "ND",
   "latitude": 46.003,
   "longitude": -98.509,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 400,
   "capacity_mw_operational": 100,
   "land_acres": 320,
   "investment_usd": 5300000000,
   "jobs_permanent": 350,
   "jobs_construction": 450,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Montana-Dakota Utilities",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-06",
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/applied-digital-polaris-forge-1-ellendale-nd"
  },
  {
   "id": "applied-digital-polaris-forge-2-harwood-nd",
   "name": "Applied Digital Polaris Forge 2",
   "operator": "Applied Digital Corporation",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Harwood",
   "county": "Cass",
   "state": "ND",
   "latitude": 47.02,
   "longitude": -97.025,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 280,
   "capacity_mw_operational": null,
   "land_acres": 900,
   "investment_usd": 3000000000,
   "jobs_permanent": 200,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Cass County Electric Cooperative / Minnkota Power Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-08",
   "record_updated": "2026-09-10",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/applied-digital-polaris-forge-2-harwood-nd"
  },
  {
   "id": "applied-digital-polaris-forge-3-oliver-nd",
   "name": "Applied Digital Polaris Forge 3",
   "operator": "Applied Digital Corporation",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Hanover",
   "county": "Oliver",
   "state": "ND",
   "latitude": 47.111,
   "longitude": -101.426,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 430,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": 200,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05",
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/applied-digital-polaris-forge-3-oliver-nd"
  },
  {
   "id": "archer-datacenter-faribault-mn",
   "name": "Archer Datacenter Faribault",
   "operator": "Archer Datacenter",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Faribault",
   "county": "Rice",
   "state": "MN",
   "latitude": 44.3654972,
   "longitude": -93.2871543,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 87.6,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/archer-datacenter-faribault-mn"
  },
  {
   "id": "archgreen-doniphan-hall-ne",
   "name": "ArchGreen Doniphan Data Center (proposed)",
   "operator": "ArchGreen Infrastructure",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Doniphan",
   "county": "Hall",
   "state": "NE",
   "latitude": 40.772,
   "longitude": -98.3709,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": 2,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-08",
   "record_updated": "2026-09-04",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/archgreen-doniphan-hall-ne"
  },
  {
   "id": "archgreen-grand-island-hall-ne",
   "name": "ArchGreen Grand Island Data Center",
   "operator": "ArchGreen Infrastructure",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Grand Island",
   "county": "Hall",
   "state": "NE",
   "latitude": 40.9423,
   "longitude": -98.4551,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 14,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Southern Public Power District",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-01",
   "record_updated": "2026-09-04",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/archgreen-grand-island-hall-ne"
  },
  {
   "id": "ardent-pittsburgh-mckees-rocks-pa",
   "name": "Ardent Data Centers Pittsburgh (McKees Rocks)",
   "operator": "Ardent Data Centers (Northern Data Group)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "McKees Rocks",
   "county": "Allegheny",
   "state": "PA",
   "latitude": 40.4646,
   "longitude": -80.081,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 20,
   "capacity_mw_operational": 5,
   "land_acres": 7.5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-17",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ardent-pittsburgh-mckees-rocks-pa"
  },
  {
   "id": "ardent-technologies-wilmington-clinton-oh",
   "name": "Ardent Technologies Wilmington Data Center",
   "operator": "Ardent Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Wilmington",
   "county": "Clinton",
   "state": "OH",
   "latitude": 39.4453393,
   "longitude": -83.8285375,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 500,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ardent-technologies-wilmington-clinton-oh"
  },
  {
   "id": "zinke-arizona-independent-technology-campus-pinal-az",
   "name": "Arizona Independent Technology Campus",
   "operator": "Zinke Investments LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Pinal",
   "state": "AZ",
   "latitude": 32.9229,
   "longitude": -112.0148,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1517,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/zinke-arizona-independent-technology-campus-pinal-az"
  },
  {
   "id": "ark-data-centers-akron-i-summit-county-oh",
   "name": "Ark Data Centers Akron I (fka Involta)",
   "operator": "Ark Data Centers (formerly Involta)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Akron",
   "county": "Summit",
   "state": "OH",
   "latitude": 41.057162,
   "longitude": -81.521388,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 1,
   "land_acres": null,
   "investment_usd": 25000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Ohio Edison (FirstEnergy)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2010-08",
   "record_updated": "2026-07-25",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ark-data-centers-akron-i-summit-county-oh"
  },
  {
   "id": "ark-data-centers-akron-ii-summit-county-oh",
   "name": "Ark Data Centers Akron II (fka Involta)",
   "operator": "Ark Data Centers (formerly Involta)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Akron",
   "county": "Summit",
   "state": "OH",
   "latitude": 41.057297,
   "longitude": -81.521336,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 1,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Ohio Edison (FirstEnergy)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2015",
   "record_updated": "2026-07-25",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ark-data-centers-akron-ii-summit-county-oh"
  },
  {
   "id": "ark-data-centers-green-bay-harrison-campus-wi",
   "name": "Ark Data Centers Green Bay (Harrison Campus)",
   "operator": "Involta (rebranded Ark Data Centers, May 2024)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Harrison",
   "county": "Calumet",
   "state": "WI",
   "latitude": 44.2044349,
   "longitude": -88.3449304,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 20,
   "capacity_mw_operational": null,
   "land_acres": 24.5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "We Energies",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ark-data-centers-green-bay-harrison-campus-wi"
  },
  {
   "id": "ark-data-centers-independence-cuyahoga-county-oh",
   "name": "Ark Data Centers Independence (fka Involta)",
   "operator": "Ark Data Centers (formerly Involta)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Independence",
   "county": "Cuyahoga",
   "state": "OH",
   "latitude": 41.360599,
   "longitude": -81.632511,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2016-05",
   "record_updated": "2026-07-25",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ark-data-centers-independence-cuyahoga-county-oh"
  },
  {
   "id": "ark-data-centers-marion-ia",
   "name": "Ark Data Centers Marion (Cedar Rapids)",
   "operator": "Ark Data Centers (formerly Involta)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Marion",
   "county": "Linn",
   "state": "IA",
   "latitude": 42.0341,
   "longitude": -91.5871,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 0.81,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "armory-innovation-district-st-louis-mo",
   "name": "Armory Innovation District Data Center",
   "operator": "Contour / TerraWatt (with Steadfast City, THO Investments, ARCO, Lewis Rice)",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "St. Louis",
   "county": null,
   "state": "MO",
   "latitude": 38.636,
   "longitude": -90.237,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 120,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 3000000000,
   "jobs_permanent": 200,
   "jobs_construction": 1050,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/st-louis-midtown-data-center-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/armory-innovation-district-st-louis-mo"
  },
  {
   "id": "artemis-technologies-cave-city-ar",
   "name": "Artemis Technologies Cave City Bitcoin Data Center",
   "operator": "Artemis Technologies",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "under_construction",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Cave City",
   "county": "Sharp",
   "state": "AR",
   "latitude": 35.94806,
   "longitude": -91.55083,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/artemis-technologies-cave-city-ar"
  },
  {
   "id": "edgeconnex-ashville-oh",
   "name": "Ashville Campus",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Ashville",
   "county": "Pickaway",
   "state": "OH",
   "latitude": 39.72,
   "longitude": -83.03,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 680,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "South Central Power Company",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 10,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/ashville-ohio-data-center-referendum",
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-ashville-oh"
  },
  {
   "id": "aspen-creek-digital-olathe-co",
   "name": "Aspen Creek Digital, Olathe Solar Bitcoin Mine",
   "operator": "Aspen Creek Digital Corporation",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Olathe",
   "county": "Montrose",
   "state": "CO",
   "latitude": 38.5986,
   "longitude": -107.973,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 6,
   "land_acres": 74,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": null,
   "on_site_generation_mw": 10,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-06",
   "record_updated": "2026-08-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "att-redwood-city-ca",
   "name": "AT&T Redwood City Data Center",
   "operator": "AT&T",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Redwood City",
   "county": "San Mateo",
   "state": "CA",
   "latitude": 37.4806769,
   "longitude": -122.2007195,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 4,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "atlas-agro-richland-data-center-campus-wa",
   "name": "Atlas Agro Richland Data Center Campus",
   "operator": "Atlas Agro North America",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Richland",
   "county": "Benton",
   "state": "WA",
   "latitude": 46.36,
   "longitude": -119.325,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 320,
   "capacity_mw_operational": null,
   "land_acres": 275,
   "investment_usd": 500000000,
   "jobs_permanent": 100,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09-22",
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/atlas-agro-richland-data-center-campus-wa"
  },
  {
   "id": "atlas-compute-ai-data-center-campus-fort-pierce-fl",
   "name": "Atlas Compute AI Data Center Campus",
   "operator": "Atlas Compute (infrastructure by Penguin Solutions)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Fort Pierce",
   "county": "St. Lucie",
   "state": "FL",
   "latitude": 27.44,
   "longitude": -80.33,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 240,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/atlas-compute-ai-data-center-campus-fort-pierce-fl"
  },
  {
   "id": "atlas-power-butte-mt",
   "name": "Atlas Power Butte Data Center",
   "operator": "Atlas Power",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Butte",
   "county": "Silver Bow",
   "state": "MT",
   "latitude": 45.930855,
   "longitude": -112.518238,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2018",
   "record_updated": "2026-08-16",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/atlas-power-butte-mt"
  },
  {
   "id": "atlas-power-williston-nd",
   "name": "Atlas Power Data Center (Williston)",
   "operator": "Atlas Power",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Williston",
   "county": "Williams",
   "state": "ND",
   "latitude": 48.147,
   "longitude": -103.618,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 700,
   "capacity_mw_operational": 240,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022",
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/atlas-power-williston-nd"
  },
  {
   "id": "atterix-raton-digital-hub-nm",
   "name": "Atterix Raton Advanced Digital Hub",
   "operator": "Atterix LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Raton",
   "county": "Colfax",
   "state": "NM",
   "latitude": 36.9033,
   "longitude": -104.4392,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": 0,
   "jobs_construction": 0,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-02",
   "record_updated": "2026-09-03",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/atterix-raton-digital-hub-nm"
  },
  {
   "id": "aureon-616-des-moines-ia",
   "name": "Aureon 616 Data Center",
   "operator": "Aureon",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Des Moines",
   "county": "Polk",
   "state": "IA",
   "latitude": 41.5880038,
   "longitude": -93.6310193,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-04",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aureon-616-des-moines-ia"
  },
  {
   "id": "digital-realty-aurora-ai-factory-manassas-va",
   "name": "Aurora AI Factory",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Manassas",
   "county": "Prince William",
   "state": "VA",
   "latitude": 38.7509,
   "longitude": -77.4753,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 96,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10-28",
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-aurora-ai-factory-manassas-va"
  },
  {
   "id": "edgeconnex-cedar-creek-tx",
   "name": "AUS02 / Cedar Creek Campus",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Cedar Creek",
   "county": "Bastrop",
   "state": "TX",
   "latitude": 30.139438,
   "longitude": -97.565051,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 384,
   "capacity_mw_operational": null,
   "land_acres": 140,
   "investment_usd": 1400000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-cedar-creek-tx"
  },
  {
   "id": "avaio-appomattox-va",
   "name": "AVAIO Appomattox Data Center Campus",
   "operator": "AVAIO Digital Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Appomattox",
   "county": "Appomattox County",
   "state": "VA",
   "latitude": 37.43,
   "longitude": -78.8,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 452,
   "investment_usd": 3000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-12-10",
   "record_updated": "2026-08-27",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/avaio-appomattox-va"
  },
  {
   "id": "avaio-digital-leo-little-rock-ar",
   "name": "AVAIO Digital Leo Campus",
   "operator": "AVAIO Digital Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": null,
   "county": "Pulaski",
   "state": "AR",
   "latitude": 34.68,
   "longitude": -92.296,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 760,
   "investment_usd": 6000000000,
   "jobs_permanent": 500,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Entergy Arkansas",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-01",
   "record_updated": "2026-07-06",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/avaio-digital-leo-little-rock-ar"
  },
  {
   "id": "avaio-perseus-pittsburg-ca",
   "name": "AVAIO Digital Perseus",
   "operator": "AVAIO Digital Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Pittsburg",
   "county": "Contra Costa",
   "state": "CA",
   "latitude": 38.011358,
   "longitude": -121.91098,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 99,
   "capacity_mw_operational": null,
   "land_acres": 76,
   "investment_usd": 800000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-12",
   "record_updated": "2026-08-02",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/avaio-perseus-pittsburg-ca"
  },
  {
   "id": "avaio-taurus-brandon-ms",
   "name": "AVAIO Digital Taurus",
   "operator": "AVAIO Digital Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Brandon",
   "county": "Rankin",
   "state": "MS",
   "latitude": 32.27,
   "longitude": -89.99,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 116,
   "capacity_mw_operational": null,
   "land_acres": 329,
   "investment_usd": 6000000000,
   "jobs_permanent": 60,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Entergy Mississippi",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-09-09",
   "source_count": 10,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/avaio-taurus-brandon-ms"
  },
  {
   "id": "prime-avondale-az",
   "name": "Avondale Campus",
   "operator": "Prime Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Avondale",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.44,
   "longitude": -112.35,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 240,
   "capacity_mw_operational": null,
   "land_acres": 66.5,
   "investment_usd": 3000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Salt River Project (SRP)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05",
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prime-avondale-az"
  },
  {
   "id": "aws-arlington-gilliam-or",
   "name": "AWS Arlington Data Center Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Arlington",
   "county": "Gilliam",
   "state": "OR",
   "latitude": 45.7168,
   "longitude": -120.20088,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 406,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PacifiCorp",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "aws-butts-county-ga",
   "name": "AWS Butts County Data Center Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Jackson",
   "county": "Butts",
   "state": "GA",
   "latitude": 33.2946,
   "longitude": -83.9663,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-01-07",
   "record_updated": "2026-08-28",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-butts-county-ga"
  },
  {
   "id": "aws-calvert-cliffs-md",
   "name": "AWS Calvert County Data Center Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Lusby",
   "county": "Calvert",
   "state": "MD",
   "latitude": 38.437,
   "longitude": -76.443,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 2050,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "nuclear",
   "utility": "Constellation Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-03",
   "record_updated": "2026-09-10",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-calvert-cliffs-md"
  },
  {
   "id": "aws-clinton-hinds-ms",
   "name": "AWS Clinton Data Center",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Clinton",
   "county": "Hinds",
   "state": "MS",
   "latitude": 32.3415,
   "longitude": -90.3218,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 1000000000,
   "jobs_permanent": 100,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Entergy Mississippi",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-09-09",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-clinton-hinds-ms"
  },
  {
   "id": "aws-cosgray-hilliard-oh",
   "name": "AWS Cosgray Road Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Hilliard",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.04946,
   "longitude": -83.1761,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AEP Ohio (Ohio Power Company)",
   "on_site_generation_mw": 72.9,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-cosgray-hilliard-oh"
  },
  {
   "id": "aws-costas-ridgeland-ms",
   "name": "AWS Costas Property Campus (Ridgeland)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ridgeland",
   "county": "Madison",
   "state": "MS",
   "latitude": 32.400198,
   "longitude": -90.1818699,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 786,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-costas-ridgeland-ms"
  },
  {
   "id": "aws-crosby-court-franklin-county-oh",
   "name": "AWS Crosby Court Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Plain City",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.10187,
   "longitude": -83.198633,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 66.82,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AEP Ohio",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-crosby-court-franklin-county-oh"
  },
  {
   "id": "aws-cumulus-salem-township-pa",
   "name": "AWS Cumulus Data Center Campus, Salem Township",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Salem Township",
   "county": "Luzerne",
   "state": "PA",
   "latitude": 41.0949,
   "longitude": -76.1452,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 960,
   "capacity_mw_operational": 48,
   "land_acres": 1200,
   "investment_usd": 650000000,
   "jobs_permanent": 1000,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": 0.06,
   "energy_source": "nuclear",
   "utility": "Talen Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": 10000000,
   "announced_date": "2021-07",
   "record_updated": "2026-09-12",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-cumulus-salem-township-pa"
  },
  {
   "id": "aws-jefferson-township-fayette-oh",
   "name": "AWS Fayette County (Jefferson Township)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Jeffersonville",
   "county": "Fayette",
   "state": "OH",
   "latitude": 39.6534,
   "longitude": -83.5677,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-12",
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-jefferson-township-fayette-oh"
  },
  {
   "id": "aws-hayden-run-hilliard-oh",
   "name": "AWS Hayden Run Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hilliard",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.059949,
   "longitude": -83.134305,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 55.22,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2015",
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-hayden-run-hilliard-oh"
  },
  {
   "id": "aws-hermiston-or",
   "name": "AWS Hermiston Data Center Campuses",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Hermiston",
   "county": "Umatilla",
   "state": "OR",
   "latitude": 45.84041,
   "longitude": -119.28946,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Umatilla Electric Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-hermiston-or"
  },
  {
   "id": "aws-hobart-in",
   "name": "AWS Hobart Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Hobart",
   "county": "Lake",
   "state": "IN",
   "latitude": 41.517,
   "longitude": -87.263,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 2400,
   "capacity_mw_operational": null,
   "land_acres": 725,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "NIPSCO",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2025-11-24",
   "record_updated": "2026-08-16",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-hobart-in"
  },
  {
   "id": "aws-industrial-parkway-jerome-township-oh",
   "name": "AWS Industrial Parkway Campus (Jerome Township)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Plain City",
   "county": "Union",
   "state": "OH",
   "latitude": 40.134553,
   "longitude": -83.212394,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 86.18,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Consolidated Electric Coop",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-industrial-parkway-jerome-township-oh"
  },
  {
   "id": "aws-kline-township-schuylkill-pa",
   "name": "AWS Kline Township Data Center Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Kline Township",
   "county": "Schuylkill",
   "state": "PA",
   "latitude": 40.8699957,
   "longitude": -76.0215859,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": 500,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": 0.115,
   "energy_source": null,
   "utility": "PPL",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-kline-township-schuylkill-pa"
  },
  {
   "id": "aws-laveen-az",
   "name": "AWS Laveen Data Center Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Laveen",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.3727,
   "longitude": -112.1669,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 220,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-10",
   "record_updated": "2026-07-25",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-laveen-az"
  },
  {
   "id": "aws-mattermeade-caroline-va",
   "name": "AWS Mattermeade Tech Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Bowling Green",
   "county": "Caroline",
   "state": "VA",
   "latitude": 38.044,
   "longitude": -77.3527,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 770,
   "capacity_mw_operational": null,
   "land_acres": 1143,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-07-25",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-mattermeade-caroline-va"
  },
  {
   "id": "aws-2550-beech-road-new-albany-oh",
   "name": "AWS New Albany (2550 Beech Road)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "New Albany",
   "county": "Licking",
   "state": "OH",
   "latitude": 40.094442,
   "longitude": -82.750086,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 65.3,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-18",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-2550-beech-road-new-albany-oh"
  },
  {
   "id": "aws-3180-beech-road-new-albany-oh",
   "name": "AWS New Albany (3180 Beech Road)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "New Albany",
   "county": "Licking",
   "state": "OH",
   "latitude": 40.104129,
   "longitude": -82.750939,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 106.41,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-3180-beech-road-new-albany-oh"
  },
  {
   "id": "aws-beech-road-new-albany-oh",
   "name": "AWS New Albany (Beech/Miller Road Campus)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "New Albany",
   "county": "Licking",
   "state": "OH",
   "latitude": 40.11593,
   "longitude": -82.75731,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 458,
   "investment_usd": 3500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2023-09",
   "record_updated": "2026-08-08",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-beech-road-new-albany-oh"
  },
  {
   "id": "aws-newton-court-new-albany-oh",
   "name": "AWS New Albany (Newton Court)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "New Albany",
   "county": "Licking",
   "state": "OH",
   "latitude": 40.093702,
   "longitude": -82.72994,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 92.69,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-newton-court-new-albany-oh"
  },
  {
   "id": "aws-pdx154-boardman-airport-or",
   "name": "AWS PDX 154 (Boardman Airport Campus)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Boardman",
   "county": "Morrow",
   "state": "OR",
   "latitude": 45.81556,
   "longitude": -119.81621,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "aws-project-atlas-madison-county-ms",
   "name": "AWS Project Atlas, Madison County Mega Site (Canton)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Canton",
   "county": "Madison",
   "state": "MS",
   "latitude": 32.6121,
   "longitude": -90.039,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 927,
   "investment_usd": 10000000000,
   "jobs_permanent": 1000,
   "jobs_construction": 7000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "Entergy Mississippi",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-09-10",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-project-atlas-madison-county-ms"
  },
  {
   "id": "aws-project-cosmos-marysville-oh",
   "name": "AWS Project Cosmos",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Marysville",
   "county": "Union",
   "state": "OH",
   "latitude": 40.237,
   "longitude": -83.35,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 55,
   "investment_usd": 1000000000,
   "jobs_permanent": 50,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2024-10",
   "record_updated": "2026-07-06",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-project-cosmos-marysville-oh"
  },
  {
   "id": "aws-project-eagle-boling-wharton-county-tx",
   "name": "AWS Project Eagle (Wharton County)",
   "operator": "Amazon Data Services, Inc.",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Boling",
   "county": "Wharton",
   "state": "TX",
   "latitude": 29.3167,
   "longitude": -96.0553,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 2700,
   "investment_usd": 1200000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07-09",
   "record_updated": "2026-08-25",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-project-eagle-boling-wharton-county-tx"
  },
  {
   "id": "aws-galaxy-sidney-oh",
   "name": "AWS Project Galaxy, Sidney, OH",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Sidney",
   "county": "Shelby",
   "state": "OH",
   "latitude": 40.29,
   "longitude": -84.16,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 3000000000,
   "jobs_permanent": 75,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AES Ohio (Dayton Power and Light)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-07-07",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-galaxy-sidney-oh"
  },
  {
   "id": "aws-green-new-florence-mo",
   "name": "AWS Project Green Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "New Florence",
   "county": "Montgomery",
   "state": "MO",
   "latitude": 38.852,
   "longitude": -91.52,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1000,
   "investment_usd": 10000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Ameren Missouri",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-07-07",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-green-new-florence-mo"
  },
  {
   "id": "aws-project-spectrum-somervell-county-tx",
   "name": "AWS Project Spectrum (Somervell/Hood County)",
   "operator": "Amazon Data Services, Inc.",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Somervell",
   "state": "TX",
   "latitude": 32.2373,
   "longitude": -97.7561,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 435,
   "investment_usd": 5000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-02-25",
   "record_updated": "2026-08-25",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-project-spectrum-somervell-county-tx"
  },
  {
   "id": "aws-project-steamboat-warren-county-ms",
   "name": "AWS Project Steamboat, Warren County Data Center Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Vicksburg",
   "county": "Warren",
   "state": "MS",
   "latitude": 32.3526,
   "longitude": -90.8779,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 3000000000,
   "jobs_permanent": 200,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Entergy Mississippi",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-11-20",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-project-steamboat-warren-county-ms"
  },
  {
   "id": "aws-scioto-darby-hilliard-oh",
   "name": "AWS Scioto Darby Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Hilliard",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.01895,
   "longitude": -83.12439,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 152,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-scioto-darby-hilliard-oh"
  },
  {
   "id": "aws-sprigg-township-adams-county-oh",
   "name": "AWS Sprigg Township Data Center Campus (Buck Canyon)",
   "operator": "Amazon Web Services (land held via Buck Canyon Properties)",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Manchester",
   "county": "Adams",
   "state": "OH",
   "latitude": 38.63778,
   "longitude": -83.69306,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1300,
   "capacity_mw_operational": null,
   "land_acres": 1000,
   "investment_usd": 10000000000,
   "jobs_permanent": 500,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AES Ohio",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-02",
   "record_updated": "2026-09-09",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-sprigg-township-adams-county-oh"
  },
  {
   "id": "aws-trenton-madison-st-clair-butler-oh",
   "name": "AWS Trenton / Madison-St. Clair Township Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Trenton",
   "county": "Butler",
   "state": "OH",
   "latitude": 39.4808905,
   "longitude": -84.4577222,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 600,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-trenton-madison-st-clair-butler-oh"
  },
  {
   "id": "aws-umatilla-city-or",
   "name": "AWS Umatilla Data Center Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Umatilla",
   "county": "Umatilla",
   "state": "OR",
   "latitude": 45.91735,
   "longitude": -119.34252,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Umatilla Electric Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "aws-wallula-gap-walla-walla-wa",
   "name": "AWS Wallula Gap Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Wallula",
   "county": "Walla Walla",
   "state": "WA",
   "latitude": 46.0726,
   "longitude": -118.9135,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 500,
   "investment_usd": 4800000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Columbia Rural Electric Assn, Inc",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-10",
   "record_updated": "2026-09-05",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-wallula-gap-walla-walla-wa"
  },
  {
   "id": "aws-warner-road-jerome-township-oh",
   "name": "AWS Warner Road Campus (Jerome Township)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Plain City",
   "county": "Union",
   "state": "OH",
   "latitude": 40.118607,
   "longitude": -83.199984,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 92.78,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Union Rural Electric Coop, Inc",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-warner-road-jerome-township-oh"
  },
  {
   "id": "aws-wheatfield-in",
   "name": "AWS Wheatfield Campus (Project Rise)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Wheatfield",
   "county": "Jasper",
   "state": "IN",
   "latitude": 41.1955,
   "longitude": -87.0586,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 304,
   "investment_usd": 7000000000,
   "jobs_permanent": 250,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "NIPSCO",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-06-03",
   "record_updated": "2026-07-25",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-wheatfield-in"
  },
  {
   "id": "aws-wilmington-clinton-oh",
   "name": "AWS Wilmington Data Center Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Wilmington",
   "county": "Clinton",
   "state": "OH",
   "latitude": 39.4453393,
   "longitude": -83.8285375,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 471,
   "investment_usd": 4000000000,
   "jobs_permanent": 100,
   "jobs_construction": 200,
   "cooling_type": "evaporative",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-wilmington-clinton-oh"
  },
  {
   "id": "barrio-energy-tyler-smith-county-tx",
   "name": "Barrio Energy Tyler Data Center (West Erwin Street)",
   "operator": "Barrio Energy / Barrio Resources LLC (with Vulcan Core)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Tyler",
   "county": "Smith",
   "state": "TX",
   "latitude": 32.351,
   "longitude": -95.3127,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 12,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-06-17",
   "record_updated": "2026-09-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/barrio-energy-tyler-smith-county-tx"
  },
  {
   "id": "beale-gardner-johnson-county-ks",
   "name": "Beale Infrastructure Gardner Campus",
   "operator": "Beale Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Gardner",
   "county": "Johnson",
   "state": "KS",
   "latitude": 38.81,
   "longitude": -94.93,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 300,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Evergy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/beale-gardner-johnson-county-ks"
  },
  {
   "id": "beale-project-pilot-de-soto-ks",
   "name": "Beale Project Pilot (De Soto)",
   "operator": "Beale Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "De Soto",
   "county": "Johnson",
   "state": "KS",
   "latitude": 38.966,
   "longitude": -94.967,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 290,
   "investment_usd": 3100000000,
   "jobs_permanent": 100,
   "jobs_construction": 500,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Evergy",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2025-08",
   "record_updated": "2026-07-06",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/beale-project-pilot-de-soto-ks"
  },
  {
   "id": "canaan-bear-andrews-tx",
   "name": "Bear Bitcoin Mine",
   "operator": "WindHQ LLC / Canaan Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Andrews",
   "county": "Andrews",
   "state": "TX",
   "latitude": 32.2691,
   "longitude": -102.6042,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 40,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Lyntegar Electric Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-03",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/canaan-bear-andrews-tx"
  },
  {
   "id": "penzance-bedington-berkeley-county-wv",
   "name": "Bedington Campus",
   "operator": "Penzance Management",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": null,
   "county": "Berkeley",
   "state": "WV",
   "latitude": 39.554,
   "longitude": -77.882,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 600,
   "capacity_mw_operational": null,
   "land_acres": 548,
   "investment_usd": 4000000000,
   "jobs_permanent": 125,
   "jobs_construction": 1000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Potomac Edison (FirstEnergy)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-02",
   "record_updated": "2026-09-10",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/penzance-bedington-berkeley-county-wv"
  },
  {
   "id": "mmm-acquisitions-bells-ferry-marietta-ga",
   "name": "Bells Ferry Road Data Center (MMM Acquisitions)",
   "operator": "MMM Acquisitions LLC (developer; end user undisclosed)",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Marietta",
   "county": "Cobb",
   "state": "GA",
   "latitude": 33.9916854,
   "longitude": -84.5507217,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 31.44,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mmm-acquisitions-bells-ferry-marietta-ga"
  },
  {
   "id": "beltline-oklahoma-city-frisco-road-ok",
   "name": "Beltline Energy Oklahoma City Campus",
   "operator": "Beltline Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Oklahoma City",
   "county": "Oklahoma",
   "state": "OK",
   "latitude": 35.49,
   "longitude": -97.795,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 295.5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/beltline-oklahoma-city-frisco-road-ok"
  },
  {
   "id": "beltline-piedmont-kingfisher-county-ok",
   "name": "Beltline Energy Piedmont Site",
   "operator": "Beltline Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Piedmont",
   "county": "Kingfisher",
   "state": "OK",
   "latitude": 35.74394,
   "longitude": -97.81183,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 321,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/beltline-piedmont-kingfisher-county-ok"
  },
  {
   "id": "qts-kearneysville-berkeley-jefferson-wv",
   "name": "Berkeley/Jefferson County Data Center Campus (QTS Kearneysville)",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Kearneysville",
   "county": "Berkeley",
   "state": "WV",
   "latitude": 39.3729,
   "longitude": -77.8636,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 300,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-kearneysville-berkeley-jefferson-wv"
  },
  {
   "id": "bermuda-hundred-data-center-chesterfield-va",
   "name": "Bermuda Hundred Data Center (Old Bermuda Hundred Road)",
   "operator": "Undisclosed (landowner: Washington Single Family Fund3)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Chester",
   "county": "Chesterfield",
   "state": "VA",
   "latitude": 37.33798175,
   "longitude": -77.39493747,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 89,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bermuda-hundred-data-center-chesterfield-va"
  },
  {
   "id": "stack-berry-hill-va",
   "name": "Berry Hill / Southern Virginia Megasite",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Berry Hill",
   "county": "Pittsylvania",
   "state": "VA",
   "latitude": 36.68,
   "longitude": -79.35,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 2990,
   "investment_usd": 73000000000,
   "jobs_permanent": 2050,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": 7,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-03",
   "record_updated": "2026-08-26",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-berry-hill-va"
  },
  {
   "id": "bginusa-york-ne",
   "name": "BginUSA York Data Mining Complex",
   "operator": "BginUSA",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "permitted",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "York",
   "county": "York",
   "state": "NE",
   "latitude": 40.885,
   "longitude": -97.593,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 8000000,
   "jobs_permanent": 5,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Nebraska Public Power District (NPPD)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-04",
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bginusa-york-ne"
  },
  {
   "id": "switch-big-beaver-pa",
   "name": "Big Beaver Campus",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Big Beaver",
   "county": "Beaver",
   "state": "PA",
   "latitude": 40.75,
   "longitude": -80.33,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 382,
   "investment_usd": 1400000000,
   "jobs_permanent": 100,
   "jobs_construction": 2000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-04-30",
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-big-beaver-pa"
  },
  {
   "id": "mawson-bellefonte-pa",
   "name": "Big Digital Energy Bellefonte Facility",
   "operator": "Big Digital Energy",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Bellefonte",
   "county": "Centre",
   "state": "PA",
   "latitude": 40.9145,
   "longitude": -77.7791,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mawson-bellefonte-pa"
  },
  {
   "id": "mawson-midland-pa",
   "name": "Big Digital Energy Midland Facility",
   "operator": "Big Digital Energy",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Midland",
   "county": "Beaver",
   "state": "PA",
   "latitude": 40.6532,
   "longitude": -80.3968,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 120,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023",
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mawson-midland-pa"
  },
  {
   "id": "big-digital-energy-10netzero-hood-county-tx",
   "name": "Big Digital Energy-10NetZero Hood County AI Data Center Campus",
   "operator": "Big Digital Energy, Inc. / 10NetZero, Inc. (50/50 joint venture)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": null,
   "county": "Hood",
   "state": "TX",
   "latitude": 32.44194,
   "longitude": -97.76472,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 311,
   "capacity_mw_operational": 17,
   "land_acres": 50,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/big-digital-energy-10netzero-hood-county-tx"
  },
  {
   "id": "big-horn-data-hub-hardin-mt",
   "name": "Big Horn Data Hub (Hardin Generating Station)",
   "operator": "Beowulf Electricity & Data",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Hardin",
   "county": "Big Horn",
   "state": "MT",
   "latitude": 45.765054,
   "longitude": -107.598778,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "other",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2020",
   "record_updated": "2026-08-16",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/big-horn-data-hub-hardin-mt"
  },
  {
   "id": "quantica-bsdi-billings-mt",
   "name": "Big Sky Digital Infrastructure Campus",
   "operator": "Quantica Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Billings",
   "county": "Yellowstone",
   "state": "MT",
   "latitude": 45.823,
   "longitude": -108.7,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 5000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "NorthWestern Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-08",
   "record_updated": "2026-07-06",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/quantica-bsdi-billings-mt"
  },
  {
   "id": "big-watt-digital-onida-sd",
   "name": "Big Watt Digital Sully Buttes Mining Facility",
   "operator": "Big Watt Digital",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Onida",
   "county": "Sully",
   "state": "SD",
   "latitude": 44.705,
   "longitude": -100.3115,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": 30,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "wind",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022",
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/big-watt-digital-onida-sd"
  },
  {
   "id": "binary-net-vault-lincoln-ne",
   "name": "Binary Net The Vault Data Center",
   "operator": "Binary Net",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Lincoln",
   "county": "Lancaster",
   "state": "NE",
   "latitude": 40.81209,
   "longitude": -96.70226,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-04",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/binary-net-vault-lincoln-ne"
  },
  {
   "id": "aws-birchwood-data-campus-king-george-va",
   "name": "Birchwood Data Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "King George",
   "county": "King George",
   "state": "VA",
   "latitude": 38.25934134516552,
   "longitude": -77.32191549954541,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 869,
   "investment_usd": 6000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-birchwood-data-campus-king-george-va"
  },
  {
   "id": "bit-mining-viking-akron-summit-county-oh",
   "name": "BIT Mining / Viking Data Centers, Akron",
   "operator": "BIT Mining / Viking Data Centers",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Akron",
   "county": "Summit",
   "state": "OH",
   "latitude": 41.050056,
   "longitude": -81.473621,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 150,
   "capacity_mw_operational": 83,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bit-mining-viking-akron-summit-county-oh"
  },
  {
   "id": "bitdeer-clarington-oh",
   "name": "Bitdeer Clarington HPC/AI Campus",
   "operator": "Bitdeer",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Clarington",
   "county": "Monroe",
   "state": "OH",
   "latitude": 39.7748,
   "longitude": -80.8731,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 570,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AEP Ohio",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bitdeer-clarington-oh"
  },
  {
   "id": "bitdeer-knoxville-tn",
   "name": "Bitdeer Knoxville AI Datacenter (5101 S. National Drive)",
   "operator": "Bitdeer",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Knoxville",
   "county": "Knox",
   "state": "TN",
   "latitude": 35.941272,
   "longitude": -83.836066,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 86,
   "capacity_mw_operational": null,
   "land_acres": 9.88,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Knoxville Utilities Board",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bitdeer-knoxville-tn"
  },
  {
   "id": "bitdeer-massillon-stark-county-oh",
   "name": "Bitdeer Massillon Facility",
   "operator": "Bitdeer",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Massillon",
   "county": "Stark",
   "state": "OH",
   "latitude": 40.77069,
   "longitude": -81.53947,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 221,
   "capacity_mw_operational": 100,
   "land_acres": 31,
   "investment_usd": 100000000,
   "jobs_permanent": 70,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bitdeer-massillon-stark-county-oh"
  },
  {
   "id": "bitdeer-rockdale-tx",
   "name": "Bitdeer Rockdale Facility",
   "operator": "Bitdeer",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Rockdale",
   "county": "Milam",
   "state": "TX",
   "latitude": 30.6549,
   "longitude": -97.0025,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 170,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bitdeer-rockdale-tx"
  },
  {
   "id": "bitdeer-shalersville-portage-county-oh",
   "name": "Bitdeer Shalersville Data Center Campus",
   "operator": "Bitdeer",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Shalersville Township",
   "county": "Portage",
   "state": "OH",
   "latitude": 41.199,
   "longitude": -81.245,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 750,
   "capacity_mw_operational": null,
   "land_acres": 257,
   "investment_usd": 300000000,
   "jobs_permanent": 200,
   "jobs_construction": 400,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Ohio Edison (FirstEnergy)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bitdeer-shalersville-portage-county-oh"
  },
  {
   "id": "bitdeer-wenatchee-pangborn-wa",
   "name": "Bitdeer Wenatchee (Pangborn) Data Center",
   "operator": "Bitdeer",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "East Wenatchee",
   "county": "Douglas",
   "state": "WA",
   "latitude": 47.413902,
   "longitude": -120.209264,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 13,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PUD No 1 of Douglas County",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bitdeer-wenatchee-pangborn-wa"
  },
  {
   "id": "bitfarms-sharon-pa",
   "name": "Bitfarms Sharon Facility (former Westinghouse plant)",
   "operator": "Bitfarms Ltd. (Keel Infrastructure Corp.)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Sharon",
   "county": "Mercer",
   "state": "PA",
   "latitude": 41.2334,
   "longitude": -80.497,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 110,
   "capacity_mw_operational": 30,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-06-13",
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bitfarms-sharon-pa"
  },
  {
   "id": "bitzero-nekoma-nd",
   "name": "Bitzero Nekoma Data Center (Stanley R. Mickelsen Safeguard Complex)",
   "operator": "Bitzero",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Nekoma",
   "county": "Cavalier",
   "state": "ND",
   "latitude": 48.5894194,
   "longitude": -98.3567389,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": 2.5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-07-25",
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bitzero-nekoma-nd"
  },
  {
   "id": "bitzero-polson-lake-county-mt",
   "name": "Bitzero Polson Data Center (SKQ/Salish-Kootenai Dam)",
   "operator": "Bitzero",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Polson",
   "county": "Lake",
   "state": "MT",
   "latitude": 47.69,
   "longitude": -114.12639,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": "Energy Keepers, Inc. (CSKT)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bitzero-polson-lake-county-mt"
  },
  {
   "id": "oklahoma-ai-ventures-black-bear-noble-county-ok",
   "name": "Black Bear AI Data Center Campus",
   "operator": "Oklahoma AI Ventures LLC (Jericho Energy Ventures / Comstock Holding Companies JV)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Perry",
   "county": "Noble County",
   "state": "OK",
   "latitude": 36.2892,
   "longitude": -97.2836,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-04",
   "record_updated": "2026-09-02",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/oklahoma-ai-ventures-black-bear-noble-county-ok"
  },
  {
   "id": "blackstone-data-services-bluestone-tazewell-va",
   "name": "Blackstone Data Services, Bluestone Business and Technology Park",
   "operator": "Blackstone Data Services",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Tazewell",
   "state": "VA",
   "latitude": 37.26,
   "longitude": -81.33,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 12,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 18000000,
   "jobs_permanent": 5,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-10-31",
   "record_updated": "2026-08-27",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/blackstone-data-services-bluestone-tazewell-va"
  },
  {
   "id": "amazon-blackwell-road-warrenton-va",
   "name": "Blackwell Road Data Center (Warrenton)",
   "operator": "Amazon Data Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Warrenton",
   "county": "Fauquier",
   "state": "VA",
   "latitude": 38.72948224074257,
   "longitude": -77.78753470617198,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 40,
   "capacity_mw_operational": null,
   "land_acres": 42,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-03",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/warrenton-amazon-data-center-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/amazon-blackwell-road-warrenton-va"
  },
  {
   "id": "blockchain-digital-infrastructure-collin-county-tx",
   "name": "BlockchAIn Collin County AI GPU Hosting Site",
   "operator": "BlockchAIn Digital Infrastructure, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Collin",
   "state": "TX",
   "latitude": 33.1972,
   "longitude": -96.6398,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-25",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/blockchain-digital-infrastructure-collin-county-tx"
  },
  {
   "id": "blockchain-power-blacksville-monongalia-county-wv",
   "name": "Blockchain Power Corp. Blacksville Bitcoin Mining Site",
   "operator": "Blockchain Power Corp.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Blacksville",
   "county": "Monongalia",
   "state": "WV",
   "latitude": 39.7048,
   "longitude": -80.1364,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": 45,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 494461.08,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/blockchain-power-blacksville-monongalia-county-wv"
  },
  {
   "id": "blockchain-digital-infrastructure-reeves-county-tx",
   "name": "BlockchAIn Reeves County AI GPU Hosting Site",
   "operator": "BlockchAIn Digital Infrastructure, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Reeves",
   "state": "TX",
   "latitude": 31.4229,
   "longitude": -103.4933,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-25",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/blockchain-digital-infrastructure-reeves-county-tx"
  },
  {
   "id": "blockchain-digital-infrastructure-wise-county-tx",
   "name": "BlockchAIn Wise County Data Mining Site",
   "operator": "BlockchAIn Digital Infrastructure, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Wise",
   "state": "TX",
   "latitude": 33.2343,
   "longitude": -97.5864,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-25",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/blockchain-digital-infrastructure-wise-county-tx"
  },
  {
   "id": "blockfusion-niagara-falls-ny",
   "name": "Blockfusion Niagara Falls Facility (North East Data)",
   "operator": "Blockfusion",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Niagara Falls",
   "county": "Niagara",
   "state": "NY",
   "latitude": 43.0962,
   "longitude": -79.0377,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 100,
   "capacity_mw_operational": 46,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/blockfusion-niagara-falls-ny"
  },
  {
   "id": "blockware-solutions-belfry-pike-ky",
   "name": "Blockware Solutions Pike County Facility",
   "operator": "Blockware Solutions",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Belfry",
   "county": "Pike",
   "state": "KY",
   "latitude": 37.667552,
   "longitude": -82.345043,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 75,
   "capacity_mw_operational": 30,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/blockware-solutions-belfry-pike-ky"
  },
  {
   "id": "bloomberg-orangeburg-ny",
   "name": "Bloomberg LP Data Center",
   "operator": "Bloomberg LP",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Orangeburg",
   "county": "Rockland",
   "state": "NY",
   "latitude": 41.036652,
   "longitude": -73.986828,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": 4,
   "land_acres": null,
   "investment_usd": 123200000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bloomberg-orangeburg-ny"
  },
  {
   "id": "blue-fern-cle-elum-data-center-wa",
   "name": "Blue Fern Cle Elum Data Center",
   "operator": "Blue Fern Development",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Cle Elum",
   "county": "Kittitas",
   "state": "WA",
   "latitude": 47.18,
   "longitude": -120.97,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 20,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 200000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07-28",
   "record_updated": "2026-09-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/blue-fern-cle-elum-data-center-wa"
  },
  {
   "id": "bluebird-quad-cities-bettendorf-ia",
   "name": "Bluebird Quad Cities Data Center",
   "operator": "Bluebird Network",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Bettendorf",
   "county": "Scott",
   "state": "IA",
   "latitude": 41.5245,
   "longitude": -90.5157,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-14",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bluebird-quad-cities-bettendorf-ia"
  },
  {
   "id": "blusky-ai-delta-millard-county-ut",
   "name": "BluSky AI Delta Data Center",
   "operator": "BluSky AI Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Delta",
   "county": "Millard",
   "state": "UT",
   "latitude": 39.3502,
   "longitude": -112.5766,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": 25,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-25",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/blusky-ai-delta-millard-county-ut"
  },
  {
   "id": "blusky-ai-milford-ut",
   "name": "BluSky AI Milford Campus",
   "operator": "BluSky AI Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Milford",
   "county": "Beaver",
   "state": "UT",
   "latitude": 38.3936,
   "longitude": -113.0111,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 9.3,
   "capacity_mw_operational": null,
   "land_acres": 51.6,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "grid-interconnected power assigned via Digital Asset Management, LLC",
   "on_site_generation_mw": 9.3,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-25",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/blusky-ai-milford-ut"
  },
  {
   "id": "blusky-ai-nephi-ut",
   "name": "BluSky AI Nephi SkyMod Site",
   "operator": "BluSky AI Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Nephi",
   "county": "Juab",
   "state": "UT",
   "latitude": 39.71023,
   "longitude": -111.83632,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 4,
   "capacity_mw_operational": null,
   "land_acres": 0.375,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-08",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/blusky-ai-nephi-ut"
  },
  {
   "id": "blusky-ai-walsenburg-co",
   "name": "BluSky AI Walsenburg (Indian Pool Ranch) Modular Data Center",
   "operator": "BluSky AI Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Walsenburg",
   "county": "Huerfano",
   "state": "CO",
   "latitude": 37.6235234,
   "longitude": -104.780995,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 15,
   "capacity_mw_operational": null,
   "land_acres": 36,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09-02",
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/blusky-ai-walsenburg-co"
  },
  {
   "id": "hyperblock-bonner-mt",
   "name": "Bonner Mill Bitcoin Mine (Project Spokane / HyperBlock)",
   "operator": "HyperBlock Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Bonner",
   "county": "Missoula",
   "state": "MT",
   "latitude": 46.872644,
   "longitude": -113.873623,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2017",
   "record_updated": "2026-08-05",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hyperblock-bonner-mt"
  },
  {
   "id": "boomtown-lawton-ok",
   "name": "Boomtown Lawton Data Center, cancelled",
   "operator": "Boomtown",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "rumored",
   "city": "Lawton",
   "county": "Comanche",
   "state": "OK",
   "latitude": 34.6086,
   "longitude": -98.3903,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "stack-bossier-parish-la",
   "name": "Bossier Parish Campus (with Amazon)",
   "operator": "STACK Infrastructure",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Benton",
   "county": "Bossier",
   "state": "LA",
   "latitude": 32.69,
   "longitude": -93.74,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Southwestern Electric Power Company (SWEPCO)",
   "on_site_generation_mw": null,
   "subsidy_programs": 3,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-bossier-parish-la"
  },
  {
   "id": "boxminer-la-pine-or",
   "name": "Boxminer La Pine Bitcoin Mining Facility",
   "operator": "Boxminer (Hidden Pines LLC)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "La Pine",
   "county": "Deschutes",
   "state": "OR",
   "latitude": 43.6745541,
   "longitude": -121.4913298,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 20,
   "capacity_mw_operational": null,
   "land_acres": 19.5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Midstate Electric Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/boxminer-la-pine-or"
  },
  {
   "id": "breaker-street-data-center-jessup-lackawanna-pa",
   "name": "Breaker Street Data Center Campus",
   "operator": "Breaker Street Associates LLC (Catalyst Commercial Development)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Jessup",
   "county": "Lackawanna",
   "state": "PA",
   "latitude": 41.4712,
   "longitude": -75.5588,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 600,
   "capacity_mw_operational": null,
   "land_acres": 131,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/breaker-street-data-center-jessup-lackawanna-pa"
  },
  {
   "id": "brennan-barrington-hills-il",
   "name": "Brennan Barrington Hills Data Center",
   "operator": "Brennan Investment Group",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Barrington Hills",
   "county": null,
   "state": "IL",
   "latitude": 42.1049652,
   "longitude": -88.2408645,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 2000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/brennan-barrington-hills-il"
  },
  {
   "id": "amazon-bridgefield-tech-center-ashburn-loudoun-va",
   "name": "Bridgefield Tech Center",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.029784,
   "longitude": -77.4744148,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 122,
   "investment_usd": 427000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-08-03",
   "record_updated": "2026-08-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/amazon-bridgefield-tech-center-ashburn-loudoun-va"
  },
  {
   "id": "bridgeport-data-center-campus-coweta-ga",
   "name": "Bridgeport Data Center Campus",
   "operator": "Undisclosed developer (Bridgeport Industrial Park)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Moreland",
   "county": "Coweta",
   "state": "GA",
   "latitude": 33.2868748,
   "longitude": -84.7679526,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1063.9,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": 0.5,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bridgeport-data-center-campus-coweta-ga"
  },
  {
   "id": "lerner-brightseat-tech-park-md",
   "name": "Brightseat Tech Park",
   "operator": "Lerner Enterprises / The Tower Companies (Brightseat Associates LLC)",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Landover",
   "county": "Prince George's",
   "state": "MD",
   "latitude": 38.931,
   "longitude": -76.868,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 820,
   "capacity_mw_operational": null,
   "land_acres": 87,
   "investment_usd": 5000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Pepco (Exelon)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-03",
   "record_updated": "2026-09-13",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lerner-brightseat-tech-park-md"
  },
  {
   "id": "province-group-bristol-innovation-park-elkhart-county-in",
   "name": "Bristol Innovation Park",
   "operator": "The Province Group",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Bristol",
   "county": "Elkhart",
   "state": "IN",
   "latitude": 41.7203,
   "longitude": -85.8175,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 247,
   "investment_usd": 1000000000,
   "jobs_permanent": 150,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/province-group-bristol-innovation-park-elkhart-county-in"
  },
  {
   "id": "bristolville-25-lordstown-oh",
   "name": "Bristolville 25",
   "operator": "Bristolville 25 Developer LLC / BHGH Properties",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Lordstown",
   "county": "Trumbull",
   "state": "OH",
   "latitude": 41.18,
   "longitude": -80.87,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 133,
   "investment_usd": 3600000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Ohio Edison (FirstEnergy)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bristolville-25-lordstown-oh"
  },
  {
   "id": "wf-industrial-yaphank-ny",
   "name": "Brookhaven Digital Infrastructure Facility (WF Industrial / Wildflower, Yaphank)",
   "operator": "WF Industrial (Wildflower)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Yaphank",
   "county": "Suffolk",
   "state": "NY",
   "latitude": 40.832188,
   "longitude": -72.929969,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 176.6,
   "capacity_mw_operational": null,
   "land_acres": 71,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/wf-industrial-yaphank-ny"
  },
  {
   "id": "tract-buckeye-tech-corridor-az",
   "name": "Buckeye Tech Corridor",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Buckeye",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.4136,
   "longitude": -112.7203,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1800,
   "capacity_mw_operational": null,
   "land_acres": 2069,
   "investment_usd": 20000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Arizona Public Service (APS)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-02",
   "record_updated": "2026-08-31",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-buckeye-tech-corridor-az"
  },
  {
   "id": "hillwood-sterling-buick-city-flint-mi",
   "name": "Buick City Data Center",
   "operator": "Hillwood-Sterling",
   "company": "powerhouse-hillwood",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Flint",
   "county": "Genesee",
   "state": "MI",
   "latitude": 43.043131,
   "longitude": -83.6880801,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 200,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hillwood-sterling-buick-city-flint-mi"
  },
  {
   "id": "bull-church-data-center-caroline-va",
   "name": "Bull Church Data Center",
   "operator": "NRD Retail, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ruther Glen",
   "county": "Caroline",
   "state": "VA",
   "latitude": 38.00820612043225,
   "longitude": -77.49262214339025,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 87.53,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Rappahannock Electric Co-op",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bull-church-data-center-caroline-va"
  },
  {
   "id": "4am-development-burkhalter-road-statesboro-ga",
   "name": "Burkhalter Road Data Center (4AM Development)",
   "operator": "4AM Development, LLC (developer; operator undisclosed)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Statesboro",
   "county": "Bulloch",
   "state": "GA",
   "latitude": 32.4049295,
   "longitude": -81.7440222,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 27,
   "investment_usd": 1200000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-08-18",
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/4am-development-burkhalter-road-statesboro-ga"
  },
  {
   "id": "mesh-capital-cabin-field-road-data-center-campbell-va",
   "name": "Cabin Field Road Data Center",
   "operator": "Mesh Capital LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Campbell",
   "state": "VA",
   "latitude": 37.3407675,
   "longitude": -78.9909489,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 57,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mesh-capital-cabin-field-road-data-center-campbell-va"
  },
  {
   "id": "stack-caddo-parish-la",
   "name": "Caddo Parish Campus (with Amazon)",
   "operator": "STACK Infrastructure",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Blanchard",
   "county": "Caddo",
   "state": "LA",
   "latitude": 32.58,
   "longitude": -93.9,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Southwestern Electric Power Company (SWEPCO)",
   "on_site_generation_mw": null,
   "subsidy_programs": 3,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-caddo-parish-la"
  },
  {
   "id": "calethos-lithium-valley-imperial-county-ca",
   "name": "CalEthos Lithium Valley Data Center Campus",
   "operator": "CalEthos, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "El Centro",
   "county": "Imperial",
   "state": "CA",
   "latitude": 32.79,
   "longitude": -115.56,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 315,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Imperial Irrigation District (IID)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/calethos-lithium-valley-imperial-county-ca"
  },
  {
   "id": "beacon-calvert-al",
   "name": "Calvert Infrastructure Hub",
   "operator": "Beacon Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Calvert",
   "county": "Mobile",
   "state": "AL",
   "latitude": 31.1551748,
   "longitude": -88.0099997,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 650,
   "investment_usd": 6000000000,
   "jobs_permanent": 250,
   "jobs_construction": 1000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Alabama Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/beacon-calvert-al"
  },
  {
   "id": "arizona-land-consulting-camelback-creek-tonopah-az",
   "name": "Camelback Creek",
   "operator": "Arizona Land Consulting",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tonopah",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.509,
   "longitude": -112.962,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 320,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/arizona-land-consulting-camelback-creek-tonopah-az"
  },
  {
   "id": "cango-greenvolt-soperton-ga",
   "name": "Cango GreenVolt Soperton Facility",
   "operator": "Cango Inc. (GreenVolt Technology LLC)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Soperton",
   "county": "Treutlen",
   "state": "GA",
   "latitude": 32.3811,
   "longitude": -82.5917,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 50,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-08",
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cango-greenvolt-soperton-ga"
  },
  {
   "id": "powerhouse-poe-carrollton-industrial-campus-carroll-county-ky",
   "name": "Carrollton Industrial Campus",
   "operator": "PowerHouse Data Centers / Poe Companies",
   "company": "powerhouse-hillwood",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Carrollton",
   "county": "Carroll",
   "state": "KY",
   "latitude": 38.68,
   "longitude": -85.16583,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 500,
   "investment_usd": 9600000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/powerhouse-poe-carrollton-industrial-campus-carroll-county-ky"
  },
  {
   "id": "aws-carters-store-tech-campus-spotsylvania-va",
   "name": "Carter's Store Tech Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Spotsylvania",
   "county": "Spotsylvania",
   "state": "VA",
   "latitude": 38.1911,
   "longitude": -77.4687,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 313,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Rappahannock Electric Co-op",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-06",
   "record_updated": "2026-07-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-carters-store-tech-campus-spotsylvania-va"
  },
  {
   "id": "cascade-digital-power-hatfield-wi",
   "name": "Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro)",
   "operator": "Cascade Digital Power (Digital Power Optimization)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Hatfield",
   "county": "Jackson",
   "state": "WI",
   "latitude": 44.4146842,
   "longitude": -90.7306966,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-03",
   "record_updated": "2026-08-18",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cascade-digital-power-hatfield-wi"
  },
  {
   "id": "cassville-grant-county-wi",
   "name": "Cassville Data Center Campus (Undisclosed Developer)",
   "operator": "Undisclosed (major tech company, NDA not signed)",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Cassville",
   "county": "Grant",
   "state": "WI",
   "latitude": 42.716,
   "longitude": -91.007,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 500,
   "investment_usd": 1000000000,
   "jobs_permanent": 50,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Alliant Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-12",
   "record_updated": "2026-08-04",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cassville-grant-county-wi"
  },
  {
   "id": "kentucky-industrial-alliance-cave-point-cave-city-ky",
   "name": "Cave Point Commerce Center",
   "operator": "Kentucky Industrial Alliance LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Cave City",
   "county": "Barren",
   "state": "KY",
   "latitude": 37.1367544,
   "longitude": -85.9562169,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1200,
   "capacity_mw_operational": null,
   "land_acres": 600,
   "investment_usd": null,
   "jobs_permanent": 360,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/kentucky-industrial-alliance-cave-point-cave-city-ky"
  },
  {
   "id": "centeris-south-hill-puyallup-wa",
   "name": "Centeris South Hill Campus (SH1/SH2)",
   "operator": "Centeris (The Benaroya Company)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Puyallup",
   "county": "Pierce",
   "state": "WA",
   "latitude": 47.136,
   "longitude": -122.272,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": 86,
   "investment_usd": null,
   "jobs_permanent": 21,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/centeris-south-hill-puyallup-wa"
  },
  {
   "id": "centersquare-abq1-albuquerque-nm",
   "name": "Centersquare ABQ1",
   "operator": "Centersquare (formerly Cyxtera Technologies / Evoque Data Center Solutions)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Albuquerque",
   "county": "Bernalillo",
   "state": "NM",
   "latitude": 35.0844,
   "longitude": -106.6504,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Public Service Company of New Mexico (PNM)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-03",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "centersquare-gallatin-tn",
   "name": "Centersquare Gallatin (NAS) Campus",
   "operator": "Centersquare",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Gallatin",
   "county": "Sumner",
   "state": "TN",
   "latitude": 36.40406,
   "longitude": -86.39812,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 100,
   "capacity_mw_operational": null,
   "land_acres": 28.5,
   "investment_usd": 200000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/centersquare-gallatin-tn"
  },
  {
   "id": "centersquare-lax3-irvine-ca",
   "name": "Centersquare LAX3",
   "operator": "Centersquare (Cyxtera/Evoque)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Irvine",
   "county": "Orange",
   "state": "CA",
   "latitude": 33.6870931,
   "longitude": -117.8479769,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 24.9,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/centersquare-lax3-irvine-ca"
  },
  {
   "id": "centersquare-lax5-irvine-ca",
   "name": "Centersquare LAX5",
   "operator": "Centersquare (Cyxtera/Evoque)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Irvine",
   "county": "Orange",
   "state": "CA",
   "latitude": 33.6847703,
   "longitude": -117.8366956,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 17.3,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/centersquare-lax5-irvine-ca"
  },
  {
   "id": "centersquare-ord2-elk-grove-village-il",
   "name": "Centersquare ORD2 (Elk Grove Village)",
   "operator": "Centersquare (Csquare)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Elk Grove Village",
   "county": null,
   "state": "IL",
   "latitude": 41.9923175,
   "longitude": -87.9582323,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 25.9,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 17134551,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/centersquare-ord2-elk-grove-village-il"
  },
  {
   "id": "centersquare-ord4-lisle-il",
   "name": "Centersquare ORD4 (Lisle)",
   "operator": "Centersquare (Csquare)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Lisle",
   "county": "DuPage",
   "state": "IL",
   "latitude": 41.8023406,
   "longitude": -88.0948856,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 16148419,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/centersquare-ord4-lisle-il"
  },
  {
   "id": "centersquare-phx3-az",
   "name": "Centersquare PHX3",
   "operator": "Centersquare (Cyxtera/Evoque)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Mesa",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.4212542,
   "longitude": -111.8590191,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 17.3,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/centersquare-phx3-az"
  },
  {
   "id": "centersquare-shakopee-mn",
   "name": "Centersquare Shakopee (MSP1 Campus)",
   "operator": "Centersquare (fka Cyxtera / Evoque; site originally built by Compass Datacenters)",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Shakopee",
   "county": "Scott",
   "state": "MN",
   "latitude": 44.7965,
   "longitude": -93.482,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 19.1,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "centra-portland-me",
   "name": "CENTRA Digital Interconnect -- 340 Cumberland (PMW01)",
   "operator": "CENTRA Digital Interconnect",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Portland",
   "county": "Cumberland",
   "state": "ME",
   "latitude": 43.6578388,
   "longitude": -70.2613785,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/centra-portland-me"
  },
  {
   "id": "centra-msp1-eagan-mn",
   "name": "CENTRA MSP1",
   "operator": "CENTRA Digital Interconnect",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Eagan",
   "county": "Dakota",
   "state": "MN",
   "latitude": 44.8288628,
   "longitude": -93.1184514,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 12,
   "capacity_mw_operational": null,
   "land_acres": 10,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/centra-msp1-eagan-mn"
  },
  {
   "id": "cerebras-oklahoma-city-ok",
   "name": "Cerebras Oklahoma City Data Center",
   "operator": "Cerebras Systems",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Oklahoma City",
   "county": "Oklahoma",
   "state": "OK",
   "latitude": 35.4676,
   "longitude": -97.5164,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 10,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "OG&E",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-07-07",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cerebras-oklahoma-city-ok"
  },
  {
   "id": "air-products-cetronia-road-upper-macungie-pa",
   "name": "Cetronia Road Data Center (former Air Products site)",
   "operator": "Air Products",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Trexlertown",
   "county": "Lehigh",
   "state": "PA",
   "latitude": 40.5510536,
   "longitude": -75.5965424,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 194,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PPL Electric",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-08-17",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/air-products-cetronia-road-upper-macungie-pa"
  },
  {
   "id": "penzance-chantilly-premier-fairfax-va",
   "name": "Chantilly Premier",
   "operator": "Penzance",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Chantilly",
   "county": "Fairfax",
   "state": "VA",
   "latitude": 38.8943,
   "longitude": -77.4311,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 12,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-01",
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/penzance-chantilly-premier-fairfax-va"
  },
  {
   "id": "hp-cherokee-data-center-tulsa-ok",
   "name": "Cherokee Data Center (Tulsa)",
   "operator": "Hewlett-Packard",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tulsa",
   "county": "Tulsa County",
   "state": "OK",
   "latitude": 36.2085,
   "longitude": -95.9137,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hp-cherokee-data-center-tulsa-ok"
  },
  {
   "id": "canaan-chief-mountain-andrews-tx",
   "name": "Chief Mountain Bitcoin Mine",
   "operator": "WindHQ LLC / Canaan Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Andrews",
   "county": "Andrews",
   "state": "TX",
   "latitude": 32.285,
   "longitude": -102.625,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 40,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-03",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/canaan-chief-mountain-andrews-tx"
  },
  {
   "id": "powerhouse-chirisa-chester-va",
   "name": "Chirisa Technology Park, Richmond (Chester)",
   "operator": "PowerHouse Data Centers",
   "company": "powerhouse-hillwood",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Chester",
   "county": "Chesterfield",
   "state": "VA",
   "latitude": 37.3554,
   "longitude": -77.4416,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 120,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-08",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/powerhouse-chirisa-chester-va"
  },
  {
   "id": "cielo-gaffney-cherokee-county-sc",
   "name": "Cielo Digital Infrastructure Gaffney Campus",
   "operator": "Cielo Digital Infrastructure, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Gaffney",
   "county": "Cherokee",
   "state": "SC",
   "latitude": 35.0666365,
   "longitude": -81.5576062,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 2100000000,
   "jobs_permanent": 30,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-06",
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cielo-gaffney-cherokee-county-sc"
  },
  {
   "id": "cielo-haines-city-fl",
   "name": "Cielo Haines City Data Center",
   "operator": "Cielo Digital Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Haines City",
   "county": "Polk",
   "state": "FL",
   "latitude": 28.1114,
   "longitude": -81.6198,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 74,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": 0.15,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-06",
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cielo-haines-city-fl"
  },
  {
   "id": "cielo-clarksville-tn",
   "name": "Cielo Montgomery County AI Campus",
   "operator": "Cielo Digital Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Clarksville",
   "county": "Montgomery",
   "state": "TN",
   "latitude": 36.53,
   "longitude": -87.36,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 350,
   "capacity_mw_operational": null,
   "land_acres": 107,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Clarksville (CDE Lightband)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cielo-clarksville-tn"
  },
  {
   "id": "cipher-barber-lake-colorado-city-tx",
   "name": "Cipher Barber Lake Campus",
   "operator": "Cipher Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Colorado City",
   "county": "Mitchell",
   "state": "TX",
   "latitude": 32.3954,
   "longitude": -100.8687,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 587,
   "investment_usd": 1733000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cipher-barber-lake-colorado-city-tx"
  },
  {
   "id": "cipher-black-pearl-wink-tx",
   "name": "Cipher Black Pearl Campus",
   "operator": "Cipher Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Wink",
   "county": "Winkler",
   "state": "TX",
   "latitude": 31.751,
   "longitude": -103.1607,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 2000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Oncor",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-07-25",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cipher-black-pearl-wink-tx"
  },
  {
   "id": "cipher-colchis-tom-green-tx",
   "name": "Cipher Colchis Campus",
   "operator": "Cipher Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "San Angelo",
   "county": "Tom Green",
   "state": "TX",
   "latitude": 31.5290977,
   "longitude": -100.3212098,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 620,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-07-25",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cipher-colchis-tom-green-tx"
  },
  {
   "id": "cipher-digital-odessa-tx",
   "name": "Cipher Digital Odessa Facility",
   "operator": "Cipher Digital",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Odessa",
   "county": "Ector",
   "state": "TX",
   "latitude": 31.8457,
   "longitude": -102.3676,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 207,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cipher-digital-odessa-tx"
  },
  {
   "id": "cipher-digital-ulysses-center-township-morgan-oh",
   "name": "Cipher Digital Ulysses",
   "operator": "Cipher Digital (formerly Cipher Mining)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Morgan",
   "state": "OH",
   "latitude": 39.63028,
   "longitude": -81.64694,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": null,
   "land_acres": 195,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AEP Ohio",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-12-23",
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cipher-digital-ulysses-center-township-morgan-oh"
  },
  {
   "id": "cipher-mclennan-county-tx",
   "name": "Cipher McLennan HPC Data Center",
   "operator": "Cipher Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Waco",
   "county": "McLennan",
   "state": "TX",
   "latitude": 31.474088,
   "longitude": -96.96261,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": 300,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-10",
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cipher-mclennan-county-tx"
  },
  {
   "id": "cipher-mikeska-mcculloch-county-tx",
   "name": "Cipher Mikeska HPC Data Center",
   "operator": "Cipher Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Brady",
   "county": "McCulloch",
   "state": "TX",
   "latitude": 31.1317,
   "longitude": -99.3349,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-17",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cipher-mikeska-mcculloch-county-tx"
  },
  {
   "id": "cipher-milsing-huntsville-walker-tx",
   "name": "Cipher Milsing HPC Data Center",
   "operator": "Cipher Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Huntsville",
   "county": "Walker",
   "state": "TX",
   "latitude": 30.7235,
   "longitude": -95.5508,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 187,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cipher-milsing-huntsville-walker-tx"
  },
  {
   "id": "cipher-reveille-cotulla-la-salle-tx",
   "name": "Cipher Reveille HPC Data Center",
   "operator": "Cipher Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Cotulla",
   "county": "La Salle",
   "state": "TX",
   "latitude": 28.4359,
   "longitude": -99.2351,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 70,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-17",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cipher-reveille-cotulla-la-salle-tx"
  },
  {
   "id": "cipher-stingray-andrews-county-tx",
   "name": "Cipher Stingray HPC Data Center",
   "operator": "Cipher Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Andrews",
   "county": "Andrews",
   "state": "TX",
   "latitude": 32.3187,
   "longitude": -102.5457,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 100,
   "capacity_mw_operational": null,
   "land_acres": 250,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-11",
   "record_updated": "2026-07-25",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cipher-stingray-andrews-county-tx"
  },
  {
   "id": "cirrus-data-services-midvale-ut",
   "name": "CirrusDS View 78 Data Center",
   "operator": "Cirrus Data Services",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Midvale",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.6111,
   "longitude": -111.8994,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 112,
   "capacity_mw_operational": 32,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-25",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cirrus-data-services-midvale-ut"
  },
  {
   "id": "cleanarc-ruther-glen-va",
   "name": "CleanArc VA1",
   "operator": "CleanArc Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Ruther Glen",
   "county": "Caroline",
   "state": "VA",
   "latitude": 37.9374,
   "longitude": -77.4837,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 900,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 3000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-07-08",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanarc-ruther-glen-va"
  },
  {
   "id": "cleanspark-austin-county-tx",
   "name": "CleanSpark Austin County AI Data Center Campus",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": null,
   "county": "Austin",
   "state": "TX",
   "latitude": 29.9508,
   "longitude": -96.2661,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 285,
   "capacity_mw_operational": null,
   "land_acres": 271,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10-29",
   "record_updated": "2026-08-25",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-austin-county-tx"
  },
  {
   "id": "cleanspark-brazoria-county-tx",
   "name": "CleanSpark Brazoria County (Second Texas) Campus",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Brazoria",
   "state": "TX",
   "latitude": 29.1694,
   "longitude": -95.431,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 447,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-01-14",
   "record_updated": "2026-08-02",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-brazoria-county-tx"
  },
  {
   "id": "cleanspark-campbell-junction-tn",
   "name": "CleanSpark Campbell Junction Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Campbell Junction",
   "county": "Cumberland",
   "state": "TN",
   "latitude": 36.0436,
   "longitude": -85.1692,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Tennessee Valley Authority",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-09-11",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-campbell-junction-tn"
  },
  {
   "id": "cleanspark-cheyenne-wy",
   "name": "CleanSpark Cheyenne Bitcoin Mining Campus",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Cheyenne",
   "county": "Laramie",
   "state": "WY",
   "latitude": 41.14,
   "longitude": -104.8202,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 75,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 18750000,
   "jobs_permanent": 13,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2024-08-01",
   "record_updated": "2026-08-19",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-cheyenne-wy"
  },
  {
   "id": "cleanspark-clinton-ms",
   "name": "CleanSpark Clinton Bitcoin Mining Facilities",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Clinton",
   "county": "Hinds",
   "state": "MS",
   "latitude": 32.3560924,
   "longitude": -90.3635037,
   "coordinate_precision": "representative_multi_site",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 16.5,
   "land_acres": null,
   "investment_usd": 5775000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Entergy Mississippi",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-09-17",
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-clinton-ms"
  },
  {
   "id": "cleanspark-college-park-ga",
   "name": "CleanSpark College Park Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "College Park",
   "county": "Fulton",
   "state": "GA",
   "latitude": 33.6407,
   "longitude": -84.4277,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": 9.6,
   "land_acres": 6,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2020-12-10",
   "record_updated": "2026-08-16",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-college-park-ga"
  },
  {
   "id": "cleanspark-dalton-ga",
   "name": "CleanSpark Dalton Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Dalton",
   "county": "Whitfield",
   "state": "GA",
   "latitude": 34.7698,
   "longitude": -84.9702,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-06-21",
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-dalton-ga"
  },
  {
   "id": "cleanspark-decatur-tn",
   "name": "CleanSpark Decatur Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Decatur",
   "county": "Meigs",
   "state": "TN",
   "latitude": 35.5148,
   "longitude": -84.7902,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Tennessee Valley Authority",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-09-11",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-decatur-tn"
  },
  {
   "id": "cleanspark-jellico-tn",
   "name": "CleanSpark Jellico Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Jellico",
   "county": "Campbell",
   "state": "TN",
   "latitude": 36.5825,
   "longitude": -84.1306,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Tennessee Valley Authority",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-09-11",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-jellico-tn"
  },
  {
   "id": "cleanspark-lafayette-ga",
   "name": "CleanSpark LaFayette Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "LaFayette",
   "county": "Walker",
   "state": "GA",
   "latitude": 34.7048,
   "longitude": -85.2819,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-05-13",
   "record_updated": "2026-08-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "cleanspark-lenoir-city-tn",
   "name": "CleanSpark Lenoir City Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Lenoir City",
   "county": "Loudon",
   "state": "TN",
   "latitude": 35.7973,
   "longitude": -84.256,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 40,
   "capacity_mw_operational": 20,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "TVA",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-10-31",
   "record_updated": "2026-09-09",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-lenoir-city-tn"
  },
  {
   "id": "cleanspark-limestone-tn",
   "name": "CleanSpark Limestone Bitcoin Mining Facility (closed 2026)",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Limestone",
   "county": "Washington",
   "state": "TN",
   "latitude": 36.2235,
   "longitude": -82.625,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "BrightRidge (TVA)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2020",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-limestone-tn"
  },
  {
   "id": "cleanspark-maynardville-tn",
   "name": "CleanSpark Maynardville Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Maynardville",
   "county": "Union",
   "state": "TN",
   "latitude": 36.2506,
   "longitude": -83.7974,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "TVA",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-10-31",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-maynardville-tn"
  },
  {
   "id": "cleanspark-meridian-ms",
   "name": "CleanSpark Meridian Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Meridian",
   "county": "Lauderdale",
   "state": "MS",
   "latitude": 32.3643,
   "longitude": -88.7037,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-02-06",
   "record_updated": "2026-09-09",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-meridian-ms"
  },
  {
   "id": "cleanspark-mountain-city-tn",
   "name": "CleanSpark Mountain City Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Mountain City",
   "county": "Johnson",
   "state": "TN",
   "latitude": 36.4745636,
   "longitude": -81.804838,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 30,
   "capacity_mw_operational": null,
   "land_acres": 50,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Mountain Electric Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-mountain-city-tn"
  },
  {
   "id": "cleanspark-new-tazewell-tn",
   "name": "CleanSpark New Tazewell Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "New Tazewell",
   "county": "Claiborne",
   "state": "TN",
   "latitude": 36.4426,
   "longitude": -83.5996,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Tennessee Valley Authority",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-09-11",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-new-tazewell-tn"
  },
  {
   "id": "cleanspark-norcross-ga",
   "name": "CleanSpark Norcross Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Norcross",
   "county": "Gwinnett",
   "state": "GA",
   "latitude": 33.9412,
   "longitude": -84.2135,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 20,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2021-08-06",
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-norcross-ga"
  },
  {
   "id": "cleanspark-oneida-tn",
   "name": "CleanSpark Oneida Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Oneida",
   "county": "Scott",
   "state": "TN",
   "latitude": 36.4981,
   "longitude": -84.5127,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Tennessee Valley Authority",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-09-11",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-oneida-tn"
  },
  {
   "id": "cleanspark-sandersville-ga",
   "name": "CleanSpark Sandersville Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Sandersville",
   "county": "Washington",
   "state": "GA",
   "latitude": 32.9807,
   "longitude": -82.8071,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-10-08",
   "record_updated": "2026-08-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "cleanspark-twin-city-ga",
   "name": "CleanSpark Twin City Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Twin City",
   "county": "Emanuel",
   "state": "GA",
   "latitude": 32.5829,
   "longitude": -82.1551,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-01-21",
   "record_updated": "2026-08-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "cleanspark-vicksburg-ms",
   "name": "CleanSpark Vicksburg Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Vicksburg",
   "county": "Warren",
   "state": "MS",
   "latitude": 32.3526,
   "longitude": -90.8779,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-02-06",
   "record_updated": "2026-09-09",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-vicksburg-ms"
  },
  {
   "id": "cleanspark-washington-ga",
   "name": "CleanSpark Washington Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Washington",
   "county": "Wilkes",
   "state": "GA",
   "latitude": 33.7376,
   "longitude": -82.7379,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 86,
   "capacity_mw_operational": 36,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-08-09",
   "record_updated": "2026-08-16",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-washington-ga"
  },
  {
   "id": "cleanspark-west-crossville-tn",
   "name": "CleanSpark West Crossville Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Crossville",
   "county": "Cumberland",
   "state": "TN",
   "latitude": 35.9487,
   "longitude": -85.0269,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Tennessee Valley Authority",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-09-11",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-west-crossville-tn"
  },
  {
   "id": "cleanspark-wiggins-ms",
   "name": "CleanSpark Wiggins Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Wiggins",
   "county": "Stone",
   "state": "MS",
   "latitude": 30.8508,
   "longitude": -89.1284,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 9,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-02-06",
   "record_updated": "2026-09-09",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-wiggins-ms"
  },
  {
   "id": "cleanspark-winfield-tn",
   "name": "CleanSpark Winfield Bitcoin Mining Facility",
   "operator": "CleanSpark, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Winfield",
   "county": "Scott",
   "state": "TN",
   "latitude": 36.5619,
   "longitude": -84.4506,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Tennessee Valley Authority",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-09-11",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cleanspark-winfield-tn"
  },
  {
   "id": "cloudburst-oklahoma-city-campus-ok",
   "name": "CloudBurst Oklahoma City Campus",
   "operator": "CloudBurst Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Oklahoma City",
   "county": "Oklahoma",
   "state": "OK",
   "latitude": 35.4676,
   "longitude": -97.5164,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cloudburst-oklahoma-city-campus-ok"
  },
  {
   "id": "cloudburst-san-marcos-tx",
   "name": "CloudBurst San Marcos GigaCenter",
   "operator": "CloudBurst Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "San Marcos",
   "county": "Hays",
   "state": "TX",
   "latitude": 29.88,
   "longitude": -97.94,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1200,
   "capacity_mw_operational": null,
   "land_acres": 706,
   "investment_usd": 14500000000,
   "jobs_permanent": 480,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": 0.024,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-08-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cloudburst-san-marcos-tx"
  },
  {
   "id": "cloudhq-lc1-va",
   "name": "CloudHQ LC1",
   "operator": "CloudHQ",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0102471,
   "longitude": -77.4626713,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cloudhq-lc1-va"
  },
  {
   "id": "cloudhq-lc3-va",
   "name": "CloudHQ LC3",
   "operator": "CloudHQ",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0112123,
   "longitude": -77.4604251,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cloudhq-lc3-va"
  },
  {
   "id": "cloudhq-manassas-mcc-va",
   "name": "CloudHQ Manassas MCC Campus",
   "operator": "CloudHQ",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Manassas",
   "county": "Prince William",
   "state": "VA",
   "latitude": 38.7196,
   "longitude": -77.4982,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 382,
   "capacity_mw_operational": null,
   "land_acres": 100,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy (Clover Hill substation)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-08-16",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cloudhq-manassas-mcc-va"
  },
  {
   "id": "cloudhq-mount-prospect-ord-il",
   "name": "CloudHQ Mount Prospect (ORD) Campus",
   "operator": "CloudHQ",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Mount Prospect",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.055,
   "longitude": -87.935,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 49.7,
   "investment_usd": 2500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022",
   "record_updated": "2026-09-10",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cloudhq-mount-prospect-ord-il"
  },
  {
   "id": "cloverleaf-carlton-kewaunee-county-wi",
   "name": "Cloverleaf Carlton Data Center Site (Kewaunee County)",
   "operator": "Cloverleaf Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Carlton",
   "county": "Kewaunee County",
   "state": "WI",
   "latitude": 44.35,
   "longitude": -87.58,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cloverleaf-carlton-kewaunee-county-wi"
  },
  {
   "id": "cloverleaf-project-open-sky-piedmont-ok",
   "name": "Cloverleaf Project Open Sky",
   "operator": "Cloverleaf Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Piedmont",
   "county": "Canadian",
   "state": "OK",
   "latitude": 35.7,
   "longitude": -97.8,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1500,
   "capacity_mw_operational": null,
   "land_acres": 630,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-06",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cloverleaf-project-open-sky-piedmont-ok"
  },
  {
   "id": "cloverleaf-troy-mo",
   "name": "Cloverleaf Troy Campus",
   "operator": "Cloverleaf Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Troy",
   "county": "Lincoln",
   "state": "MO",
   "latitude": 38.9784,
   "longitude": -90.9832,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-07",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cloverleaf-troy-mo"
  },
  {
   "id": "cloverleaf-troy-il",
   "name": "Cloverleaf Troy Data Center Campus",
   "operator": "Cloverleaf Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Troy",
   "county": "Madison",
   "state": "IL",
   "latitude": 38.719,
   "longitude": -89.913,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": 1000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": 0.032,
   "energy_source": "grid",
   "utility": "Ameren Illinois",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cloverleaf-troy-il"
  },
  {
   "id": "cloverleaf-wrightstown-village-wi",
   "name": "Cloverleaf Wrightstown Data Center Inquiry (Village of Wrightstown)",
   "operator": "Cloverleaf Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Wrightstown",
   "county": "Brown County",
   "state": "WI",
   "latitude": 44.3269,
   "longitude": -88.1631,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-01",
   "record_updated": "2026-09-01",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cloverleaf-wrightstown-village-wi"
  },
  {
   "id": "coachella-valley-technology-campus-ca",
   "name": "Coachella Valley Technology Campus",
   "operator": "Stronghold Power Systems",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Coachella",
   "county": "Riverside",
   "state": "CA",
   "latitude": 33.671181,
   "longitude": -116.169492,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 450,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-02-11",
   "record_updated": "2026-08-02",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coachella-valley-technology-campus-ca"
  },
  {
   "id": "cobalt-cheyenne-las-vegas-nv",
   "name": "Cobalt Cheyenne Data Center",
   "operator": "Cobalt Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.2183822,
   "longitude": -115.26296,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 5.5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2013-02-07",
   "record_updated": "2026-09-11",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cobalt-cheyenne-las-vegas-nv"
  },
  {
   "id": "cogent-cheyenne-114-w-10th-wy",
   "name": "Cogent Cheyenne Data Center",
   "operator": "Cogent Communications",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Cheyenne",
   "county": "Laramie",
   "state": "WY",
   "latitude": 41.1278101,
   "longitude": -104.8110116,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2.5,
   "land_acres": 1.6,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Black Hills Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "cogent-650-poydras-new-orleans-la",
   "name": "Cogent Communications New Orleans (650 Poydras)",
   "operator": "Cogent Communications",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "New Orleans",
   "county": "Orleans",
   "state": "LA",
   "latitude": 29.9496125,
   "longitude": -90.0699355,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 0.75,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cogent-650-poydras-new-orleans-la"
  },
  {
   "id": "cogent-akron-summit-county-oh",
   "name": "Cogent Data Center Akron",
   "operator": "Cogent Communications",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Akron",
   "county": "Summit",
   "state": "OH",
   "latitude": 41.0876,
   "longitude": -81.5183,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 5,
   "land_acres": 2.6,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cogent-akron-summit-county-oh"
  },
  {
   "id": "cogent-elkridge-howard-md",
   "name": "Cogent Data Center, Elkridge",
   "operator": "Cogent Communications",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Elkridge",
   "county": "Howard",
   "state": "MD",
   "latitude": 39.204016181007,
   "longitude": -76.711386050454,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "cogent-oklahoma-city-ok",
   "name": "Cogent Oklahoma City Data Center",
   "operator": "Cogent Communications",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Oklahoma City",
   "county": "Oklahoma County",
   "state": "OK",
   "latitude": 35.4676,
   "longitude": -97.5164,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cogent-oklahoma-city-ok"
  },
  {
   "id": "cognovum-trumbull-ct",
   "name": "CogNovum Data Center (80 Merritt Boulevard)",
   "operator": "CogNovum",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Trumbull",
   "county": null,
   "state": "CT",
   "latitude": 41.2407281,
   "longitude": -73.1474121,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cognovum-trumbull-ct"
  },
  {
   "id": "coinmint-massena-ny",
   "name": "Coinmint (Massena East / former Alcoa Smelter)",
   "operator": "Coinmint",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Massena",
   "county": "St. Lawrence",
   "state": "NY",
   "latitude": 44.977701,
   "longitude": -74.732659,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 435,
   "capacity_mw_operational": 166,
   "land_acres": 1300,
   "investment_usd": 165000000,
   "jobs_permanent": 150,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "New York Power Authority (NYPA)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coinmint-massena-ny"
  },
  {
   "id": "coinmint-plattsburgh-ny",
   "name": "Coinmint Plattsburgh (Skyway Plaza)",
   "operator": "Coinmint",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Plattsburgh",
   "county": "Clinton",
   "state": "NY",
   "latitude": 44.680538,
   "longitude": -73.451475,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 10,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "aphorio-carter-collierville-tn",
   "name": "Collierville Enterprise Data Center (FedEx World Technology Center Campus)",
   "operator": "Aphorio Carter",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Collierville",
   "county": "Shelby",
   "state": "TN",
   "latitude": 35.04204,
   "longitude": -89.66453,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 4.62,
   "investment_usd": 13000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aphorio-carter-collierville-tn"
  },
  {
   "id": "colocation-america-sfdc1-san-francisco-ca",
   "name": "Colocation America SFDC1 (200 Paul Avenue)",
   "operator": "Colocation America",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "San Francisco",
   "county": "San Francisco",
   "state": "CA",
   "latitude": 37.7234595,
   "longitude": -122.3979578,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "colocsx-jacksonville-fl",
   "name": "ColoCSX (CSX Data Center)",
   "operator": "ColoCSX (CSX Transportation)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Jacksonville",
   "county": "Duval",
   "state": "FL",
   "latitude": 30.1988,
   "longitude": -81.5812,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/colocsx-jacksonville-fl"
  },
  {
   "id": "cologix-ash1-va",
   "name": "Cologix ASH1",
   "operator": "Cologix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0179257,
   "longitude": -77.4595164,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cologix-ash1-va"
  },
  {
   "id": "cologix-cedar-knolls-campus-nj",
   "name": "Cologix Cedar Knolls Campus",
   "operator": "Cologix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Cedar Knolls",
   "county": "Morris",
   "state": "NJ",
   "latitude": 40.81995,
   "longitude": -74.427986,
   "coordinate_precision": "representative_multi_site",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "cologix-col1-columbus-oh",
   "name": "Cologix COL1 (Columbus)",
   "operator": "Cologix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Columbus",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.1164761,
   "longitude": -83.0021667,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cologix-col1-columbus-oh"
  },
  {
   "id": "cologix-col2-columbus-oh",
   "name": "Cologix COL2 (Columbus)",
   "operator": "Cologix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Columbus",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.1164691,
   "longitude": -83.0020077,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cologix-col2-columbus-oh"
  },
  {
   "id": "cologix-col3-columbus-oh",
   "name": "Cologix COL3 (Columbus)",
   "operator": "Cologix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Columbus",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.1164586,
   "longitude": -83.0017691,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 18,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cologix-col3-columbus-oh"
  },
  {
   "id": "cologix-col4-columbus-oh",
   "name": "Cologix COL4 (Columbus)",
   "operator": "Cologix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Columbus",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.1178254,
   "longitude": -83.0007799,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "cologix-col5-orange-township-delaware-county-oh",
   "name": "Cologix COL5",
   "operator": "Cologix",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Lewis Center",
   "county": "Delaware",
   "state": "OH",
   "latitude": 40.190863,
   "longitude": -83.011113,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 75,
   "capacity_mw_operational": null,
   "land_acres": 25,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "AEP Ohio",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cologix-col5-orange-township-delaware-county-oh"
  },
  {
   "id": "cologix-des-moines-ia",
   "name": "Cologix DSM1 (Financial Center)",
   "operator": "Cologix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Des Moines",
   "county": "Polk",
   "state": "IA",
   "latitude": 41.5868,
   "longitude": -93.625,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 0.6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-06-05",
   "record_updated": "2026-08-08",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "cologix-cedar-falls-ia",
   "name": "Cologix DSM2 (Cedar Falls)",
   "operator": "Cologix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Cedar Falls",
   "county": "Black Hawk",
   "state": "IA",
   "latitude": 42.5347,
   "longitude": -92.4453,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 1,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-06-05",
   "record_updated": "2026-08-08",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "cologix-jax1-fl",
   "name": "Cologix JAX1",
   "operator": "Cologix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Jacksonville",
   "county": "Duval",
   "state": "FL",
   "latitude": 30.3314298,
   "longitude": -81.6624257,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cologix-jax1-fl"
  },
  {
   "id": "cologix-johnstown-oh",
   "name": "Cologix Johnstown AI-Ready Campus",
   "operator": "Cologix",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Johnstown",
   "county": "Licking",
   "state": "OH",
   "latitude": 40.15,
   "longitude": -82.68,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 800,
   "capacity_mw_operational": null,
   "land_acres": 154,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AEP Ohio",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cologix-johnstown-oh"
  },
  {
   "id": "cologix-nnj3-parsippany-nj",
   "name": "Cologix NNJ3",
   "operator": "Cologix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Parsippany",
   "county": "Morris",
   "state": "NJ",
   "latitude": 40.859636,
   "longitude": -74.423348,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "cologix-sv1-ca",
   "name": "Cologix SV1",
   "operator": "Cologix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3654018,
   "longitude": -121.9616726,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 9,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cologix-sv1-ca"
  },
  {
   "id": "colospace-bedford-nh",
   "name": "ColoSpace Bedford Data Center",
   "operator": "ColoSpace, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Bedford",
   "county": "Hillsborough",
   "state": "NH",
   "latitude": 42.9281915,
   "longitude": -71.4638354,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/colospace-bedford-nh"
  },
  {
   "id": "xai-colossus-memphis-tn",
   "name": "Colossus",
   "operator": "xAI",
   "company": "xai",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Memphis",
   "county": "Shelby",
   "state": "TN",
   "latitude": 35.0565,
   "longitude": -90.0148,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1200,
   "capacity_mw_operational": 150,
   "land_acres": null,
   "investment_usd": 12000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": 3,
   "energy_source": "mixed",
   "utility": "Memphis Light Gas & Water (MLGW) / TVA",
   "on_site_generation_mw": 422,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-09-10",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/xai-colossus-memphis-tn"
  },
  {
   "id": "xai-colossus-2-memphis-tn",
   "name": "Colossus 2 (Whitehaven)",
   "operator": "xAI",
   "company": "xai",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Memphis",
   "county": "Shelby",
   "state": "TN",
   "latitude": 34.997983,
   "longitude": -90.0348672,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 100,
   "investment_usd": 80000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/xai-colossus-2-memphis-tn"
  },
  {
   "id": "colovore-reno-1-storey-county-nv",
   "name": "Colovore Reno 1 (RN01)",
   "operator": "Colovore",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "McCarran",
   "county": "Storey",
   "state": "NV",
   "latitude": 39.5341121,
   "longitude": -119.4771513,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": 10,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 4076970,
   "announced_date": "2025-12",
   "record_updated": "2026-09-11",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/colovore-reno-1-storey-county-nv"
  },
  {
   "id": "greenidge-columbus-ms",
   "name": "Columbus Bitcoin Mining Facility (formerly Greenidge Columbus)",
   "operator": "LM Funding America, Inc. (Power & Compute)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Columbus",
   "county": "Lowndes",
   "state": "MS",
   "latitude": 33.4957,
   "longitude": -88.4273,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 8.5,
   "land_acres": null,
   "investment_usd": 1450000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-03-11",
   "record_updated": "2026-09-14",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/greenidge-columbus-ms"
  },
  {
   "id": "comanche-circle-sailfish-hood-county-tx",
   "name": "Comanche Circle",
   "operator": "Sailfish Digital Ventures (SDV)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Tolar",
   "county": "Hood",
   "state": "TX",
   "latitude": 32.35,
   "longitude": -97.83,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 2000,
   "capacity_mw_operational": null,
   "land_acres": 2600,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/comanche-circle-sailfish-hood-county-tx"
  },
  {
   "id": "compass-goodyear-campus-az",
   "name": "Compass Datacenters Goodyear Campus",
   "operator": "Compass Datacenters",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Goodyear",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.4354446,
   "longitude": -112.3756856,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 350,
   "capacity_mw_operational": 72,
   "land_acres": 225,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/compass-goodyear-campus-az"
  },
  {
   "id": "compass-hoffman-estates-il",
   "name": "Compass Datacenters Hoffman Estates Campus",
   "operator": "Compass Datacenters",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Hoffman Estates",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.0770709,
   "longitude": -88.2175155,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 200,
   "investment_usd": 10000000000,
   "jobs_permanent": null,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-06-13",
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/compass-hoffman-estates-il"
  },
  {
   "id": "compass-lauderdale-meridian-ms",
   "name": "Compass Datacenters Lauderdale County Hyperscale Campus",
   "operator": "Compass Datacenters",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Meridian",
   "county": "Lauderdale",
   "state": "MS",
   "latitude": 32.3644,
   "longitude": -88.7037,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 10000000000,
   "jobs_permanent": null,
   "jobs_construction": 1000,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Mississippi Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 6,
   "subsidy_usd_known": null,
   "announced_date": "2025-01-09",
   "record_updated": "2026-09-09",
   "source_count": 11,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/compass-lauderdale-meridian-ms"
  },
  {
   "id": "compass-datacenters-loudoun-county-i-true-north-va",
   "name": "Compass Datacenters Loudoun County I (\"True North\")",
   "operator": "Compass Datacenters",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Leesburg",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0436134,
   "longitude": -77.5372623,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 100,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/compass-datacenters-loudoun-county-i-true-north-va"
  },
  {
   "id": "compass-statesville-nc",
   "name": "Compass Statesville Campus",
   "operator": "Compass Datacenters",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Statesville",
   "county": "Iredell",
   "state": "NC",
   "latitude": 35.7826,
   "longitude": -80.8873,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": 333,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Duke Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09",
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/compass-statesville-nc"
  },
  {
   "id": "connect-data-centers-albuquerque-nm",
   "name": "Connect Albuquerque (Westpointe 40)",
   "operator": "Connect Data Centers (Oppidan Investment Company)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Albuquerque",
   "county": "Bernalillo",
   "state": "NM",
   "latitude": 35.0881581,
   "longitude": -106.7353893,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 10,
   "land_acres": 10,
   "investment_usd": 80000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-04",
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/connect-data-centers-albuquerque-nm"
  },
  {
   "id": "connect-data-centers-eagan-mn",
   "name": "Connect Data Centers, Eagan (powered by Oppidan)",
   "operator": "Oppidan Investment Company",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Eagan",
   "county": "Dakota",
   "state": "MN",
   "latitude": 44.8278868,
   "longitude": -93.1108726,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 22.1,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/connect-data-centers-eagan-mn"
  },
  {
   "id": "consolidated-communications-manchester-nh",
   "name": "Consolidated Communications Manchester Data Center",
   "operator": "Consolidated Communications",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Manchester",
   "county": "Hillsborough",
   "state": "NH",
   "latitude": 42.9890144,
   "longitude": -71.4636547,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/consolidated-communications-manchester-nh"
  },
  {
   "id": "convergent-technology-park-remington-fauquier-va",
   "name": "Convergent Technology Park",
   "operator": "Convergent VA LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Remington",
   "county": "Fauquier",
   "state": "VA",
   "latitude": 38.55073067963831,
   "longitude": -77.8046447409979,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 140,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/convergent-technology-park-remington-fauquier-va"
  },
  {
   "id": "atlas-coosa-project-gracie-floyd-ga",
   "name": "Coosa Data Center (Project Gracie)",
   "operator": "Atlas Development LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Rome",
   "county": "Floyd",
   "state": "GA",
   "latitude": 34.257,
   "longitude": -85.1647,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 200,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-28",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/atlas-coosa-project-gracie-floyd-ga"
  },
  {
   "id": "copt-defense-properties-van-meter-ia",
   "name": "COPT Defense Van Meter Data Center Shell Site",
   "operator": "COPT Defense Properties",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Van Meter",
   "county": "Dallas",
   "state": "IA",
   "latitude": 41.5031,
   "longitude": -93.9469,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 365,
   "investment_usd": 32000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-09",
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/copt-defense-properties-van-meter-ia"
  },
  {
   "id": "core-scientific-auburn-al",
   "name": "Core Scientific Auburn Data Center (AUBix)",
   "operator": "Core Scientific",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Auburn",
   "county": "Lee",
   "state": "AL",
   "latitude": 32.6089,
   "longitude": -85.4879,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 16,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 400000000,
   "jobs_permanent": 20,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/core-scientific-auburn-al"
  },
  {
   "id": "core-scientific-austin-tx",
   "name": "Core Scientific Austin Data Center (Austin 1)",
   "operator": "Core Scientific",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Austin",
   "county": "Travis",
   "state": "TX",
   "latitude": 30.214,
   "longitude": -97.622,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": 16,
   "land_acres": 38,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-03",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/core-scientific-austin-tx"
  },
  {
   "id": "core-scientific-calvert-city-ky",
   "name": "Core Scientific Calvert City Data Center (Calvert 1, 2 & 3)",
   "operator": "Core Scientific",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Calvert City",
   "county": "Marshall",
   "state": "KY",
   "latitude": 37.0328,
   "longitude": -88.3527,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 150,
   "land_acres": 15,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "TVA / Jackson Purchase Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-03",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/core-scientific-calvert-city-ky"
  },
  {
   "id": "core-scientific-denton-tx",
   "name": "Core Scientific Denton Data Center (Denton 1)",
   "operator": "Core Scientific",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Denton",
   "county": "Denton",
   "state": "TX",
   "latitude": 33.1932,
   "longitude": -97.1276,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 260,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 1200000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/core-scientific-denton-tx"
  },
  {
   "id": "core-scientific-grand-forks-nd",
   "name": "Core Scientific Grand Forks Data Center (Grand Forks 1)",
   "operator": "Core Scientific",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Grand Forks",
   "county": "Grand Forks",
   "state": "ND",
   "latitude": 47.8912,
   "longitude": -97.0434,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 100,
   "land_acres": 20,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Nodak Electric Cooperative / Minnkota Power Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-03",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/core-scientific-grand-forks-nd"
  },
  {
   "id": "core-scientific-marble-cherokee-county-nc",
   "name": "Core Scientific Marble Data Center",
   "operator": "Core Scientific",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Marble",
   "county": "Cherokee",
   "state": "NC",
   "latitude": 35.135,
   "longitude": -83.924,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 65,
   "capacity_mw_operational": 104,
   "land_acres": 70,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/core-scientific-marble-cherokee-county-nc"
  },
  {
   "id": "core-scientific-muskogee-ok",
   "name": "Core Scientific Muskogee Campus",
   "operator": "Core Scientific",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Muskogee",
   "county": "Muskogee",
   "state": "OK",
   "latitude": 35.72,
   "longitude": -95.42,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": 70,
   "land_acres": 250,
   "investment_usd": 4000000000,
   "jobs_permanent": 150,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "OG&E (Oklahoma Gas & Electric)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/core-scientific-muskogee-ok"
  },
  {
   "id": "core-scientific-pecos-tx",
   "name": "Core Scientific Pecos AI Campus",
   "operator": "Core Scientific",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Pecos",
   "county": "Reeves",
   "state": "TX",
   "latitude": 31.44,
   "longitude": -103.58,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-08",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/core-scientific-pecos-tx"
  },
  {
   "id": "coresite-at1-atlanta-ga-ga",
   "name": "CoreSite AT1 - Atlanta, GA",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Atlanta",
   "county": "Fulton",
   "state": "GA",
   "latitude": 33.7559857,
   "longitude": -84.3911712,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-at1-atlanta-ga-ga"
  },
  {
   "id": "coresite-at2-marietta-data-center-ga",
   "name": "CoreSite AT2 - Marietta Data Center",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Marietta",
   "county": "Cobb",
   "state": "GA",
   "latitude": 33.9255145,
   "longitude": -84.4816338,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-at2-marietta-data-center-ga"
  },
  {
   "id": "coresite-bo1-boston-ma-ma",
   "name": "CoreSite BO1 - Boston, MA",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Somerville",
   "county": "Middlesex",
   "state": "MA",
   "latitude": 42.3767059,
   "longitude": -71.0797577,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-bo1-boston-ma-ma"
  },
  {
   "id": "coresite-bowers-santa-clara-ca",
   "name": "CoreSite Bowers Data Center",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.389,
   "longitude": -121.974,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 72,
   "capacity_mw_operational": null,
   "land_acres": 5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Silicon Valley Power (SVP)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-08",
   "record_updated": "2026-07-06",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-bowers-santa-clara-ca"
  },
  {
   "id": "coresite-ch1-chicago-il",
   "name": "CoreSite CH1",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Chicago",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.8763329,
   "longitude": -87.6314808,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-ch1-chicago-il"
  },
  {
   "id": "coresite-ch2-chicago-il",
   "name": "CoreSite CH2",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Chicago",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.8628,
   "longitude": -87.6413029,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 18,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "coresite-dc1-washington-d-c-dc",
   "name": "CoreSite DC1 - Washington, D.C.",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Washington",
   "county": "District of Columbia",
   "state": "DC",
   "latitude": 38.9028879,
   "longitude": -77.0291491,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Pepco",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-dc1-washington-d-c-dc"
  },
  {
   "id": "coresite-de3-denver-co",
   "name": "CoreSite DE3",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Denver",
   "county": "Denver",
   "state": "CO",
   "latitude": 39.7392,
   "longitude": -104.9903,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 60,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": 0.115,
   "energy_source": "grid",
   "utility": "Xcel Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-08-26",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-de3-denver-co"
  },
  {
   "id": "coresite-hillsboro-or",
   "name": "CoreSite Hillsboro Data Campus (HI1/HI2)",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5594015,
   "longitude": -122.9522867,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 19.73,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-hillsboro-or"
  },
  {
   "id": "coresite-la1-los-angeles-ca",
   "name": "CoreSite LA1 (One Wilshire)",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Los Angeles",
   "county": "Los Angeles",
   "state": "CA",
   "latitude": 34.0478871,
   "longitude": -118.2555541,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-la1-los-angeles-ca"
  },
  {
   "id": "coresite-la2-los-angeles-ca-ca",
   "name": "CoreSite LA2 - Los Angeles, CA",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Los Angeles",
   "county": "Los Angeles",
   "state": "CA",
   "latitude": 34.0584789,
   "longitude": -118.2359144,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Los Angeles Department of Water & Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-la2-los-angeles-ca-ca"
  },
  {
   "id": "coresite-ny2-secaucus-nj-nj",
   "name": "CoreSite NY2 - Secaucus, NJ",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Secaucus",
   "county": "Hudson",
   "state": "NJ",
   "latitude": 40.7842844,
   "longitude": -74.0652426,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PSE&G",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-ny2-secaucus-nj-nj"
  },
  {
   "id": "coresite-or1-orlando-fl",
   "name": "CoreSite OR1, Orlando",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Orlando",
   "county": "Orange",
   "state": "FL",
   "latitude": 28.429212,
   "longitude": -81.420781,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 16,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-or1-orlando-fl"
  },
  {
   "id": "coresite-sv1-san-jose-ca-ca",
   "name": "CoreSite SV1 - San Jose, CA",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Jose",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3341181,
   "longitude": -121.891646,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Pacific Gas & Electric (PG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-sv1-san-jose-ca-ca"
  },
  {
   "id": "coresite-va1-reston-va-va",
   "name": "CoreSite VA1 - Reston, VA",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Reston",
   "county": "Fairfax",
   "state": "VA",
   "latitude": 38.9506059,
   "longitude": -77.3645496,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-va1-reston-va-va"
  },
  {
   "id": "coresite-va3-reston-va-va",
   "name": "CoreSite VA3 - Reston, VA",
   "operator": "CoreSite",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Reston",
   "county": "Fairfax",
   "state": "VA",
   "latitude": 38.9483343,
   "longitude": -77.3724298,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coresite-va3-reston-va-va"
  },
  {
   "id": "coreweave-dalton-ii-old-tilton-road-whitfield-ga",
   "name": "CoreWeave Dalton II / Core Scientific Old Tilton Road Data Center",
   "operator": "Core Scientific",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Dalton",
   "county": "Whitfield",
   "state": "GA",
   "latitude": 34.69265485,
   "longitude": -84.94183002,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 173.3,
   "investment_usd": 1200000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coreweave-dalton-ii-old-tilton-road-whitfield-ga"
  },
  {
   "id": "coreweave-digital-crossroads-hammond-in",
   "name": "CoreWeave Digital Crossroads",
   "operator": "CoreWeave",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Hammond",
   "county": "Lake",
   "state": "IN",
   "latitude": 41.5836,
   "longitude": -87.5,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 180,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "NIPSCO",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-06",
   "record_updated": "2026-07-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coreweave-digital-crossroads-hammond-in"
  },
  {
   "id": "coreweave-lancaster-pa",
   "name": "CoreWeave Lancaster Data Center",
   "operator": "CoreWeave",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Lancaster",
   "county": "Lancaster",
   "state": "PA",
   "latitude": 40.0379,
   "longitude": -76.3055,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 144,
   "investment_usd": 6000000000,
   "jobs_permanent": 70,
   "jobs_construction": 600,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "PPL Electric",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-09-12",
   "source_count": 10,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coreweave-lancaster-pa"
  },
  {
   "id": "coreweave-kenilworth-nj",
   "name": "CoreWeave NEST Campus",
   "operator": "CoreWeave",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Kenilworth",
   "county": "Union",
   "state": "NJ",
   "latitude": 40.6762,
   "longitude": -74.2913,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 250,
   "capacity_mw_operational": null,
   "land_acres": 27,
   "investment_usd": 1760000000,
   "jobs_permanent": 143,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "PSE&G",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-07-06",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/coreweave-kenilworth-nj"
  },
  {
   "id": "aws-cosner-technology-campus-massaponax-va",
   "name": "Cosner Technology Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Massaponax",
   "county": "Spotsylvania",
   "state": "VA",
   "latitude": 38.204738259414135,
   "longitude": -77.47623258858057,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 329,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Rappahannock Electric Co-op",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-06",
   "record_updated": "2026-08-26",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-cosner-technology-campus-massaponax-va"
  },
  {
   "id": "crane-pdx01-forest-grove-or",
   "name": "Crane PDX01",
   "operator": "Crane Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Forest Grove",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5207,
   "longitude": -123.1087,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 76,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Forest Grove Light & Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-08",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/crane-pdx01-forest-grove-or"
  },
  {
   "id": "crane-pdx02-forest-grove-or",
   "name": "Crane PDX02",
   "operator": "Crane Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Forest Grove",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.51904,
   "longitude": -123.11106,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 48,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/crane-pdx02-forest-grove-or"
  },
  {
   "id": "creekstone-delta-ut",
   "name": "Creekstone Energy Delta Gigasite",
   "operator": "Creekstone Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Delta",
   "county": "Millard",
   "state": "UT",
   "latitude": 39.3527,
   "longitude": -112.5777,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 10000,
   "capacity_mw_operational": null,
   "land_acres": 1143,
   "investment_usd": 17000000000,
   "jobs_permanent": 106,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "PacifiCorp",
   "on_site_generation_mw": 300,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-12",
   "record_updated": "2026-09-01",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/creekstone-delta-ut"
  },
  {
   "id": "jk-land-cross-mill-center-leesburg-va",
   "name": "Cross Mill Center",
   "operator": "JK Land Holdings",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Leesburg",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0781,
   "longitude": -77.5575,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 22,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/jk-land-cross-mill-center-leesburg-va"
  },
  {
   "id": "rck-crossroads-technology-campus-spotsylvania-va",
   "name": "Crossroads Technology Campus",
   "operator": "RCK Digital Crossroads LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": null,
   "county": "Spotsylvania",
   "state": "VA",
   "latitude": 38.2445,
   "longitude": -77.4334,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 633,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/rck-crossroads-technology-campus-spotsylvania-va"
  },
  {
   "id": "crow-holdings-cleanarc-stemmons-dallas-tx",
   "name": "Crow Holdings Stemmons Corridor Data Center Campus",
   "operator": "Crow Holdings (developed and leased by CleanArc Data Centers)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Dallas",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.7762719,
   "longitude": -96.7968559,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 245,
   "capacity_mw_operational": null,
   "land_acres": 40,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-01-20",
   "record_updated": "2026-08-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/crow-holdings-cleanarc-stemmons-dallas-tx"
  },
  {
   "id": "crusoe-walden-co",
   "name": "Crusoe Energy Digital Flare Mitigation, Oxbow Well Pad",
   "operator": "NYDIG DFM",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Walden",
   "county": "Jackson",
   "state": "CO",
   "latitude": 40.7331,
   "longitude": -106.2848,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022",
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/crusoe-walden-co"
  },
  {
   "id": "crusoe-nolan-county-tx",
   "name": "Crusoe Nolan County Data Center",
   "operator": "Crusoe Energy Systems",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sweetwater",
   "county": "Nolan",
   "state": "TX",
   "latitude": 32.4709519,
   "longitude": -100.405938,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": 2000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-04-13",
   "record_updated": "2026-08-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/crusoe-nolan-county-tx"
  },
  {
   "id": "crusoe-blue-energy-victoria-tx",
   "name": "Crusoe Victoria AI Factory",
   "operator": "Crusoe",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Victoria",
   "county": "Victoria",
   "state": "TX",
   "latitude": 28.8053,
   "longitude": -97.0036,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/crusoe-blue-energy-victoria-tx"
  },
  {
   "id": "crusoe-warrenton-mo",
   "name": "Crusoe Warrenton Campus",
   "operator": "Crusoe",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Warrenton",
   "county": "Warren",
   "state": "MO",
   "latitude": 38.8125,
   "longitude": -91.1432,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 337,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Ameren Missouri",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-07-07",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/crusoe-warrenton-mo"
  },
  {
   "id": "crypto-colo-center-mclouth-ks",
   "name": "Crypto Colo Center McLouth Data Center (proposed), cancelled",
   "operator": "Crypto Colo Center Corp",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "McLouth",
   "county": "Jefferson",
   "state": "KS",
   "latitude": 39.19611,
   "longitude": -95.20833,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023",
   "record_updated": "2026-08-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/crypto-colo-center-mclouth-ks"
  },
  {
   "id": "crypto-knight-hosting-cheyenne-wy",
   "name": "Crypto Knight Hosting Cheyenne Bitcoin Mining Facility",
   "operator": "Crypto Knight Hosting",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Cheyenne",
   "county": "Laramie",
   "state": "WY",
   "latitude": 41.14,
   "longitude": -104.82,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Black Hills Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022",
   "record_updated": "2026-09-02",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/crypto-knight-hosting-cheyenne-wy"
  },
  {
   "id": "csquare-sfo1-ca",
   "name": "Csquare SFO1",
   "operator": "Csquare",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3714713,
   "longitude": -121.9696826,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 34.5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/csquare-sfo1-ca"
  },
  {
   "id": "csquare-sfo2-ca",
   "name": "Csquare SFO2",
   "operator": "Csquare",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.397572,
   "longitude": -121.980963,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 43.2,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/csquare-sfo2-ca"
  },
  {
   "id": "csquare-sfo3-ca",
   "name": "Csquare SFO3",
   "operator": "Csquare",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sunnyvale",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3720542,
   "longitude": -121.9860407,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 8.6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Pacific Gas & Electric (PG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/csquare-sfo3-ca"
  },
  {
   "id": "csquare-sfo4-ca",
   "name": "Csquare SFO4",
   "operator": "Csquare",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3757986,
   "longitude": -121.9551844,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 43.1,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/csquare-sfo4-ca"
  },
  {
   "id": "culpeper-brandy-station-va",
   "name": "Culpeper Acquisitions Brandy Station Campus (denied)",
   "operator": "Culpeper Acquisitions LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Brandy Station",
   "county": "Culpeper",
   "state": "VA",
   "latitude": 38.5095,
   "longitude": -77.8863,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/culpeper-brandy-station-va"
  },
  {
   "id": "cyrusone-nas-lemoore-ca",
   "name": "CyrusOne AI Data Center at NAS Lemoore",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": null,
   "county": "Kings",
   "state": "CA",
   "latitude": 36.303,
   "longitude": -119.953,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 100,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "Pacific Gas & Electric (PG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09",
   "record_updated": "2026-07-23",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-nas-lemoore-ca"
  },
  {
   "id": "cyrusone-bosque-county-thad-hill-tx",
   "name": "CyrusOne Bosque County Campus (Thad Hill Energy Center)",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Bosque",
   "state": "TX",
   "latitude": 31.9243,
   "longitude": -97.6564,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 400,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "Calpine",
   "on_site_generation_mw": 400,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-bosque-county-thad-hill-tx"
  },
  {
   "id": "cyrusone-chi1-chi3-aurora-il",
   "name": "CyrusOne CHI1-CHI3 (Aurora)",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Aurora",
   "county": "Kane",
   "state": "IL",
   "latitude": 41.7966077,
   "longitude": -88.2438232,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 109,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-chi1-chi3-aurora-il"
  },
  {
   "id": "cyrusone-cin2-cincinnati-oh",
   "name": "CyrusOne CIN2 (Cincinnati)",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Cincinnati",
   "county": "Hamilton",
   "state": "OH",
   "latitude": 39.1027886,
   "longitude": -84.5179229,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 14,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-cin2-cincinnati-oh"
  },
  {
   "id": "cyrusone-cin3-cincinnati-mason-oh",
   "name": "CyrusOne CIN3 (Cincinnati-Mason)",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Mason",
   "county": "Warren",
   "state": "OH",
   "latitude": 39.3038941,
   "longitude": -84.3116127,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Duke Energy Ohio",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-cin3-cincinnati-mason-oh"
  },
  {
   "id": "cyrusone-dfw3-dfw5-allen-tx",
   "name": "CyrusOne DFW3-DFW5 (Allen)",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Allen",
   "county": "Collin",
   "state": "TX",
   "latitude": 33.1385206,
   "longitude": -96.6599516,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": 90,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Oncor",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-dfw3-dfw5-allen-tx"
  },
  {
   "id": "cyrusone-dugway-proving-ground-tooele-county-ut",
   "name": "CyrusOne Dugway Proving Ground Data Center",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Tooele",
   "state": "UT",
   "latitude": 40.2,
   "longitude": -112.93,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1201,
   "investment_usd": 2000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "PacifiCorp",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-dugway-proving-ground-tooele-county-ut"
  },
  {
   "id": "cyrusone-freestone-energy-center-fairfield-tx",
   "name": "CyrusOne Freestone Energy Center Campus",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Fairfield",
   "county": "Freestone",
   "state": "TX",
   "latitude": 31.7285,
   "longitude": -96.1611,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 760,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-02-09",
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-freestone-energy-center-fairfield-tx"
  },
  {
   "id": "cyrusone-new-albany-col1-licking-county-oh",
   "name": "CyrusOne New Albany COL-1",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Johnstown",
   "county": "Licking",
   "state": "OH",
   "latitude": 40.09294,
   "longitude": -82.718059,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 93.8,
   "investment_usd": 150000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-18",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-new-albany-col1-licking-county-oh"
  },
  {
   "id": "cyrusone-nva1-nva2-nva3-sterling-va",
   "name": "CyrusOne NVA1, NVA2 & NVA3 (Sterling)",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sterling",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0259023,
   "longitude": -77.4144697,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 48,
   "land_acres": 14,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-nva1-nva2-nva3-sterling-va"
  },
  {
   "id": "cyrusone-nva5-sterling-va",
   "name": "CyrusOne NVA5 (Sterling)",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sterling",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.024356,
   "longitude": -77.4341,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 81,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-nva5-sterling-va"
  },
  {
   "id": "cyrusone-nva7-sterling-va",
   "name": "CyrusOne NVA7 (Sterling)",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sterling",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0263152,
   "longitude": -77.4340194,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-nva7-sterling-va"
  },
  {
   "id": "cyrusone-nva8-sterling-va",
   "name": "CyrusOne NVA8 (Sterling)",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sterling",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0211789,
   "longitude": -77.4132443,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 24,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-nva8-sterling-va"
  },
  {
   "id": "cyrusone-nym1-somerset-nj",
   "name": "CyrusOne NYM1 (Somerset)",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Somerset",
   "county": "Somerset",
   "state": "NJ",
   "latitude": 40.5379623,
   "longitude": -74.5457225,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 30,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "PSE&G",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-nym1-somerset-nj"
  },
  {
   "id": "cyrusone-nym5-norwalk-ct",
   "name": "CyrusOne NYM5 (Norwalk)",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Norwalk",
   "county": "Fairfield",
   "state": "CT",
   "latitude": 41.1130924,
   "longitude": -73.3886495,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-nym5-norwalk-ct"
  },
  {
   "id": "cyrusone-ocb1-council-bluffs-ia",
   "name": "CyrusOne OCB1 Council Bluffs Data Center",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Council Bluffs",
   "county": "Pottawattamie",
   "state": "IA",
   "latitude": 41.2121526,
   "longitude": -95.8779924,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-04",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-ocb1-council-bluffs-ia"
  },
  {
   "id": "cyrusone-pnw1-quincy-wa",
   "name": "CyrusOne PNW1",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Quincy",
   "county": "Grant",
   "state": "WA",
   "latitude": 47.2334,
   "longitude": -119.8528,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 90,
   "land_acres": 45,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-22",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "cyrusone-sangamon-talkington-township-il",
   "name": "CyrusOne Sangamon County Data Center Campus",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": null,
   "county": "Sangamon",
   "state": "IL",
   "latitude": 39.64,
   "longitude": -89.84,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 630,
   "capacity_mw_operational": null,
   "land_acres": 280,
   "investment_usd": 500000000,
   "jobs_permanent": 100,
   "jobs_construction": 500,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 31250000,
   "announced_date": "2025-11",
   "record_updated": "2026-08-17",
   "source_count": 10,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/sangamon-county-cyrusone-conditional-use-approval",
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-sangamon-talkington-township-il"
  },
  {
   "id": "cyrusone-sat1-san-antonio-tx",
   "name": "CyrusOne SAT1 (San Antonio)",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Antonio",
   "county": "Bexar",
   "state": "TX",
   "latitude": 29.4666098,
   "longitude": -98.6880869,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-sat1-san-antonio-tx"
  },
  {
   "id": "cyrusone-sat2-sat4-san-antonio-tx",
   "name": "CyrusOne SAT2-SAT4 (San Antonio)",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Antonio",
   "county": "Bexar",
   "state": "TX",
   "latitude": 29.4708878,
   "longitude": -98.6730474,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "CPS Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-sat2-sat4-san-antonio-tx"
  },
  {
   "id": "cyrusone-vint-hill-fauquier-va",
   "name": "CyrusOne Vint Hill Campus",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Vint Hill",
   "county": "Fauquier",
   "state": "VA",
   "latitude": 38.752287510948115,
   "longitude": -77.67347422456572,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 47,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-vint-hill-fauquier-va"
  },
  {
   "id": "cyrusone-chi6-wood-dale-il",
   "name": "CyrusOne Wood Dale Campus",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Wood Dale",
   "county": "DuPage",
   "state": "IL",
   "latitude": 41.9790594,
   "longitude": -87.964189,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 18,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 15625000,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-chi6-wood-dale-il"
  },
  {
   "id": "cyrusone-yorkville-chi11-il",
   "name": "CyrusOne Yorkville Technology Campus (CHI-11)",
   "operator": "CyrusOne",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Yorkville",
   "county": "Kendall",
   "state": "IL",
   "latitude": 41.679,
   "longitude": -88.48,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 228,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-yorkville-chi11-il"
  },
  {
   "id": "odessa-partners-dafter-township-mi",
   "name": "Dafter Township Bitcoin Mine",
   "operator": "Odessa Partners",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Dafter",
   "county": "Chippewa",
   "state": "MI",
   "latitude": 46.3600203,
   "longitude": -84.4272645,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 10,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Cloverland Electric Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/odessa-partners-dafter-township-mi"
  },
  {
   "id": "damac-logistics-park-edgerton-ks",
   "name": "DAMAC Digital Logistics Park Data Center",
   "operator": "DAMAC Digital Solutions Kansas, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Edgerton",
   "county": "Johnson",
   "state": "KS",
   "latitude": 38.7642,
   "longitude": -95.0083,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 4,
   "record_origin": "suedatacenters",
   "case_files": "https://suedatacenters.org/lawsuits/edgerton-kansas-data-center-petition-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/damac-logistics-park-edgerton-ks"
  },
  {
   "id": "dartpoints-greenville-sc",
   "name": "DartPoints Greenville Data Center",
   "operator": "DartPoints",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Greenville",
   "county": "Greenville",
   "state": "SC",
   "latitude": 34.8075277,
   "longitude": -82.3434922,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 12.5,
   "capacity_mw_operational": 2.5,
   "land_acres": null,
   "investment_usd": 125000000,
   "jobs_permanent": 10,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11-12",
   "record_updated": "2026-09-10",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dartpoints-greenville-sc"
  },
  {
   "id": "dartpoints-shv01-shreveport-la",
   "name": "DartPoints SHV01 Shreveport",
   "operator": "DartPoints",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Shreveport",
   "county": "Caddo",
   "state": "LA",
   "latitude": 32.5135356,
   "longitude": -93.7477839,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dartpoints-shv01-shreveport-la"
  },
  {
   "id": "data-city-energy-abundance-laredo-tx",
   "name": "Data City, Texas",
   "operator": "Energy Abundance Development Corporation",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "rumored",
   "city": "Laredo",
   "county": "Webb",
   "state": "TX",
   "latitude": 27.5306,
   "longitude": -99.4803,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 5000,
   "capacity_mw_operational": null,
   "land_acres": 50000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/data-city-energy-abundance-laredo-tx"
  },
  {
   "id": "data-holdings-milwaukee-wi",
   "name": "Data Holdings Milwaukee Data Center",
   "operator": "Data Holdings LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Milwaukee",
   "county": "Milwaukee",
   "state": "WI",
   "latitude": 43.0437366,
   "longitude": -87.9540068,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 10,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-18",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/data-holdings-milwaukee-wi"
  },
  {
   "id": "data-suites-murfreesboro-tn",
   "name": "Data Suites Murfreesboro",
   "operator": "Data Suites",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Murfreesboro",
   "county": "Rutherford",
   "state": "TN",
   "latitude": 35.85555,
   "longitude": -86.4048269,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/data-suites-murfreesboro-tn"
  },
  {
   "id": "databank-brooklyn-park-mn",
   "name": "DataBank Brooklyn Park Campus",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Brooklyn Park",
   "county": "Hennepin",
   "state": "MN",
   "latitude": 45.116,
   "longitude": -93.386,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 9,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Xcel Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/databank-brooklyn-park-mn"
  },
  {
   "id": "databank-bwi1-baltimore-md",
   "name": "DataBank BWI1 (Downtown Baltimore Data Center)",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Baltimore",
   "county": null,
   "state": "MD",
   "latitude": 39.291652966378,
   "longitude": -76.619738877727,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 1.5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "databank-cleveland-cle1-oh",
   "name": "DataBank Cleveland (CLE1)",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Cleveland",
   "county": "Cuyahoga",
   "state": "OH",
   "latitude": 41.4998,
   "longitude": -81.6829,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 0.4,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/databank-cleveland-cle1-oh"
  },
  {
   "id": "databank-den2-centennial-co",
   "name": "DataBank DEN2, Centennial",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Centennial",
   "county": "Arapahoe",
   "state": "CO",
   "latitude": 39.5917924,
   "longitude": -104.8479857,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 4,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Xcel Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "databank-den5-centennial-co",
   "name": "DataBank DEN5, Centennial II",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Centennial",
   "county": "Arapahoe",
   "state": "CO",
   "latitude": 39.5900652,
   "longitude": -104.8469635,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 16,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Xcel Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/databank-den5-centennial-co"
  },
  {
   "id": "databank-east-twin-cities-eagan-mn",
   "name": "DataBank East Twin Cities Data Center (MSP2)",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Eagan",
   "county": "Dakota",
   "state": "MN",
   "latitude": 44.8375194,
   "longitude": -93.1454144,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/databank-east-twin-cities-eagan-mn"
  },
  {
   "id": "databank-granite-point-bluffdale-ut",
   "name": "DataBank Granite Point Campus (SLC2-SLC6)",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Bluffdale",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.48568,
   "longitude": -111.90016,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/databank-granite-point-bluffdale-ut"
  },
  {
   "id": "databank-las1-las-vegas-nv",
   "name": "DataBank LAS1",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.0597501,
   "longitude": -115.1470938,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 3.35,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-29",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "databank-lga3-orangeburg-ny",
   "name": "DataBank LGA3 (Orangeburg Data Center Campus)",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Orangeburg",
   "county": "Rockland",
   "state": "NY",
   "latitude": 41.037331,
   "longitude": -73.987853,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 40,
   "capacity_mw_operational": 20,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/databank-lga3-orangeburg-ny"
  },
  {
   "id": "databank-overland-park-ks",
   "name": "DataBank MCI2 Pine Ridge Data Center",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Overland Park",
   "county": "Johnson",
   "state": "KS",
   "latitude": 38.975738717441,
   "longitude": -94.708635080112,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "databank-lenexa-ks",
   "name": "DataBank MCI3 South Lake Campus Data Center",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Lenexa",
   "county": "Johnson",
   "state": "KS",
   "latitude": 38.925685125075,
   "longitude": -94.769520334995,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 12.75,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "databank-mem1-memphis-tn",
   "name": "DataBank MEM1 (Memphis)",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Memphis",
   "county": "Shelby",
   "state": "TN",
   "latitude": 35.20249,
   "longitude": -89.8097,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 0.45,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/databank-mem1-memphis-tn"
  },
  {
   "id": "databank-ord3-mount-prospect-il",
   "name": "DataBank ORD3 (Mount Prospect)",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Mount Prospect",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.0771274,
   "longitude": -87.9238121,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2.7,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "databank-ord4-oak-brook-il",
   "name": "DataBank ORD4 (Chicago Tri-State)",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Oak Brook",
   "county": "DuPage",
   "state": "IL",
   "latitude": 41.85392,
   "longitude": -87.9221234,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 8.75,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "databank-pit1-pittsburgh-pa",
   "name": "DataBank PIT1 (Downtown Pittsburgh)",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Pittsburgh",
   "county": "Allegheny",
   "state": "PA",
   "latitude": 40.4479,
   "longitude": -80.0086,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 1.9,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-17",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "databank-pit2-summit-park-pittsburgh-pa",
   "name": "DataBank PIT2 (Summit Park)",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Pittsburgh",
   "county": "Allegheny",
   "state": "PA",
   "latitude": 40.4433,
   "longitude": -80.1697,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 5,
   "land_acres": 17,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-17",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "databank-indo-cartersville-ga",
   "name": "DataBank Project Indo",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Cartersville",
   "county": "Bartow",
   "state": "GA",
   "latitude": 34.1651,
   "longitude": -84.7996,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": null,
   "land_acres": 69,
   "investment_usd": 2400000000,
   "jobs_permanent": 60,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/databank-indo-cartersville-ga"
  },
  {
   "id": "databank-san1-san-diego-ca",
   "name": "DataBank San Diego SAN1",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Diego",
   "county": "San Diego",
   "state": "CA",
   "latitude": 32.9886013,
   "longitude": -117.073246,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 3.2,
   "capacity_mw_operational": 7.2,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/databank-san1-san-diego-ca"
  },
  {
   "id": "databank-slc1-salt-lake-city-ut",
   "name": "DataBank SLC1 (Salt Lake City Carrier Hotel)",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Salt Lake City",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.76852,
   "longitude": -111.88585,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 1,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/databank-slc1-salt-lake-city-ut"
  },
  {
   "id": "databank-sna1-irvine-ca",
   "name": "DataBank SNA1",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Irvine",
   "county": "Orange",
   "state": "CA",
   "latitude": 33.69137,
   "longitude": -117.84036,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2.64,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "databank-sna2-irvine-ca",
   "name": "DataBank SNA2",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Irvine",
   "county": "Orange",
   "state": "CA",
   "latitude": 33.68882,
   "longitude": -117.84289,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 8,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "datayard-dayton-oh",
   "name": "DataYard Dayton Data Center",
   "operator": "DataYard",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Dayton",
   "county": "Montgomery",
   "state": "OH",
   "latitude": 39.7602255,
   "longitude": -84.1953733,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/datayard-dayton-oh"
  },
  {
   "id": "dcblox-atlanta-east-conyers-ga",
   "name": "DC BLOX Atlanta East Hyperscale Data Center Campus",
   "operator": "DC BLOX",
   "company": "alliance-cloud-services",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Conyers",
   "county": "Rockdale",
   "state": "GA",
   "latitude": 33.66,
   "longitude": -84.02,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 216,
   "capacity_mw_operational": null,
   "land_acres": 72,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2023",
   "record_updated": "2026-07-07",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dcblox-atlanta-east-conyers-ga"
  },
  {
   "id": "dc-blox-atlanta-west-ga",
   "name": "DC BLOX Atlanta West (ATL1)",
   "operator": "DC BLOX",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Lithia Springs",
   "county": "Douglas",
   "state": "GA",
   "latitude": 33.7882,
   "longitude": -84.6608,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 120,
   "capacity_mw_operational": null,
   "land_acres": 100,
   "investment_usd": 1150000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Greystone Power Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-08",
   "record_updated": "2026-07-06",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dc-blox-atlanta-west-ga"
  },
  {
   "id": "dc-blox-birmingham-al",
   "name": "DC BLOX Birmingham Data Center Campus",
   "operator": "DC BLOX",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Birmingham",
   "county": "Jefferson",
   "state": "AL",
   "latitude": 33.5006652,
   "longitude": -86.8208315,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 60,
   "capacity_mw_operational": 5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dc-blox-birmingham-al"
  },
  {
   "id": "dc-blox-camp-hall-berkeley-county-sc",
   "name": "DC BLOX Camp Hall Data Center Campus",
   "operator": "DC BLOX",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": null,
   "county": "Berkeley",
   "state": "SC",
   "latitude": 33.1595951,
   "longitude": -79.9070461,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 45,
   "capacity_mw_operational": null,
   "land_acres": 27.5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dc-blox-camp-hall-berkeley-county-sc"
  },
  {
   "id": "dcblox-chattanooga-e16th-tn",
   "name": "DC BLOX Chattanooga (807 E 16th Street)",
   "operator": "DC BLOX",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Chattanooga",
   "county": "Hamilton",
   "state": "TN",
   "latitude": 35.0314592,
   "longitude": -85.2975821,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "dc-blox-greenville-sc",
   "name": "DC BLOX Greenville Data Center",
   "operator": "DC BLOX",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Greenville",
   "county": "Greenville",
   "state": "SC",
   "latitude": 34.80455191966,
   "longitude": -82.342676840132,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "dc-blox-henrico-county-va",
   "name": "DC Blox Henrico County Campus (withdrawn)",
   "operator": "DC BLOX",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": null,
   "county": "Henrico",
   "state": "VA",
   "latitude": 37.5532,
   "longitude": -77.4543,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-07-24",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dc-blox-henrico-county-va"
  },
  {
   "id": "dc-blox-huntsville-al",
   "name": "DC BLOX Huntsville Data Center",
   "operator": "DC BLOX",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Huntsville",
   "county": "Madison",
   "state": "AL",
   "latitude": 34.7104202,
   "longitude": -86.6921561,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 13.5,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dc-blox-huntsville-al"
  },
  {
   "id": "dc-blox-montgomery-al",
   "name": "DC BLOX Montgomery Data Center",
   "operator": "DC BLOX",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Montgomery",
   "county": "Montgomery",
   "state": "AL",
   "latitude": 32.3777111,
   "longitude": -86.3090775,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 40,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 30000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-11",
   "record_updated": "2026-09-09",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dc-blox-montgomery-al"
  },
  {
   "id": "dc-blox-myrtle-beach-cls-sc",
   "name": "DC BLOX Myrtle Beach Cable Landing Station",
   "operator": "DC BLOX",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Myrtle Beach",
   "county": "Horry",
   "state": "SC",
   "latitude": 33.6746096,
   "longitude": -78.9440697,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 19,
   "capacity_mw_operational": null,
   "land_acres": 20,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dc-blox-myrtle-beach-cls-sc"
  },
  {
   "id": "dcblox-nashville-grassmere-tn",
   "name": "DC BLOX Nashville (Grassmere Park)",
   "operator": "DC BLOX",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Nashville",
   "county": "Davidson",
   "state": "TN",
   "latitude": 36.0865,
   "longitude": -86.74893,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dcblox-nashville-grassmere-tn"
  },
  {
   "id": "dc-blox-warren-township-marion-county-in",
   "name": "DC BLOX Warren Township Data Center",
   "operator": "DC BLOX",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Warren Township",
   "county": "Marion",
   "state": "IN",
   "latitude": 39.78,
   "longitude": -86.05,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 78,
   "capacity_mw_operational": null,
   "land_acres": 150,
   "investment_usd": 2000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AES Indiana",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dc-blox-warren-township-marion-county-in"
  },
  {
   "id": "deep-green-lansing-mi",
   "name": "Deep Green Lansing Data Center",
   "operator": "Deep Green",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Lansing",
   "county": "Ingham",
   "state": "MI",
   "latitude": 42.747831829239,
   "longitude": -84.544559589342,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 24,
   "capacity_mw_operational": null,
   "land_acres": 2.5,
   "investment_usd": 120000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "other",
   "utility": null,
   "on_site_generation_mw": 16,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/deep-green-lansing-mi"
  },
  {
   "id": "deep-river-data-cumnock-lee-county-nc",
   "name": "Deep River Data AI Data Center (Cumnock, Lee County)",
   "operator": "Deep River Data",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Cumnock",
   "county": "Lee",
   "state": "NC",
   "latitude": 35.555,
   "longitude": -79.23778,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09",
   "record_updated": "2026-08-29",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/deep-river-data-cumnock-lee-county-nc"
  },
  {
   "id": "diamond-farms-gateway-digital-villa-ridge-mo",
   "name": "Diamond Farms (Gateway Digital Campus)",
   "operator": "Provident Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Villa Ridge",
   "county": "Franklin",
   "state": "MO",
   "latitude": 38.484,
   "longitude": -90.85,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 600,
   "investment_usd": null,
   "jobs_permanent": 250,
   "jobs_construction": 2000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-04-23",
   "record_updated": "2026-08-24",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/diamond-farms-gateway-digital-villa-ridge-mo"
  },
  {
   "id": "atmosphere-dickerson-montgomery-md",
   "name": "Dickerson Data Center",
   "operator": "Atmosphere Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Dickerson",
   "county": "Montgomery",
   "state": "MD",
   "latitude": 39.2117,
   "longitude": -77.4736,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 360,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": 2,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/atmosphere-dickerson-montgomery-md"
  },
  {
   "id": "digi-power-x-columbiana-al",
   "name": "Digi Power X Columbiana AI Data Center",
   "operator": "Digi Power X",
   "company": "digi-power-x",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Columbiana",
   "county": "Shelby",
   "state": "AL",
   "latitude": 33.1810918,
   "longitude": -86.622753,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 40,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 371500000,
   "jobs_permanent": 45,
   "jobs_construction": 2,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Alabama Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-01",
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digi-power-x-columbiana-al"
  },
  {
   "id": "digico-lax1-monterey-park-ca",
   "name": "DigiCo LAX1 (1977 Saturn Street)",
   "operator": "DigiCo Infrastructure REIT",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Monterey Park",
   "county": "Los Angeles",
   "state": "CA",
   "latitude": 34.03951,
   "longitude": -118.115058,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-10",
   "record_updated": "2026-08-02",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digico-lax1-monterey-park-ca"
  },
  {
   "id": "digihost-north-tonawanda-ny",
   "name": "Digihost / Digi Power X, Fortistar North Tonawanda",
   "operator": "Digihost (Digi Power X)",
   "company": "digi-power-x",
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "North Tonawanda",
   "county": "Niagara",
   "state": "NY",
   "latitude": 43.0483121591696,
   "longitude": -78.85360658271534,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 120,
   "capacity_mw_operational": 60,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": 55,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 12,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/north-tonawanda-digi-power-noise-class-action",
   "profile_url": "https://suedatacenters.org/data-centers/digihost-north-tonawanda-ny"
  },
  {
   "id": "digihost-erie-county-ny",
   "name": "Digihost, Erie County (Buffalo)",
   "operator": "Digihost (Digi Power X)",
   "company": "digi-power-x",
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Buffalo",
   "county": "Erie",
   "state": "NY",
   "latitude": 42.919825,
   "longitude": -78.81999,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 42,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digihost-erie-county-ny"
  },
  {
   "id": "digital-realty-727-s-grand-ave-la-ca",
   "name": "Digital Realty 727 S. Grand Avenue (DTLA)",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Los Angeles",
   "county": "Los Angeles",
   "state": "CA",
   "latitude": 34.046823,
   "longitude": -118.257149,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-05-24",
   "record_updated": "2026-08-02",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-727-s-grand-ave-la-ca"
  },
  {
   "id": "digital-realty-8100-boone-boulevard-former-dupont-fabros-va3-va",
   "name": "Digital Realty 8100 Boone Boulevard (former DuPont Fabros VA3)",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Vienna",
   "county": "Fairfax",
   "state": "VA",
   "latitude": 38.9137236,
   "longitude": -77.2258825,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-8100-boone-boulevard-former-dupont-fabros-va3-va"
  },
  {
   "id": "digital-realty-acc10-va",
   "name": "Digital Realty ACC10",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0126563,
   "longitude": -77.4656035,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "digital-realty-acc3-va",
   "name": "Digital Realty ACC3",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.01988,
   "longitude": -77.4598033,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 36.4,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-acc3-va"
  },
  {
   "id": "digital-realty-acc9-va",
   "name": "Digital Realty ACC9",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0154331,
   "longitude": -77.4673732,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "digital-realty-atl11-ga",
   "name": "Digital Realty ATL11",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Austell",
   "county": "Cobb",
   "state": "GA",
   "latitude": 33.7465605,
   "longitude": -84.5797407,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-atl11-ga"
  },
  {
   "id": "digital-realty-atlanta-atl13-ga",
   "name": "Digital Realty Atlanta ATL13",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Atlanta",
   "county": "Fulton",
   "state": "GA",
   "latitude": 33.7555186,
   "longitude": -84.3914814,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-atlanta-atl13-ga"
  },
  {
   "id": "digital-realty-aus11-tx",
   "name": "Digital Realty AUS11",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Austin",
   "county": "Travis",
   "state": "TX",
   "latitude": 30.212156,
   "longitude": -97.6957555,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-aus11-tx"
  },
  {
   "id": "digitalrealty-bos14-needham-ma",
   "name": "Digital Realty BOS14",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Needham",
   "county": "Norfolk",
   "state": "MA",
   "latitude": 42.30177,
   "longitude": -71.22184,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digitalrealty-bos14-needham-ma"
  },
  {
   "id": "digital-realty-ch2-il",
   "name": "Digital Realty CH2",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Elk Grove Village",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.9945332,
   "longitude": -87.9577513,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-ch2-il"
  },
  {
   "id": "digital-realty-chicago-ch1-il",
   "name": "Digital Realty Chicago CH1",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Elk Grove Village",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.9942413,
   "longitude": -87.961935,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-chicago-ch1-il"
  },
  {
   "id": "digital-realty-clifton-campus-nj",
   "name": "Digital Realty Clifton Campus",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Clifton",
   "county": "Passaic",
   "state": "NJ",
   "latitude": 40.862137,
   "longitude": -74.160393,
   "coordinate_precision": "representative_multi_site",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-clifton-campus-nj"
  },
  {
   "id": "digital-realty-iad38-va",
   "name": "Digital Realty IAD38",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0010841,
   "longitude": -77.4772014,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "digital-realty-iad41-building-p-va",
   "name": "Digital Realty IAD41 (Building P)",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0088059,
   "longitude": -77.4582358,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "digital-realty-iad42-building-r-va",
   "name": "Digital Realty IAD42 (Building R)",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sterling",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0056891,
   "longitude": -77.4494637,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "digital-realty-iad43-building-s-va",
   "name": "Digital Realty IAD43 (Building S)",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sterling",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0018258,
   "longitude": -77.4527034,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "digital-realty-iad44-va",
   "name": "Digital Realty IAD44",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sterling",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 38.9608537,
   "longitude": -77.4913983,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-iad44-va"
  },
  {
   "id": "digital-realty-iad55-va",
   "name": "Digital Realty IAD55",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sterling",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 38.9921932,
   "longitude": -77.4339218,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "digital-realty-iad73-va",
   "name": "Digital Realty IAD73",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0066187,
   "longitude": -77.4664074,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "digital-realty-jfk10-manhattan-ny",
   "name": "Digital Realty JFK10 (111 Eighth Avenue)",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "New York",
   "county": "New York",
   "state": "NY",
   "latitude": 40.741369,
   "longitude": -74.003206,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Con Edison",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-jfk10-manhattan-ny"
  },
  {
   "id": "digital-realty-lax12-ca",
   "name": "Digital Realty LAX12",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "El Segundo",
   "county": "Los Angeles",
   "state": "CA",
   "latitude": 33.9156593,
   "longitude": -118.3846186,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Southern California Edison (SCE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-lax12-ca"
  },
  {
   "id": "digital-realty-mia10-fl",
   "name": "Digital Realty MIA10",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Miami",
   "county": "Miami-Dade",
   "state": "FL",
   "latitude": 25.7758419,
   "longitude": -80.1929625,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-mia10-fl"
  },
  {
   "id": "digital-realty-charlotte-nc",
   "name": "Digital Realty Moores Chapel Data Center Campus",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Charlotte",
   "county": "Mecklenburg",
   "state": "NC",
   "latitude": 35.2422,
   "longitude": -80.9562,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 400,
   "capacity_mw_operational": null,
   "land_acres": 156,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Duke Energy Carolinas",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-04",
   "record_updated": "2026-08-15",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-charlotte-nc"
  },
  {
   "id": "digital-realty-new-york-ewr10-nj",
   "name": "Digital Realty New York EWR10",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Weehawken",
   "county": "Hudson",
   "state": "NJ",
   "latitude": 40.7618178,
   "longitude": -74.0250281,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PSE&G",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-new-york-ewr10-nj"
  },
  {
   "id": "digital-realty-new-york-ewr11-nj",
   "name": "Digital Realty New York EWR11",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Piscataway Township",
   "county": "Middlesex",
   "state": "NJ",
   "latitude": 40.5537931,
   "longitude": -74.4571024,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PSE&G",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-new-york-ewr11-nj"
  },
  {
   "id": "digital-realty-new-york-ewr12-nj",
   "name": "Digital Realty New York EWR12",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Piscataway Township",
   "county": "Middlesex",
   "state": "NJ",
   "latitude": 40.5529283,
   "longitude": -74.4592038,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PSE&G",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-new-york-ewr12-nj"
  },
  {
   "id": "digital-realty-northern-virginia-acc4-va",
   "name": "Digital Realty Northern Virginia ACC4",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0178592,
   "longitude": -77.4624708,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-northern-virginia-acc4-va"
  },
  {
   "id": "digital-realty-northern-virginia-acc5-va",
   "name": "Digital Realty Northern Virginia ACC5",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0201584,
   "longitude": -77.4631033,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-northern-virginia-acc5-va"
  },
  {
   "id": "digital-realty-northern-virginia-iad14-va",
   "name": "Digital Realty Northern Virginia IAD14",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0033364,
   "longitude": -77.4870935,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-northern-virginia-iad14-va"
  },
  {
   "id": "digital-realty-oak10-ca",
   "name": "Digital Realty OAK10",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Oakland",
   "county": "Alameda",
   "state": "CA",
   "latitude": 37.7992148,
   "longitude": -122.2829762,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-oak10-ca"
  },
  {
   "id": "digital-realty-ord10-il",
   "name": "Digital Realty ORD10",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Chicago",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.8533507,
   "longitude": -87.6183067,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-ord10-il"
  },
  {
   "id": "digital-realty-ord11-il",
   "name": "Digital Realty ORD11",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Chicago",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.8743036,
   "longitude": -87.6299404,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-ord11-il"
  },
  {
   "id": "digital-realty-ord12-franklin-park-il",
   "name": "Digital Realty ORD12",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Franklin Park",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.9283705,
   "longitude": -87.8592552,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "digital-realty-pdx10-or",
   "name": "Digital Realty PDX10",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5476034,
   "longitude": -122.891975,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "digital-realty-pdx11-or",
   "name": "Digital Realty PDX11",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5679542,
   "longitude": -122.9167725,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Portland General Electric (PGE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "digital-realty-pdx12-or",
   "name": "Digital Realty PDX12",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.56952,
   "longitude": -122.91865,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "digital-realty-phx-tempe-az",
   "name": "Digital Realty PHX (Tempe)",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tempe",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.3446197,
   "longitude": -111.8992189,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 33.8,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-phx-tempe-az"
  },
  {
   "id": "digital-realty-phx15-az",
   "name": "Digital Realty PHX15",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Chandler",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.2749228,
   "longitude": -111.8866379,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-phx15-az"
  },
  {
   "id": "digital-realty-sc1-ca",
   "name": "Digital Realty SC1",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3616469,
   "longitude": -121.9439784,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-sc1-ca"
  },
  {
   "id": "digital-realty-sea1-intergate-seattle-east-bldg-4-wa",
   "name": "Digital Realty SEA1 (Intergate Seattle-East, Bldg 4)",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tukwila",
   "county": "King",
   "state": "WA",
   "latitude": 47.4934032,
   "longitude": -122.2888803,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Seattle City Light",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-sea1-intergate-seattle-east-bldg-4-wa"
  },
  {
   "id": "digital-realty-sfo10-ca",
   "name": "Digital Realty SFO10",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Francisco",
   "county": "San Francisco",
   "state": "CA",
   "latitude": 37.7236272,
   "longitude": -122.3979543,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-sfo10-ca"
  },
  {
   "id": "digital-realty-sfo12-365-main-street-ca",
   "name": "Digital Realty SFO12 (365 Main Street)",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Francisco",
   "county": "San Francisco",
   "state": "CA",
   "latitude": 37.788731,
   "longitude": -122.390469,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-sfo12-365-main-street-ca"
  },
  {
   "id": "digital-realty-silicon-valley-sjc10-ca",
   "name": "Digital Realty Silicon Valley SJC10",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.375822,
   "longitude": -121.9533359,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-silicon-valley-sjc10-ca"
  },
  {
   "id": "digital-realty-silicon-valley-sjc11-ca",
   "name": "Digital Realty Silicon Valley SJC11",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3763668,
   "longitude": -121.9485649,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-silicon-valley-sjc11-ca"
  },
  {
   "id": "digital-realty-silicon-valley-sjc16-ca",
   "name": "Digital Realty Silicon Valley SJC16",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3749324,
   "longitude": -121.9559987,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-silicon-valley-sjc16-ca"
  },
  {
   "id": "digital-realty-silicon-valley-sjc30-ca",
   "name": "Digital Realty Silicon Valley SJC30",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3782874,
   "longitude": -121.9581107,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-silicon-valley-sjc30-ca"
  },
  {
   "id": "digital-realty-silicon-valley-sjc31-ca",
   "name": "Digital Realty Silicon Valley SJC31",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3722213,
   "longitude": -121.9482625,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-silicon-valley-sjc31-ca"
  },
  {
   "id": "digital-realty-sjc34-ca",
   "name": "Digital Realty SJC34",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3724077,
   "longitude": -121.973647,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-sjc34-ca"
  },
  {
   "id": "digital-realty-somerset-650-randolph-road-nj",
   "name": "Digital Realty Somerset (650 Randolph Road)",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Franklin Township (Somerset)",
   "county": "Somerset",
   "state": "NJ",
   "latitude": 40.5375265,
   "longitude": -74.5555236,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PSE&G",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-somerset-650-randolph-road-nj"
  },
  {
   "id": "digital-realty-va3-va",
   "name": "Digital Realty VA3",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Reston",
   "county": "Fairfax",
   "state": "VA",
   "latitude": 38.9484941,
   "longitude": -77.3273071,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-va3-va"
  },
  {
   "id": "digital-realty-va4-va",
   "name": "Digital Realty VA4",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Bristow",
   "county": "Prince William",
   "state": "VA",
   "latitude": 38.7780614,
   "longitude": -77.594905,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-va4-va"
  },
  {
   "id": "digital-realty-vernon-ca",
   "name": "Digital Realty Vernon Data Center",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Vernon",
   "county": "Los Angeles",
   "state": "CA",
   "latitude": 33.99951,
   "longitude": -118.2252615,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 32,
   "capacity_mw_operational": null,
   "land_acres": 5.4,
   "investment_usd": 48800000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Vernon Public Utilities",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/digital-realty-vernon-ca"
  },
  {
   "id": "dmg-blockchain-boardman-or",
   "name": "DMG Blockchain Boardman Facility",
   "operator": "DMG Blockchain Solutions",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Boardman",
   "county": "Morrow",
   "state": "OR",
   "latitude": 45.83986,
   "longitude": -119.70058,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 3.75,
   "land_acres": 8,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dmg-blockchain-boardman-or"
  },
  {
   "id": "docomo-guam-harmon-gu",
   "name": "DoCoMo Guam Data Center",
   "operator": "DOCOMO PACIFIC",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Dededo",
   "county": null,
   "state": "GU",
   "latitude": 13.5120114,
   "longitude": 144.827566,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "docomo-saipan-susupe-mp",
   "name": "DoCoMo Pacific Susupe Data Center",
   "operator": "DOCOMO PACIFIC",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Susupe",
   "county": null,
   "state": "MP",
   "latitude": 15.1568682,
   "longitude": 145.7051697,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "dpo-wisconsin-rapids-hpc-wi",
   "name": "DPO Wisconsin Rapids AI Computing Facility",
   "operator": "Digital Power Optimization",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Wisconsin Rapids",
   "county": "Wood",
   "state": "WI",
   "latitude": 44.3917589,
   "longitude": -89.8228767,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 20,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 200000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": "Consolidated Water Power Company",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-01-31",
   "record_updated": "2026-08-18",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dpo-wisconsin-rapids-hpc-wi"
  },
  {
   "id": "drfortress-koapaka-honolulu-hi",
   "name": "DRFortress Data Center",
   "operator": "DRFortress",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Honolulu",
   "county": null,
   "state": "HI",
   "latitude": 21.3344171,
   "longitude": -157.9171752,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/drfortress-koapaka-honolulu-hi"
  },
  {
   "id": "dulles-cloud-south-gainesville-prince-william-va",
   "name": "Dulles Cloud South (Dulles South Innovation Center)",
   "operator": "Undisclosed",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Gainesville",
   "county": "Prince William County",
   "state": "VA",
   "latitude": 38.83,
   "longitude": -77.61,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1940,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "dynamic-internet-salem-nh",
   "name": "Dynamic Internet Salem Data Center",
   "operator": "Dynamic Internet",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Salem",
   "county": "Rockingham",
   "state": "NH",
   "latitude": 42.7648858,
   "longitude": -71.2420671,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "eagle-mountain-data-oc1-anaheim-ca",
   "name": "Eagle Mountain Data OC1 (Anaheim Data Center)",
   "operator": "Eagle Mountain Data Inc",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Anaheim",
   "county": "Orange",
   "state": "CA",
   "latitude": 33.8366,
   "longitude": -117.9143,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "lakeland-equity-east-55th-cleveland-oh",
   "name": "East 55th Street Data Center (Slavic Village)",
   "operator": "Lakeland Equity Group",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Cleveland",
   "county": "Cuyahoga",
   "state": "OH",
   "latitude": 41.461694,
   "longitude": -81.651208,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 150,
   "capacity_mw_operational": null,
   "land_acres": 35,
   "investment_usd": 1600000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lakeland-equity-east-55th-cleveland-oh"
  },
  {
   "id": "ebay-topaz-south-jordan-ut",
   "name": "eBay Topaz Data Center",
   "operator": "eBay",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "South Jordan",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.55849,
   "longitude": -111.93671,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 7.2,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ebay-topaz-south-jordan-ut"
  },
  {
   "id": "echostar-cheyenne-wy",
   "name": "EchoStar Cheyenne Data Center and Satellite Uplink Facility",
   "operator": "EchoStar",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Cheyenne",
   "county": "Laramie",
   "state": "WY",
   "latitude": 41.135,
   "longitude": -104.725,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2010-08-03",
   "record_updated": "2026-08-19",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/echostar-cheyenne-wy"
  },
  {
   "id": "ecl-csc1-santa-clara-ca",
   "name": "ECL CSC-1 FlexGrid AI Data Center",
   "operator": "ECL",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.354,
   "longitude": -121.955,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 35,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Silicon Valley Power (SVP)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-04",
   "record_updated": "2026-07-06",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ecl-csc1-santa-clara-ca"
  },
  {
   "id": "eco-yotta-oneonta-ny",
   "name": "Eco-Yotta Data Center (proposed, County Route 9)",
   "operator": "Eco-Yotta Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Oneonta",
   "county": "Otsego",
   "state": "NY",
   "latitude": 42.451656,
   "longitude": -75.115285,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/eco-yotta-oneonta-ny"
  },
  {
   "id": "edgeconnex-chi02-il",
   "name": "EdgeConneX CHI02",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Elk Grove Village",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.0014952,
   "longitude": -87.9525624,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 7,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-chi02-il"
  },
  {
   "id": "edgeconnex-den01-denver-co",
   "name": "EdgeConneX DEN01 Denver",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Englewood",
   "county": "Douglas",
   "state": "CO",
   "latitude": 39.5608526,
   "longitude": -104.8275475,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 3,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "edgeconnex-det01-mi",
   "name": "EdgeConneX DET01",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Detroit (Oakland County)",
   "county": "Oakland",
   "state": "MI",
   "latitude": 42.4476693,
   "longitude": -83.2626336,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "DTE Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-det01-mi"
  },
  {
   "id": "edgeconnex-edclas01-las-vegas-nv",
   "name": "EdgeConneX Las Vegas (EDCLAS01)",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.0662784,
   "longitude": -115.1315773,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 0.75,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-11",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-edclas01-las-vegas-nv"
  },
  {
   "id": "edgeconnex-mad01-madison-wi",
   "name": "EdgeConneX Madison (MAD01)",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Madison",
   "county": "Dane",
   "state": "WI",
   "latitude": 43.0481038,
   "longitude": -89.2982832,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-18",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-mad01-madison-wi"
  },
  {
   "id": "edgeconnex-mcn-new-albany-licking-county-oh",
   "name": "EdgeConneX MCN New Albany (South Campus)",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "New Albany",
   "county": "Licking",
   "state": "OH",
   "latitude": 40.08878,
   "longitude": -82.72274,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 224,
   "capacity_mw_operational": null,
   "land_acres": 267,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-07-16",
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-mcn-new-albany-licking-county-oh"
  },
  {
   "id": "edgeconnex-mesa-campus-phx11-3302-s-hawes-rd-az",
   "name": "EdgeConneX Mesa Campus (PHX11 / 3302 S Hawes Rd)",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Mesa",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.3520091,
   "longitude": -111.6475291,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-mesa-campus-phx11-3302-s-hawes-rd-az"
  },
  {
   "id": "edgeconnex-nas01-nashville-tn",
   "name": "EdgeConneX NAS01 Nashville",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Nashville",
   "county": "Davidson",
   "state": "TN",
   "latitude": 36.1449104,
   "longitude": -86.703549,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-nas01-nashville-tn"
  },
  {
   "id": "edgeconnex-por01-por02-hillsboro-campus-or",
   "name": "EdgeConneX POR01/POR02 (Hillsboro campus)",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5564226,
   "longitude": -122.9122077,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Portland General Electric (PGE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-por01-por02-hillsboro-campus-or"
  },
  {
   "id": "edgeconnex-sac01-ca",
   "name": "EdgeConneX SAC01",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Rancho Cordova",
   "county": "Sacramento",
   "state": "CA",
   "latitude": 38.5922987,
   "longitude": -121.27744,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "SMUD",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-sac01-ca"
  },
  {
   "id": "edgeconnex-sdg01-ca",
   "name": "EdgeConneX SDG01",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Diego",
   "county": "San Diego",
   "state": "CA",
   "latitude": 32.8423554,
   "longitude": -117.1694226,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "San Diego Gas & Electric (SDG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-sdg01-ca"
  },
  {
   "id": "edgeconnex-west-valley-city-ut",
   "name": "EdgeConneX SLC01",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "West Valley City",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.69679,
   "longitude": -111.9867,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 1,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-west-valley-city-ut"
  },
  {
   "id": "edgeconnex-sli01-slidell-la",
   "name": "EdgeConneX SLI01 (Slidell)",
   "operator": "EdgeConneX",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Slidell",
   "county": "St. Tammany",
   "state": "LA",
   "latitude": 30.287098,
   "longitude": -89.737403,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-sli01-slidell-la"
  },
  {
   "id": "edgecore-culpeper-tech-zone-va",
   "name": "EdgeCore Culpeper Data Center Campus",
   "operator": "EdgeCore Digital Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Culpeper",
   "county": "Culpeper",
   "state": "VA",
   "latitude": 38.4735,
   "longitude": -77.96,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 216,
   "capacity_mw_operational": null,
   "land_acres": 120,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Rappahannock Electric Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-07-18",
   "record_updated": "2026-08-27",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgecore-culpeper-tech-zone-va"
  },
  {
   "id": "edgecore-mesa-az",
   "name": "EdgeCore Mesa Data Center Campus",
   "operator": "EdgeCore Digital Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Mesa",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.375,
   "longitude": -111.6497,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 450,
   "capacity_mw_operational": 206,
   "land_acres": 84,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Salt River Project (SRP)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-01",
   "record_updated": "2026-08-08",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgecore-mesa-az"
  },
  {
   "id": "edgecore-reno-campus-storey-county-nv",
   "name": "EdgeCore Reno Data Center Campus",
   "operator": "EdgeCore Digital Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "McCarran",
   "county": "Storey",
   "state": "NV",
   "latitude": 39.5429755,
   "longitude": -119.4851422,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 216,
   "capacity_mw_operational": null,
   "land_acres": 56,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-08",
   "record_updated": "2026-09-11",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgecore-reno-campus-storey-county-nv"
  },
  {
   "id": "edgecore-shannon-hill-louisa-va",
   "name": "EdgeCore Shannon Hill Data Center Campus",
   "operator": "EdgeCore Digital Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Louisa",
   "state": "VA",
   "latitude": 37.836,
   "longitude": -77.988,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1100,
   "capacity_mw_operational": null,
   "land_acres": 697,
   "investment_usd": 17000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Rappahannock Electric Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-06-24",
   "record_updated": "2026-09-10",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgecore-shannon-hill-louisa-va"
  },
  {
   "id": "edged-energy-ankeny-ia",
   "name": "Edged Ankeny (Des Moines) Data Center",
   "operator": "Edged Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Ankeny",
   "county": "Polk",
   "state": "IA",
   "latitude": 41.7297,
   "longitude": -93.6058,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 13.2,
   "capacity_mw_operational": null,
   "land_acres": 17.5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": 0,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-05-06",
   "record_updated": "2026-08-21",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edged-energy-ankeny-ia"
  },
  {
   "id": "edged-atlanta-tilford-yard-ga",
   "name": "Edged Atlanta (ATL01)",
   "operator": "Edged Energy (Endeavour)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Atlanta",
   "county": "Fulton",
   "state": "GA",
   "latitude": 33.749,
   "longitude": -84.388,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 168,
   "capacity_mw_operational": 27,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-08-21",
   "record_updated": "2026-08-28",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "edged-aurora-il",
   "name": "Edged Chicago Campus, Aurora (ORD01)",
   "operator": "Edged US",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Aurora",
   "county": "DuPage",
   "state": "IL",
   "latitude": 41.79,
   "longitude": -88.284,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 72,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edged-aurora-il"
  },
  {
   "id": "edged-columbus-new-albany-oh",
   "name": "Edged Columbus",
   "operator": "Edged (an Endeavour company)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "New Albany",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.10608,
   "longitude": -82.81578,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 24,
   "land_acres": 14,
   "investment_usd": 246000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-18",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edged-columbus-new-albany-oh"
  },
  {
   "id": "edged-council-bluffs-ia",
   "name": "Edged Council Bluffs Data Center Campus (Project Lola)",
   "operator": "Edged Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Council Bluffs",
   "county": "Pottawattamie",
   "state": "IA",
   "latitude": 41.278141,
   "longitude": -95.7940246,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-09-04",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edged-council-bluffs-ia"
  },
  {
   "id": "edged-dallas-irving-tx",
   "name": "Edged Dallas (Irving)",
   "operator": "Edged Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Irving",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.8211516,
   "longitude": -96.9169508,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 24,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "edged-mesa-az",
   "name": "Edged Mesa Data Center",
   "operator": "Edged US",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Mesa",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.4152,
   "longitude": -111.8315,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 36,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": 0,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-04-01",
   "record_updated": "2026-08-28",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "edged-gateway-prichard-al",
   "name": "Edged Prichard Data Center (Project Gateway)",
   "operator": "Edged US",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Prichard",
   "county": "Mobile",
   "state": "AL",
   "latitude": 30.7387998,
   "longitude": -88.0788889,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 8,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 93000000,
   "jobs_permanent": 20,
   "jobs_construction": 150,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edged-gateway-prichard-al"
  },
  {
   "id": "edgeuno-sju1-san-juan-pr",
   "name": "EdgeUno SJU1",
   "operator": "EdgeUno, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "San Juan",
   "county": null,
   "state": "PR",
   "latitude": 18.43004,
   "longitude": -66.05873,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "element-critical-austin-one-tx",
   "name": "Element Critical Austin One",
   "operator": "Element Critical",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Austin",
   "county": "Travis",
   "state": "TX",
   "latitude": 30.3428035,
   "longitude": -97.6961735,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/element-critical-austin-one-tx"
  },
  {
   "id": "element-critical-chicago-one-il",
   "name": "Element Critical Chicago One",
   "operator": "Element Critical",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Wood Dale",
   "county": "DuPage",
   "state": "IL",
   "latitude": 41.9757324,
   "longitude": -87.9646913,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 7,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/element-critical-chicago-one-il"
  },
  {
   "id": "element-critical-chicago-two-il",
   "name": "Element Critical Chicago Two",
   "operator": "Element Critical",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Wood Dale",
   "county": "DuPage",
   "state": "IL",
   "latitude": 41.9742269,
   "longitude": -87.9671756,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/element-critical-chicago-two-il"
  },
  {
   "id": "elk-river-capital-swervo-mn",
   "name": "Elk River Data Center (Elk River Capital / Swervo Development)",
   "operator": "Elk River Capital LLC (Swervo Development Corp affiliate)",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Elk River",
   "county": "Sherburne",
   "state": "MN",
   "latitude": 45.3187147,
   "longitude": -93.5864375,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 33,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "empire-ai-beta-buffalo-ny",
   "name": "Empire AI Beta",
   "operator": "Empire AI consortium (hosted by the University at Buffalo, SUNY)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Buffalo",
   "county": "Erie",
   "state": "NY",
   "latitude": 42.8949,
   "longitude": -78.8677,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 40000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 40000000,
   "announced_date": "2025-06",
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/empire-ai-beta-buffalo-ny"
  },
  {
   "id": "empire-ai-gamma-buffalo-ny",
   "name": "Empire AI Gamma",
   "operator": "Empire AI consortium (hosted by the University at Buffalo, SUNY)",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Buffalo",
   "county": "Erie",
   "state": "NY",
   "latitude": 42.8864,
   "longitude": -78.8784,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/empire-ai-gamma-buffalo-ny"
  },
  {
   "id": "encore-technologies-blu1-blue-ash-oh",
   "name": "Encore Technologies BLU1 (Blue Ash)",
   "operator": "Encore Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Blue Ash",
   "county": "Hamilton",
   "state": "OH",
   "latitude": 39.277612,
   "longitude": -84.36949,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "hawaiiantel-endeavor-honolulu-hi",
   "name": "Endeavor Data Center",
   "operator": "Hawaiian Telcom",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Honolulu",
   "county": null,
   "state": "HI",
   "latitude": 21.304547,
   "longitude": -157.855676,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "ta-infrastructure-endicott-ak",
   "name": "Endicott Bitcoin Mining Pilot",
   "operator": "TA Infrastructure",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "North Slope",
   "state": "AK",
   "latitude": 70.326677,
   "longitude": -148.9432527,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1.4,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ta-infrastructure-endicott-ak"
  },
  {
   "id": "enerfore-pleasant-valley-tioga-nd",
   "name": "Enerfore Pleasant Valley Data Center",
   "operator": "Enerfore Digital",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Tioga",
   "county": "Williams",
   "state": "ND",
   "latitude": 48.28,
   "longitude": -102.9424,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 30,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/enerfore-pleasant-valley-tioga-nd"
  },
  {
   "id": "w-holdings-energy-generation-technology-campus-maricopa-az",
   "name": "Energy Generation and Technology Campus",
   "operator": "W Holdings",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Maricopa",
   "county": "Pinal",
   "state": "AZ",
   "latitude": 32.945,
   "longitude": -112.035,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 495,
   "investment_usd": 9500000000,
   "jobs_permanent": 500,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10-16",
   "record_updated": "2026-08-28",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/w-holdings-energy-generation-technology-campus-maricopa-az"
  },
  {
   "id": "energy-storage-solutions-fayetteville-cumberland-county-nc",
   "name": "Energy Storage Solutions Fayetteville AI Data Center Campus",
   "operator": "Energy Storage Solutions",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Fayetteville",
   "county": "Cumberland",
   "state": "NC",
   "latitude": 35.053,
   "longitude": -78.878,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-07-16",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/energy-storage-solutions-fayetteville-cumberland-county-nc"
  },
  {
   "id": "energy-vault-snyder-scurry-county-tx",
   "name": "Energy Vault Snyder AI Campus",
   "operator": "Energy Vault, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Snyder",
   "county": "Scurry",
   "state": "TX",
   "latitude": 32.7138,
   "longitude": -100.9112,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07-27",
   "record_updated": "2026-09-08",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/energy-vault-snyder-scurry-county-tx"
  },
  {
   "id": "jackson-technical-enguard-tulsa-ok",
   "name": "ENGUARD Data Center (Jackson Technical)",
   "operator": "Jackson Technical",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tulsa",
   "county": "Tulsa County",
   "state": "OK",
   "latitude": 36.1509,
   "longitude": -95.9856,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 0.4,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/jackson-technical-enguard-tulsa-ok"
  },
  {
   "id": "epic-hosting-verona-wi",
   "name": "Epic Hosting Verona Data Center",
   "operator": "Epic Hosting, LLC (Epic Systems)",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Verona",
   "county": "Dane County",
   "state": "WI",
   "latitude": 42.98,
   "longitude": -89.562,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/epic-hosting-verona-wi"
  },
  {
   "id": "epicio-st-croix-vi",
   "name": "Epic.io St. Croix Data Center",
   "operator": "Epic.io",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "St. Croix",
   "county": null,
   "state": "VI",
   "latitude": 17.7581924,
   "longitude": -64.8874524,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "equinix-ashburn-va",
   "name": "Equinix Ashburn Campus (DC1-DC15)",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0437,
   "longitude": -77.4875,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 500,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "1999",
   "record_updated": "2026-08-26",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-ashburn-va"
  },
  {
   "id": "equinix-bo1-waltham-ma",
   "name": "Equinix BO1",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Waltham",
   "county": "Middlesex",
   "state": "MA",
   "latitude": 42.39635,
   "longitude": -71.26906,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "equinix-ch1-il",
   "name": "Equinix CH1",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Chicago",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.8535578,
   "longitude": -87.6180475,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-ch1-il"
  },
  {
   "id": "equinix-ch7-il",
   "name": "Equinix CH7",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Westmont",
   "county": "DuPage",
   "state": "IL",
   "latitude": 41.8125627,
   "longitude": -87.9728504,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-ch7-il"
  },
  {
   "id": "equinix-ch8-minooka-il",
   "name": "Equinix CH8 Minooka",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Minooka",
   "county": "Grundy",
   "state": "IL",
   "latitude": 41.4506,
   "longitude": -88.262,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 300,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-ch8-minooka-il"
  },
  {
   "id": "equinix-dallas-da11-tx",
   "name": "Equinix Dallas DA11",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Dallas",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.8017196,
   "longitude": -96.8243167,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Oncor",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "equinix-dallas-da12-tx",
   "name": "Equinix Dallas DA12 (West Dallas)",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Dallas",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.8209286,
   "longitude": -96.8586608,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 836000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-dallas-da12-tx"
  },
  {
   "id": "equinix-dc2-va",
   "name": "Equinix DC2",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0163894,
   "longitude": -77.4590691,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-dc2-va"
  },
  {
   "id": "equinix-dc3-va",
   "name": "Equinix DC3",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0220154,
   "longitude": -77.460235,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-dc3-va"
  },
  {
   "id": "equinix-la3-el-segundo-ca",
   "name": "Equinix LA3",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "El Segundo",
   "county": "Los Angeles",
   "state": "CA",
   "latitude": 33.9263426,
   "longitude": -118.3940556,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-la3-el-segundo-ca"
  },
  {
   "id": "equinix-la4-el-segundo-ca",
   "name": "Equinix LA4",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "El Segundo",
   "county": "Los Angeles",
   "state": "CA",
   "latitude": 33.9219979,
   "longitude": -118.383118,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-la4-el-segundo-ca"
  },
  {
   "id": "equinix-mi1-nap-of-the-americas-fl",
   "name": "Equinix MI1 (NAP of the Americas)",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Miami",
   "county": "Miami-Dade",
   "state": "FL",
   "latitude": 25.782359,
   "longitude": -80.1930886,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-mi1-nap-of-the-americas-fl"
  },
  {
   "id": "equinix-ny11-carteret-nj",
   "name": "Equinix NY11",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Carteret",
   "county": "Middlesex",
   "state": "NJ",
   "latitude": 40.58433,
   "longitude": -74.243607,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-ny11-carteret-nj"
  },
  {
   "id": "equinix-ny3-secaucus-nj",
   "name": "Equinix NY3",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Secaucus",
   "county": "Hudson",
   "state": "NJ",
   "latitude": 40.774179,
   "longitude": -74.065868,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-ny3-secaucus-nj"
  },
  {
   "id": "equinix-ny4-secaucus-nj",
   "name": "Equinix NY4",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Secaucus",
   "county": "Hudson",
   "state": "NJ",
   "latitude": 40.778534,
   "longitude": -74.072237,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-ny4-secaucus-nj"
  },
  {
   "id": "equinix-ny5-nj",
   "name": "Equinix NY5",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Secaucus",
   "county": "Hudson",
   "state": "NJ",
   "latitude": 40.7785845,
   "longitude": -74.0723242,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "PSE&G",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-ny5-nj"
  },
  {
   "id": "equinix-ny7-nj",
   "name": "Equinix NY7",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "North Bergen",
   "county": "Hudson",
   "state": "NJ",
   "latitude": 40.7968626,
   "longitude": -74.0311403,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PSE&G",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-ny7-nj"
  },
  {
   "id": "equinix-ny9-manhattan-ny",
   "name": "Equinix NY9",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "New York",
   "county": "New York",
   "state": "NY",
   "latitude": 40.740907,
   "longitude": -74.001768,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "equinix-sv1-ca",
   "name": "Equinix SV1",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Jose",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.2415975,
   "longitude": -121.7833277,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Pacific Gas & Electric (PG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-sv1-ca"
  },
  {
   "id": "equinix-sv15-ca",
   "name": "Equinix SV15",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3754952,
   "longitude": -121.9884063,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-sv15-ca"
  },
  {
   "id": "equinix-sv2-ca",
   "name": "Equinix SV2",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3784704,
   "longitude": -121.9549839,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-sv2-ca"
  },
  {
   "id": "equinix-sv4-ca",
   "name": "Equinix SV4",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sunnyvale",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.4145109,
   "longitude": -122.0145563,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Pacific Gas & Electric (PG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-sv4-ca"
  },
  {
   "id": "equinix-sv8-ca",
   "name": "Equinix SV8",
   "operator": "Equinix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Palo Alto",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.4458951,
   "longitude": -122.160786,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "City of Palo Alto Utilities",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/equinix-sv8-ca"
  },
  {
   "id": "emerald-lakes-etheridge-lakes-data-center-chesapeake-va",
   "name": "Etheridge Lakes Data Center (Great Bridge)",
   "operator": "Emerald Lakes Estates (Doug Fuller)",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Chesapeake",
   "county": "Chesapeake (independent city)",
   "state": "VA",
   "latitude": 36.68061281906499,
   "longitude": -76.18817902157426,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 22.6,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/emerald-lakes-etheridge-lakes-data-center-chesapeake-va"
  },
  {
   "id": "evolution-technology-bourbon-county-ks",
   "name": "Evolution Technology Bitcoin Mine (Bourbon County)",
   "operator": "Evolution Technology",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Uniontown",
   "county": "Bourbon",
   "state": "KS",
   "latitude": 37.8473,
   "longitude": -94.9753,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/evolution-technology-bourbon-county-ks"
  },
  {
   "id": "expedient-baltimore-tide-point-md",
   "name": "Expedient Baltimore - Tide Point",
   "operator": "Expedient",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Baltimore",
   "county": "Baltimore city",
   "state": "MD",
   "latitude": 39.2746554,
   "longitude": -76.5916709,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/expedient-baltimore-tide-point-md"
  },
  {
   "id": "expedient-bwi1-owings-mills-md",
   "name": "Expedient BWI1 (Owings Mills)",
   "operator": "Expedient",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Owings Mills",
   "county": "Baltimore",
   "state": "MD",
   "latitude": 39.4273178,
   "longitude": -76.8115503,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 0.8,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "BGE",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/expedient-bwi1-owings-mills-md"
  },
  {
   "id": "expedient-cleveland-neo-oh",
   "name": "Expedient Cleveland (NEO 151 / NEO 152)",
   "operator": "Expedient",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Garfield Heights",
   "county": "Cuyahoga",
   "state": "OH",
   "latitude": 41.428,
   "longitude": -81.5733,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/expedient-cleveland-neo-oh"
  },
  {
   "id": "expedient-cmh1-upper-arlington-oh",
   "name": "Expedient CMH1 (Upper Arlington)",
   "operator": "Expedient",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Upper Arlington",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.0578366,
   "longitude": -83.078426,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 1.6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "expedient-cmh2-dublin-oh",
   "name": "Expedient CMH2 (Dublin)",
   "operator": "Expedient",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Dublin",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.0907697,
   "longitude": -83.1539198,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 4.8,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/expedient-cmh2-dublin-oh"
  },
  {
   "id": "expedient-cmh3-lewis-center-oh",
   "name": "Expedient CMH3 (Lewis Center)",
   "operator": "Expedient",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Lewis Center",
   "county": "Delaware",
   "state": "OH",
   "latitude": 40.1533067,
   "longitude": -82.9614584,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 7,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "expedient-mke1-milwaukee-franklin-wi",
   "name": "Expedient MKE1 (Milwaukee/Franklin)",
   "operator": "Expedient",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Franklin",
   "county": "Milwaukee",
   "state": "WI",
   "latitude": 42.8631424,
   "longitude": -87.9778759,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 1.6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "We Energies",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/expedient-mke1-milwaukee-franklin-wi"
  },
  {
   "id": "expedient-pit1-green-tree-pittsburgh-south-pa",
   "name": "Expedient PIT1 (Green Tree / Pittsburgh South)",
   "operator": "Expedient",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Pittsburgh",
   "county": "Allegheny",
   "state": "PA",
   "latitude": 40.427371,
   "longitude": -80.0425212,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 1.8,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/expedient-pit1-green-tree-pittsburgh-south-pa"
  },
  {
   "id": "five-up-realty-eynon-jermyn-road-archbald-pa",
   "name": "Eynon Jermyn Road Data Center Campus (former auto salvage yard)",
   "operator": "Five Up Realty LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Archbald",
   "county": "Lackawanna",
   "state": "PA",
   "latitude": 41.509,
   "longitude": -75.535,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 86.1,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/five-up-realty-eynon-jermyn-road-archbald-pa"
  },
  {
   "id": "fairpoint-laconia-nh",
   "name": "FairPoint Laconia Data Center",
   "operator": "FairPoint Communications",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Laconia",
   "county": "Belknap",
   "state": "NH",
   "latitude": 43.5317638,
   "longitude": -71.4728722,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "elysian-partners-fairview-crossroads-fairview-township-york-pa",
   "name": "Fairview Crossroads Data Center",
   "operator": "Elysian Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Fairview Township",
   "county": "York",
   "state": "PA",
   "latitude": 40.1692628,
   "longitude": -76.8516507,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/elysian-partners-fairview-crossroads-fairview-township-york-pa"
  },
  {
   "id": "tract-farmington-technology-park-mn",
   "name": "Farmington Technology Park (Tract)",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Farmington",
   "county": "Dakota",
   "state": "MN",
   "latitude": 44.606,
   "longitude": -93.152,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 708,
   "capacity_mw_operational": null,
   "land_acres": 340,
   "investment_usd": 5000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-11",
   "record_updated": "2026-08-24",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-farmington-technology-park-mn"
  },
  {
   "id": "fbi-greywolf-pocatello-id",
   "name": "FBI Grey Wolf Data Center",
   "operator": "Federal Bureau of Investigation (U.S. Department of Justice)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Pocatello",
   "county": "Bannock",
   "state": "ID",
   "latitude": 42.90482,
   "longitude": -112.46388,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 100000000,
   "jobs_permanent": 300,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fbi-greywolf-pocatello-id"
  },
  {
   "id": "crg-festus-data-center-mo",
   "name": "Festus Data Center Campus",
   "operator": "CRG (Clayco)",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Festus",
   "county": "Jefferson",
   "state": "MO",
   "latitude": 38.2192,
   "longitude": -90.399,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 600,
   "capacity_mw_operational": null,
   "land_acres": 360,
   "investment_usd": 6000000000,
   "jobs_permanent": 200,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-03-30",
   "record_updated": "2026-08-24",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/festus-missouri-sunshine-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/crg-festus-data-center-mo"
  },
  {
   "id": "fiberhub-las1-las-vegas-nv",
   "name": "Fiberhub LAS1",
   "operator": "Fiberhub (VegasNAP, LLC)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.066019,
   "longitude": -115.138297,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-11",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fiberhub-las1-las-vegas-nv"
  },
  {
   "id": "fibernet-orem-ut",
   "name": "Fibernet Orem Data Center",
   "operator": "Fibernet",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Orem",
   "county": "Utah",
   "state": "UT",
   "latitude": 40.27619,
   "longitude": -111.67595,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fibernet-orem-ut"
  },
  {
   "id": "fiberstate-draper-ut",
   "name": "FiberState SLC1",
   "operator": "FiberState",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Draper",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.52478,
   "longitude": -111.8628,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 4,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fiberstate-draper-ut"
  },
  {
   "id": "fidium-des-moines-ia",
   "name": "Fidium Des Moines Data Center",
   "operator": "Fidium (Consolidated Communications)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Des Moines",
   "county": "Polk",
   "state": "IA",
   "latitude": 41.5868299,
   "longitude": -93.6227589,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-04",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "fnts-omaha-ne",
   "name": "First National Technology Solutions Omaha Data Center",
   "operator": "First National Technology Solutions",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Omaha",
   "county": "Douglas",
   "state": "NE",
   "latitude": 41.2614219,
   "longitude": -95.9364982,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-04",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fnts-omaha-ne"
  },
  {
   "id": "firstlight-brunswick-me",
   "name": "FirstLight Brunswick Data Center",
   "operator": "FirstLight Fiber",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Brunswick",
   "county": "Cumberland",
   "state": "ME",
   "latitude": 43.8951809,
   "longitude": -69.922964,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/firstlight-brunswick-me"
  },
  {
   "id": "firstlight-williston-vt",
   "name": "FirstLight Data Center (Williston, VT)",
   "operator": "FirstLight Fiber",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Williston",
   "county": "Chittenden",
   "state": "VT",
   "latitude": 44.4502206,
   "longitude": -73.1275724,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "firstlight-manchester-nh",
   "name": "FirstLight Manchester Data Center",
   "operator": "FirstLight Fiber",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Manchester",
   "county": "Hillsborough",
   "state": "NH",
   "latitude": 42.9720295,
   "longitude": -71.4705697,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/firstlight-manchester-nh"
  },
  {
   "id": "firstlight-portsmouth-nh-data-center-nh",
   "name": "FirstLight Portsmouth, NH Data Center",
   "operator": "FirstLight",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Portsmouth",
   "county": "Rockingham",
   "state": "NH",
   "latitude": 43.0761287,
   "longitude": -70.8080395,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/firstlight-portsmouth-nh-data-center-nh"
  },
  {
   "id": "fisk-quantum-leap-nashville-tn",
   "name": "Fisk University Quantum Leap Innovation & Technology Center",
   "operator": "Fisk University",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Nashville",
   "county": "Davidson",
   "state": "TN",
   "latitude": 36.1667902,
   "longitude": -86.7973014,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 30,
   "capacity_mw_operational": null,
   "land_acres": 5,
   "investment_usd": 400000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Nashville Electric Service",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05",
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fisk-quantum-leap-nashville-tn"
  },
  {
   "id": "fleet-data-centers-storey-county-nv",
   "name": "Fleet Data Centers Storey County Campus (South Valley & Peru Ridge)",
   "operator": "Fleet Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "McCarran",
   "county": "Storey",
   "state": "NV",
   "latitude": 39.53,
   "longitude": -119.43,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 400,
   "capacity_mw_operational": null,
   "land_acres": 769,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "NV Energy",
   "on_site_generation_mw": 362,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05",
   "record_updated": "2026-08-14",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fleet-data-centers-storey-county-nv"
  },
  {
   "id": "flexential-allentown-data-center-abe01-pa",
   "name": "Flexential Allentown Data Center (ABE01)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Allentown",
   "county": "Lehigh",
   "state": "PA",
   "latitude": 40.6356953,
   "longitude": -75.4575733,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PPL Electric",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-allentown-data-center-abe01-pa"
  },
  {
   "id": "flexential-atlanta-alpharetta-data-center-ga",
   "name": "Flexential Atlanta - Alpharetta Data Center",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Alpharetta",
   "county": "Fulton",
   "state": "GA",
   "latitude": 34.0869864,
   "longitude": -84.2518184,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-atlanta-alpharetta-data-center-ga"
  },
  {
   "id": "flexential-atlanta-douglasville-1-ga",
   "name": "Flexential Atlanta - Douglasville 1",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Douglasville",
   "county": "Douglas",
   "state": "GA",
   "latitude": 33.7310574,
   "longitude": -84.6160809,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 22.5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-atlanta-douglasville-1-ga"
  },
  {
   "id": "flexential-atlanta-douglasville-2-ga",
   "name": "Flexential Atlanta - Douglasville 2",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Douglasville",
   "county": "Douglas",
   "state": "GA",
   "latitude": 33.7307027,
   "longitude": -84.6112398,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-atlanta-douglasville-2-ga"
  },
  {
   "id": "flexential-atlanta-norcross-atl01-02-ga",
   "name": "Flexential Atlanta - Norcross (ATL01/02)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Norcross",
   "county": "Gwinnett",
   "state": "GA",
   "latitude": 33.9547396,
   "longitude": -84.1985246,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-atlanta-norcross-atl01-02-ga"
  },
  {
   "id": "flexential-charlotte-north-clt04-05-nc",
   "name": "Flexential Charlotte - North (CLT04/05)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Charlotte",
   "county": "Mecklenburg",
   "state": "NC",
   "latitude": 35.329773,
   "longitude": -80.7657588,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Duke Energy Carolinas",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-charlotte-north-clt04-05-nc"
  },
  {
   "id": "flexential-charlotte-south-clt01-02-03-nc",
   "name": "Flexential Charlotte - South (CLT01/02/03)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Charlotte",
   "county": "Mecklenburg",
   "state": "NC",
   "latitude": 35.1354147,
   "longitude": -80.9368313,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2.36,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Duke Energy Carolinas",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-charlotte-south-clt01-02-03-nc"
  },
  {
   "id": "flexential-cincinnati-cin01-02-oh",
   "name": "Flexential Cincinnati (CIN01/02)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "West Chester Township",
   "county": "Butler",
   "state": "OH",
   "latitude": 39.3159313,
   "longitude": -84.4494638,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Duke Energy Ohio",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-cincinnati-cin01-02-oh"
  },
  {
   "id": "flexential-cottonwood-heights-ut",
   "name": "Flexential Cottonwood",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Cottonwood Heights",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.61347,
   "longitude": -111.82565,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-cottonwood-heights-ut"
  },
  {
   "id": "flexential-dallas-downtown-dallas-tx",
   "name": "Flexential Dallas - Downtown Dallas",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Dallas",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.8004101,
   "longitude": -96.8193707,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-dallas-downtown-dallas-tx"
  },
  {
   "id": "flexential-dallas-plano-tx",
   "name": "Flexential Dallas - Plano",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Plano",
   "county": "Collin",
   "state": "TX",
   "latitude": 33.007033,
   "longitude": -96.6663507,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 13,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Oncor",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-dallas-plano-tx"
  },
  {
   "id": "flexential-dallas-richardson-tx",
   "name": "Flexential Dallas - Richardson",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Richardson",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.9948122,
   "longitude": -96.7524974,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-dallas-richardson-tx"
  },
  {
   "id": "flexential-denver-aurora-den03-co",
   "name": "Flexential Denver - Aurora (DEN03)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Aurora",
   "county": "Arapahoe",
   "state": "CO",
   "latitude": 39.6610488,
   "longitude": -104.8488321,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Xcel Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-denver-aurora-den03-co"
  },
  {
   "id": "flexential-denver-centennial-den05-co",
   "name": "Flexential Denver - Centennial (DEN05)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Centennial",
   "county": "Arapahoe",
   "state": "CO",
   "latitude": 39.5938733,
   "longitude": -104.8431597,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-denver-centennial-den05-co"
  },
  {
   "id": "flexential-denver-downtown-champa-co",
   "name": "Flexential Denver - Downtown (Champa)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Denver",
   "county": "Denver",
   "state": "CO",
   "latitude": 39.7459702,
   "longitude": -104.9941589,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Xcel Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-denver-downtown-champa-co"
  },
  {
   "id": "flexential-denver-englewood-co",
   "name": "Flexential Denver - Englewood",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Englewood",
   "county": "Arapahoe",
   "state": "CO",
   "latitude": 39.558994,
   "longitude": -104.8375559,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 18,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Core Electric Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-denver-englewood-co"
  },
  {
   "id": "flexential-fort-lauderdale-fll01-02-fl",
   "name": "Flexential Fort Lauderdale (FLL01/02)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Fort Lauderdale",
   "county": "Broward",
   "state": "FL",
   "latitude": 26.1900857,
   "longitude": -80.1932967,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Florida Power & Light (FPL)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-fort-lauderdale-fll01-02-fl"
  },
  {
   "id": "flexential-jacksonville-fl",
   "name": "Flexential Jacksonville",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Jacksonville",
   "county": "Duval",
   "state": "FL",
   "latitude": 30.2457482,
   "longitude": -81.5817226,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-jacksonville-fl"
  },
  {
   "id": "flexential-kaufman-county-talty-tx",
   "name": "Flexential Kaufman County Campus (Talty)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Talty",
   "county": "Kaufman",
   "state": "TX",
   "latitude": 32.689,
   "longitude": -96.3378,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 108,
   "capacity_mw_operational": null,
   "land_acres": 110,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07-28",
   "record_updated": "2026-08-25",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-kaufman-county-talty-tx"
  },
  {
   "id": "flexential-las-vegas-downtown-nv",
   "name": "Flexential Las Vegas - Downtown",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.1686438,
   "longitude": -115.1431445,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-las-vegas-downtown-nv"
  },
  {
   "id": "flexential-las-vegas-north-las04-nv",
   "name": "Flexential Las Vegas - North (LAS04)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "North Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.2481633,
   "longitude": -115.1012553,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 9,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-las-vegas-north-las04-nv"
  },
  {
   "id": "flexential-louisville-downtown-ky",
   "name": "Flexential Louisville - Downtown",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Louisville",
   "county": "Jefferson",
   "state": "KY",
   "latitude": 38.242501,
   "longitude": -85.733336,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "LG&E",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-louisville-downtown-ky"
  },
  {
   "id": "flexential-louisville-east-nas-equivalent-lou-east-ky",
   "name": "Flexential Louisville - East (NAS-equivalent LOU-East)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Louisville",
   "county": "Jefferson",
   "state": "KY",
   "latitude": 38.2771906,
   "longitude": -85.5072402,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "LG&E",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-louisville-east-nas-equivalent-lou-east-ky"
  },
  {
   "id": "flexential-minneapolis-chaska-msp01-mn",
   "name": "Flexential Minneapolis - Chaska (MSP01)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Chaska",
   "county": "Carver",
   "state": "MN",
   "latitude": 44.8516116,
   "longitude": -93.5988964,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 9,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "City of Chaska",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-minneapolis-chaska-msp01-mn"
  },
  {
   "id": "flexential-nashville-brentwood-nas01-04-tn",
   "name": "Flexential Nashville - Brentwood (NAS01/04)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Brentwood",
   "county": "Williamson",
   "state": "TN",
   "latitude": 35.9727294,
   "longitude": -86.8084949,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-nashville-brentwood-nas01-04-tn"
  },
  {
   "id": "flexential-nashville-cool-springs-tn",
   "name": "Flexential Nashville - Cool Springs",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Franklin",
   "county": "Williamson",
   "state": "TN",
   "latitude": 35.951045,
   "longitude": -86.833406,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 3.15,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Middle Tennessee Electric",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-nashville-cool-springs-tn"
  },
  {
   "id": "flexential-nashville-franklin-tn",
   "name": "Flexential Nashville - Franklin",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Franklin",
   "county": "Williamson",
   "state": "TN",
   "latitude": 35.9204203,
   "longitude": -86.8155401,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Middle Tennessee Electric",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-nashville-franklin-tn"
  },
  {
   "id": "flexential-parker-co",
   "name": "Flexential Parker (Compark)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Parker",
   "county": "Douglas",
   "state": "CO",
   "latitude": 39.5620551,
   "longitude": -104.8119323,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 22.5,
   "capacity_mw_operational": null,
   "land_acres": 17,
   "investment_usd": 205000000,
   "jobs_permanent": 16,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "CORE Electric Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-parker-co"
  },
  {
   "id": "flexential-philadelphia-collegeville-phl01-pa",
   "name": "Flexential Philadelphia - Collegeville (PHL01)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Collegeville",
   "county": "Montgomery",
   "state": "PA",
   "latitude": 40.1522366,
   "longitude": -75.4776181,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "PECO",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-philadelphia-collegeville-phl01-pa"
  },
  {
   "id": "flexential-phoenix-deer-valley-az",
   "name": "Flexential Phoenix - Deer Valley",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Phoenix",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.6846775,
   "longitude": -112.0983398,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 5.02,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-phoenix-deer-valley-az"
  },
  {
   "id": "flexential-portland-hillsboro-1-pdx01-or",
   "name": "Flexential Portland - Hillsboro 1 (PDX01)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5498253,
   "longitude": -122.8908454,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 5.3,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Portland General Electric (PGE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-portland-hillsboro-1-pdx01-or"
  },
  {
   "id": "flexential-portland-hillsboro-2-or",
   "name": "Flexential Portland - Hillsboro 2",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.558302,
   "longitude": -122.9171647,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 18,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Portland General Electric (PGE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-portland-hillsboro-2-or"
  },
  {
   "id": "flexential-portland-hillsboro-3-or",
   "name": "Flexential Portland - Hillsboro 3",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5594805,
   "longitude": -122.9382011,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 36,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Portland General Electric (PGE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-portland-hillsboro-3-or"
  },
  {
   "id": "flexential-portland-hillsboro-4-pdx04-or",
   "name": "Flexential Portland - Hillsboro 4 (PDX04)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5553133,
   "longitude": -122.9401317,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 18,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Portland General Electric (PGE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-portland-hillsboro-4-pdx04-or"
  },
  {
   "id": "flexential-portland-hillsboro-5-or",
   "name": "Flexential Portland - Hillsboro 5",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5564617,
   "longitude": -122.9394058,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 36,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-portland-hillsboro-5-or"
  },
  {
   "id": "flexential-portland-hillsboro-6-or",
   "name": "Flexential Portland - Hillsboro 6",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5472442,
   "longitude": -122.8910057,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 27,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-portland-hillsboro-6-or"
  },
  {
   "id": "flexential-raleigh-ral02-ral03-nc",
   "name": "Flexential Raleigh (RAL02/RAL03)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Morrisville",
   "county": "Wake",
   "state": "NC",
   "latitude": 35.8505281,
   "longitude": -78.8291431,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-raleigh-ral02-ral03-nc"
  },
  {
   "id": "flexential-richmond-ric01-02-va",
   "name": "Flexential Richmond (RIC01/02)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Richmond",
   "county": "Henrico",
   "state": "VA",
   "latitude": 37.6468902,
   "longitude": -77.4386952,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-richmond-ric01-02-va"
  },
  {
   "id": "flexential-salisbury-henderson-grove-nc",
   "name": "Flexential Salisbury (Henderson Grove Church Road)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Salisbury",
   "county": "Rowan",
   "state": "NC",
   "latitude": 35.6288,
   "longitude": -80.5054,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 55,
   "capacity_mw_operational": null,
   "land_acres": 95,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Duke Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-salisbury-henderson-grove-nc"
  },
  {
   "id": "flexential-salt-lake-city-downtown-ut",
   "name": "Flexential Salt Lake City - Downtown",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Salt Lake City",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.7563065,
   "longitude": -111.9548375,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2.65,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PacifiCorp",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-salt-lake-city-downtown-ut"
  },
  {
   "id": "flexential-salt-lake-city-fair-park-ut",
   "name": "Flexential Salt Lake City - Fair Park",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Salt Lake City",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.7667963,
   "longitude": -111.9202947,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PacifiCorp",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-salt-lake-city-fair-park-ut"
  },
  {
   "id": "flexential-salt-lake-city-lindon-ut",
   "name": "Flexential Salt Lake City - Lindon",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Lindon",
   "county": "Utah",
   "state": "UT",
   "latitude": 40.332648,
   "longitude": -111.7278754,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PacifiCorp",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-salt-lake-city-lindon-ut"
  },
  {
   "id": "flexential-salt-lake-city-millcreek-ut",
   "name": "Flexential Salt Lake City - Millcreek",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Salt Lake City",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.685569,
   "longitude": -111.8850505,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PacifiCorp",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-salt-lake-city-millcreek-ut"
  },
  {
   "id": "flexential-salt-lake-city-south-valley-slc09-ut",
   "name": "Flexential Salt Lake City - South Valley (SLC09)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "West Jordan",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.6203519,
   "longitude": -111.986047,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PacifiCorp",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-salt-lake-city-south-valley-slc09-ut"
  },
  {
   "id": "flexential-tampa-north-tpa03-fl",
   "name": "Flexential Tampa - North (TPA03)",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tampa",
   "county": "Hillsborough",
   "state": "FL",
   "latitude": 28.0738698,
   "longitude": -82.3683619,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-tampa-north-tpa03-fl"
  },
  {
   "id": "flexential-tampa-west-fl",
   "name": "Flexential Tampa - West",
   "operator": "Flexential",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tampa",
   "county": "Hillsborough",
   "state": "FL",
   "latitude": 28.0372991,
   "longitude": -82.5399781,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/flexential-tampa-west-fl"
  },
  {
   "id": "stonebridge-fort-meade-fl",
   "name": "Florida Ecopark AI Data Center Campus",
   "operator": "Stonebridge (via Florida Ecopark LLC; end tenant undisclosed)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Fort Meade",
   "county": "Polk",
   "state": "FL",
   "latitude": 27.7525,
   "longitude": -81.8024,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1200,
   "capacity_mw_operational": null,
   "land_acres": 200,
   "investment_usd": 2600000000,
   "jobs_permanent": 450,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Duke Energy Florida",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-03",
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stonebridge-fort-meade-fl"
  },
  {
   "id": "fluidstack-abernathy-tx",
   "name": "Fluidstack Abernathy AI Campus",
   "operator": "Fluidstack",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Abernathy",
   "county": "Hale",
   "state": "TX",
   "latitude": 33.84,
   "longitude": -101.84,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 168,
   "capacity_mw_operational": null,
   "land_acres": 120,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Xcel Energy (SPS)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fluidstack-abernathy-tx"
  },
  {
   "id": "fluidstack-okmulgee-county-ok",
   "name": "Fluidstack Okmulgee County Data Center",
   "operator": "Fluidstack",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Okmulgee",
   "county": "Okmulgee",
   "state": "OK",
   "latitude": 35.6231,
   "longitude": -95.9605,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AEP-PSO",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fluidstack-okmulgee-county-ok"
  },
  {
   "id": "fogo-data-centers-new-orleans-la",
   "name": "Fogo Data Centers New Orleans",
   "operator": "Fogo Solutions",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "New Orleans",
   "county": "Orleans",
   "state": "LA",
   "latitude": 29.9529522,
   "longitude": -90.0730531,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fogo-data-centers-new-orleans-la"
  },
  {
   "id": "fort-spunky-pacifico-energy-hood-county-tx",
   "name": "Fort Spunky",
   "operator": "Pacifico Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": null,
   "county": "Hood",
   "state": "TX",
   "latitude": 32.42,
   "longitude": -97.78,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 100,
   "capacity_mw_operational": null,
   "land_acres": 862,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fort-spunky-pacifico-energy-hood-county-tx"
  },
  {
   "id": "fortitude-aurora-ne",
   "name": "Fortitude Aurora Nebraska Facility",
   "operator": "Fortitude",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Aurora",
   "county": "Hamilton",
   "state": "NE",
   "latitude": 40.86472,
   "longitude": -98.0075,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 15,
   "capacity_mw_operational": 5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-12",
   "record_updated": "2026-08-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fortitude-aurora-ne"
  },
  {
   "id": "fortitude-grand-island-ne",
   "name": "Fortitude Grand Island Nebraska Facility",
   "operator": "Fortitude",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Grand Island",
   "county": "Hall",
   "state": "NE",
   "latitude": 40.92167,
   "longitude": -98.35861,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 12,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07-28",
   "record_updated": "2026-08-08",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "fortitude-prosser-ne",
   "name": "Fortitude Prosser Nebraska Facility",
   "operator": "Fortitude",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Prosser",
   "county": "Adams",
   "state": "NE",
   "latitude": 40.6875,
   "longitude": -98.57806,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 12.5,
   "land_acres": null,
   "investment_usd": 6250000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-01",
   "record_updated": "2026-08-08",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fortitude-prosser-ne"
  },
  {
   "id": "foundry-minden-ne",
   "name": "Foundry Digital Minden Site (former Compute North expansion)",
   "operator": "Foundry Digital",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Minden",
   "county": "Kearney",
   "state": "NE",
   "latitude": 40.5033,
   "longitude": -98.9484,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-11",
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/foundry-minden-ne"
  },
  {
   "id": "corscale-gainesville-crossing-va",
   "name": "Gainesville Crossing Digital Campus (GCDC)",
   "operator": "Corscale Data Centers (Patrinely / USAA Real Estate)",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Gainesville",
   "county": "Prince William",
   "state": "VA",
   "latitude": 38.78,
   "longitude": -77.62,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 130,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/corscale-gainesville-crossing-va"
  },
  {
   "id": "galaxy-helios-dickens-county-tx",
   "name": "Galaxy Helios Data Center Campus",
   "operator": "Galaxy Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Afton",
   "county": "Dickens",
   "state": "TX",
   "latitude": 33.72,
   "longitude": -100.84,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1630,
   "capacity_mw_operational": null,
   "land_acres": 2200,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-01",
   "record_updated": "2026-07-09",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/galaxy-helios-dickens-county-tx"
  },
  {
   "id": "gawk-enerpower-amory-ms",
   "name": "Gawk Enerpower Amory Bitcoin Mining Facility",
   "operator": "Gawk Enerpower Ltd",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Amory",
   "county": "Monroe",
   "state": "MS",
   "latitude": 33.9944791,
   "longitude": -88.5028344,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/gawk-enerpower-amory-ms"
  },
  {
   "id": "gci-anchorage-ak",
   "name": "GCI Anchorage Data Center",
   "operator": "GCI",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Anchorage",
   "county": null,
   "state": "AK",
   "latitude": 61.2163129,
   "longitude": -149.894852,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/gci-anchorage-ak"
  },
  {
   "id": "diode-ventures-gemstone-kuna-id",
   "name": "Gemstone Technology Park",
   "operator": "Diode Ventures",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Kuna",
   "county": "Ada",
   "state": "ID",
   "latitude": 43.44545,
   "longitude": -116.37335,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 620,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/diode-ventures-gemstone-kuna-id"
  },
  {
   "id": "genesis-digital-assets-anderson-sc",
   "name": "Genesis Digital Assets Anderson Bitcoin Mining Data Center",
   "operator": "Genesis Digital Assets",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Anderson",
   "county": "Anderson",
   "state": "SC",
   "latitude": 34.5068601,
   "longitude": -82.6506264,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 18,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Duke Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/genesis-digital-assets-anderson-sc"
  },
  {
   "id": "genesis-digital-assets-union-lockhart-sc",
   "name": "Genesis Digital Assets Union-Lockhart Bitcoin Mining Data Centers",
   "operator": "Genesis Digital Assets",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Lockhart",
   "county": "Union",
   "state": "SC",
   "latitude": 34.7865238,
   "longitude": -81.4620402,
   "coordinate_precision": "representative_multi_site",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 15,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/genesis-digital-assets-union-lockhart-sc"
  },
  {
   "id": "geobitmine-aberdeen-id",
   "name": "GeoBitmine Bingham County Facility",
   "operator": "GeoBitmine",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Aberdeen",
   "county": "Bingham",
   "state": "ID",
   "latitude": 42.9442,
   "longitude": -112.8383,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 6,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022",
   "record_updated": "2026-08-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/geobitmine-aberdeen-id"
  },
  {
   "id": "raeden-gibraltar-mclouth-mi",
   "name": "Gibraltar Data Center (former McLouth Steel site)",
   "operator": "Raeden (with Cal Realty / Ferragon Corp.)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Gibraltar",
   "county": "Wayne",
   "state": "MI",
   "latitude": 42.106282080203,
   "longitude": -83.196799127817,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 100,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/raeden-gibraltar-mclouth-mi"
  },
  {
   "id": "gigawatt-east-wenatchee-wa",
   "name": "Giga Watt Mining Facility (former)",
   "operator": "Giga Watt Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "East Wenatchee",
   "county": "Douglas",
   "state": "WA",
   "latitude": 47.3968,
   "longitude": -120.2042,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/gigawatt-east-wenatchee-wa"
  },
  {
   "id": "gigaland-data-centers-remington-fauquier-va",
   "name": "Gigaland Data Centers",
   "operator": "Gigaland LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Remington",
   "county": "Fauquier",
   "state": "VA",
   "latitude": 38.56070838764574,
   "longitude": -77.78314256153212,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 202.54,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/gigaland-data-centers-remington-fauquier-va"
  },
  {
   "id": "global-ai-windsor-co",
   "name": "Global AI Windsor Data Center (former Kodak/Carestream campus)",
   "operator": "Global AI",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Windsor",
   "county": "Weld",
   "state": "CO",
   "latitude": 40.4653149,
   "longitude": -104.909,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 27.5,
   "capacity_mw_operational": null,
   "land_acres": 41,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Poudre Valley Rural Electric Association",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/global-ai-windsor-co"
  },
  {
   "id": "globalinx-fastnet-cls-ocean-city-md",
   "name": "Globalinx Fastnet Cable Landing Station",
   "operator": "Globalinx (GLX)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Berlin",
   "county": "Worcester",
   "state": "MD",
   "latitude": 38.3117282,
   "longitude": -75.1228506,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 5,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/globalinx-fastnet-cls-ocean-city-md"
  },
  {
   "id": "gmi-computing-mountain-pine-ar",
   "name": "GMI Computing Mountain Pine Bitcoin Mine",
   "operator": "GMI Computing (General Mint Inc.)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Mountain Pine",
   "county": "Garland",
   "state": "AR",
   "latitude": 34.5720347,
   "longitude": -93.1732401,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/gmi-computing-mountain-pine-ar"
  },
  {
   "id": "beacon-golden-valley-ca",
   "name": "Golden Valley Technology Hub",
   "operator": "Beacon Data Centers (w/ California Resources Corp)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Elk Hills",
   "county": "Kern",
   "state": "CA",
   "latitude": 35.36,
   "longitude": -119.55,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 275,
   "capacity_mw_operational": null,
   "land_acres": 100,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Pacific Gas & Electric (PG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/beacon-golden-valley-ca"
  },
  {
   "id": "google-armstrong-county-tx",
   "name": "Goodnight Campus",
   "operator": "Google / Crusoe",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Claude",
   "county": "Armstrong",
   "state": "TX",
   "latitude": 34.973,
   "longitude": -101.367,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 933,
   "capacity_mw_operational": null,
   "land_acres": 350,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": 933,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-08-16",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-armstrong-county-tx"
  },
  {
   "id": "google-storey-county-nv",
   "name": "Google  Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": null,
   "county": "Storey",
   "state": "NV",
   "latitude": 39.4572167,
   "longitude": -119.5157991,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 600000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "other",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-14",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-storey-county-nv"
  },
  {
   "id": "google-arcola-loudoun-va",
   "name": "Google Arcola Data Center (Loudoun County)",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sterling",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 38.9432462,
   "longitude": -77.5253232,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 91,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2017",
   "record_updated": "2026-07-24",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-arcola-loudoun-va"
  },
  {
   "id": "google-moncks-corner-sc",
   "name": "Google Berkeley County Data Center (Moncks Corner)",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Moncks Corner",
   "county": "Berkeley",
   "state": "SC",
   "latitude": 33.072101,
   "longitude": -80.039105,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 1300000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "Santee Cooper (local grid); Berkeley Electric Cooperative also serves the area",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2007",
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-moncks-corner-sc"
  },
  {
   "id": "google-botetourt-greenfield-va",
   "name": "Google Botetourt Center at Greenfield Data Center Campus",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Daleville",
   "county": "Botetourt",
   "state": "VA",
   "latitude": 37.42,
   "longitude": -79.89,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 312,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": 2,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-06-24",
   "record_updated": "2026-08-27",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-botetourt-greenfield-va"
  },
  {
   "id": "google-cedar-rapids-ia",
   "name": "Google Cedar Rapids Data Center Campus",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Cedar Rapids",
   "county": "Linn",
   "state": "IA",
   "latitude": 41.936,
   "longitude": -91.723,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1391,
   "investment_usd": 576000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Alliant Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 3,
   "subsidy_usd_known": null,
   "announced_date": "2025-05",
   "record_updated": "2026-07-26",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-cedar-rapids-ia"
  },
  {
   "id": "google-council-bluffs-ia",
   "name": "Google Council Bluffs Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Council Bluffs",
   "county": "Pottawattamie",
   "state": "IA",
   "latitude": 41.167368,
   "longitude": -95.792975,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 2500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": 2.74,
   "energy_source": "wind",
   "utility": "MidAmerican Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 19800000,
   "announced_date": "2007",
   "record_updated": "2026-08-14",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-council-bluffs-ia"
  },
  {
   "id": "google-douglas-county-ga",
   "name": "Google Douglasville Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Douglasville",
   "county": "Douglas",
   "state": "GA",
   "latitude": 33.7514966,
   "longitude": -84.7477136,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-douglas-county-ga"
  },
  {
   "id": "google-eagle-mountain-ut",
   "name": "Google Eagle Mountain Site",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Eagle Mountain",
   "county": "Utah",
   "state": "UT",
   "latitude": 40.30935,
   "longitude": -112.01198,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 300,
   "investment_usd": 1200000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-eagle-mountain-ut"
  },
  {
   "id": "google-columbia-county-ga",
   "name": "Google Evans Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Evans",
   "county": "Columbia",
   "state": "GA",
   "latitude": 33.5313102,
   "longitude": -82.2563979,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-columbia-county-ga"
  },
  {
   "id": "google-fort-wayne-in",
   "name": "Google Fort Wayne Data Center (Project Zodiac)",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Fort Wayne",
   "county": "Allen",
   "state": "IN",
   "latitude": 40.99,
   "longitude": -85.056,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 700,
   "investment_usd": 2000000000,
   "jobs_permanent": 200,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Indiana Michigan Power (I&M)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2024-04",
   "record_updated": "2026-07-06",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-fort-wayne-in"
  },
  {
   "id": "google-haskell-county-tx",
   "name": "Google Haskell County Data Center Campus",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Haskell",
   "county": "Haskell",
   "state": "TX",
   "latitude": 33.1576,
   "longitude": -99.7337,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11-14",
   "record_updated": "2026-07-07",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-haskell-county-tx"
  },
  {
   "id": "google-henderson-nv",
   "name": "Google Henderson Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Henderson",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.056187,
   "longitude": -115.042545,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 64,
   "investment_usd": 600000000,
   "jobs_permanent": 50,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 25200000,
   "announced_date": "2019",
   "record_updated": "2026-07-25",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-henderson-nv"
  },
  {
   "id": "google-hermantown-mn",
   "name": "Google Hermantown Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Hermantown",
   "county": "St. Louis",
   "state": "MN",
   "latitude": 46.8068852,
   "longitude": -92.2382464,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 600,
   "capacity_mw_operational": null,
   "land_acres": 234,
   "investment_usd": 650000000,
   "jobs_permanent": 100,
   "jobs_construction": 2000,
   "cooling_type": "air_cooled",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Minnesota Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 80000000,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-hermantown-mn"
  },
  {
   "id": "google-jackson-county-stevenson-al",
   "name": "Google Jackson County Campus",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Stevenson",
   "county": "Jackson",
   "state": "AL",
   "latitude": 34.8842,
   "longitude": -85.755,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 360,
   "investment_usd": 1500000000,
   "jobs_permanent": null,
   "jobs_construction": 1000,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "North Alabama Electric Co-op",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2015-06-24",
   "record_updated": "2026-09-09",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-jackson-county-stevenson-al"
  },
  {
   "id": "google-lagrange-ga",
   "name": "Google LaGrange Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "LaGrange",
   "county": "Troup",
   "state": "GA",
   "latitude": 33.039291,
   "longitude": -85.0313269,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-lagrange-ga"
  },
  {
   "id": "google-lancaster-oh",
   "name": "Google Lancaster Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Lancaster",
   "county": "Fairfield",
   "state": "OH",
   "latitude": 39.72057,
   "longitude": -82.68839,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 120,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "South Central Power Company",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-05",
   "record_updated": "2026-07-25",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-lancaster-oh"
  },
  {
   "id": "google-lenoir-nc",
   "name": "Google Lenoir Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Lenoir",
   "county": "Caldwell",
   "state": "NC",
   "latitude": 35.900163,
   "longitude": -81.546892,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 1200000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "Duke Energy Carolinas",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2007",
   "record_updated": "2026-07-25",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-lenoir-nc"
  },
  {
   "id": "google-lincoln-ne",
   "name": "Google Lincoln Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Lincoln",
   "county": "Lancaster",
   "state": "NE",
   "latitude": 40.81,
   "longitude": -96.675,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023",
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-lincoln-ne"
  },
  {
   "id": "google-meitner-pampa-tx",
   "name": "Google Meitner Energy Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Pampa",
   "county": "Gray",
   "state": "TX",
   "latitude": 35.5365,
   "longitude": -100.9609,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-07-08",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-meitner-pampa-tx"
  },
  {
   "id": "google-michigan-city-in",
   "name": "Google Michigan City Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Michigan City",
   "county": "LaPorte",
   "state": "IN",
   "latitude": 41.7075394,
   "longitude": -86.8950297,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 70,
   "investment_usd": 832000000,
   "jobs_permanent": 30,
   "jobs_construction": 500,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-michigan-city-in"
  },
  {
   "id": "google-montgomery-county-tn",
   "name": "Google Montgomery County Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Clarksville",
   "county": "Montgomery",
   "state": "TN",
   "latitude": 36.5288,
   "longitude": -87.3636,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1300,
   "investment_usd": 600000000,
   "jobs_permanent": 70,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "TVA",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2015",
   "record_updated": "2026-09-09",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-montgomery-county-tn"
  },
  {
   "id": "google-muskogee-county-ok",
   "name": "Google Muskogee County Data Center Campuses",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Council Hill",
   "county": "Muskogee",
   "state": "OK",
   "latitude": 35.57,
   "longitude": -95.65,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "OG&E",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-07-06",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-muskogee-county-ok"
  },
  {
   "id": "google-nebraska-ai-campus-proposed",
   "name": "Google Nebraska AI Campus (proposed)",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": null,
   "county": "Otoe",
   "state": "NE",
   "latitude": 40.474,
   "longitude": -96.371,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-03",
   "record_updated": "2026-08-16",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-nebraska-ai-campus-proposed"
  },
  {
   "id": "google-new-albany-oh",
   "name": "Google New Albany Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "New Albany",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.05832,
   "longitude": -82.77106,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 447,
   "investment_usd": 600000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-new-albany-oh"
  },
  {
   "id": "google-omaha-ne",
   "name": "Google Omaha Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Omaha",
   "county": "Douglas",
   "state": "NE",
   "latitude": 41.334,
   "longitude": -96.145,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 270,
   "investment_usd": 750000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022",
   "record_updated": "2026-08-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-omaha-ne"
  },
  {
   "id": "google-palo-ia",
   "name": "Google Palo Data Center Campus",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Palo",
   "county": "Linn",
   "state": "IA",
   "latitude": 42.0611,
   "longitude": -91.7935,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": 12,
   "energy_source": "nuclear",
   "utility": "NextEra Energy (Duane Arnold Energy Center)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10-06",
   "record_updated": "2026-08-14",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-palo-ia"
  },
  {
   "id": "google-papillion-ne",
   "name": "Google Papillion Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Papillion",
   "county": "Sarpy",
   "state": "NE",
   "latitude": 41.13257,
   "longitude": -96.143728,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 275,
   "investment_usd": 600000000,
   "jobs_permanent": 30,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "Omaha Public Power District (OPPD)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2019",
   "record_updated": "2026-08-14",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-papillion-ne"
  },
  {
   "id": "google-bosc-lima-oh",
   "name": "Google Project BOSC (Lima)",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Lima",
   "county": "Allen",
   "state": "OH",
   "latitude": 40.744,
   "longitude": -84.1052,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 170,
   "investment_usd": 500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AEP Ohio",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-03-16",
   "record_updated": "2026-07-23",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-bosc-lima-oh"
  },
  {
   "id": "google-project-helium-barber-county-ks",
   "name": "Google Project Helium (Barber County)",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Sharon",
   "county": "Barber",
   "state": "KS",
   "latitude": 37.2503,
   "longitude": -98.4176,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 900,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air_cooled",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-03",
   "source_count": 7,
   "record_origin": "suedatacenters",
   "case_files": "https://suedatacenters.org/lawsuits/barber-county-google-project-helium-development-agreement",
   "profile_url": "https://suedatacenters.org/data-centers/google-project-helium-barber-county-ks"
  },
  {
   "id": "google-loch-midlothian-va",
   "name": "Google Project Loch",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Midlothian",
   "county": "Chesterfield",
   "state": "VA",
   "latitude": 37.454,
   "longitude": -77.71,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 340,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-08-28",
   "record_updated": "2026-08-27",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-loch-midlothian-va"
  },
  {
   "id": "google-project-louie-monrovia-in",
   "name": "Google Project Louie (Morgan County)",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Monrovia",
   "county": "Morgan",
   "state": "IN",
   "latitude": 39.57,
   "longitude": -86.35,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 390,
   "capacity_mw_operational": null,
   "land_acres": 550,
   "investment_usd": 1000000000,
   "jobs_permanent": 100,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AES Indiana",
   "on_site_generation_mw": null,
   "subsidy_programs": 3,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-08-05",
   "source_count": 12,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-project-louie-monrovia-in"
  },
  {
   "id": "google-project-mica-kc-northland-mo",
   "name": "Google Project Mica",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Kansas City",
   "county": "Clay",
   "state": "MO",
   "latitude": 39.274,
   "longitude": -94.651,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": 493,
   "investment_usd": 10000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Evergy",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2026-02",
   "record_updated": "2026-08-24",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-project-mica-kc-northland-mo"
  },
  {
   "id": "google-skyway-pine-island-mn",
   "name": "Google Project Skyway (Pine Island)",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Pine Island",
   "county": "Goodhue",
   "state": "MN",
   "latitude": 44.2019,
   "longitude": -92.6496,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Xcel Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-02",
   "record_updated": "2026-07-07",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-skyway-pine-island-mn"
  },
  {
   "id": "google-spade-new-florence-mo",
   "name": "Google Project Spade Campus",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "New Florence",
   "county": "Montgomery",
   "state": "MO",
   "latitude": 38.791,
   "longitude": -91.508,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1200,
   "capacity_mw_operational": null,
   "land_acres": 934,
   "investment_usd": 15000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Ameren Missouri",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-01",
   "record_updated": "2026-07-25",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-spade-new-florence-mo"
  },
  {
   "id": "google-pryor-ok",
   "name": "Google Pryor Data Center Campus (Mayes County Expansion)",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Pryor",
   "county": "Mayes",
   "state": "OK",
   "latitude": 36.32,
   "longitude": -95.31,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 4400000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": 3,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 45900000,
   "announced_date": "2007-01",
   "record_updated": "2026-07-06",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-pryor-ok"
  },
  {
   "id": "google-putnam-county-campus-wv",
   "name": "Google Putnam County Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Buffalo",
   "county": "Putnam",
   "state": "WV",
   "latitude": 38.64411,
   "longitude": -81.956511,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1700,
   "investment_usd": 7000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Appalachian Power (AEP)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-03-27",
   "record_updated": "2026-09-10",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-putnam-county-campus-wv"
  },
  {
   "id": "google-red-oak-tx",
   "name": "Google Red Oak Campus",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Red Oak",
   "county": "Ellis",
   "state": "TX",
   "latitude": 32.5163,
   "longitude": -96.8011,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 166,
   "investment_usd": 330000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2023-09",
   "record_updated": "2026-07-07",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-red-oak-tx"
  },
  {
   "id": "google-redhawk-mesa-az",
   "name": "Google Redhawk Mesa Data Center Campus",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Mesa",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.3764,
   "longitude": -111.6199,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 400,
   "capacity_mw_operational": null,
   "land_acres": 187,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "Salt River Project (SRP)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2019-01",
   "record_updated": "2026-08-31",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-redhawk-mesa-az"
  },
  {
   "id": "google-ridgeville-sc",
   "name": "Google Ridgeville Data Center (Project Dawson)",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Ridgeville",
   "county": "Dorchester",
   "state": "SC",
   "latitude": 33.096,
   "longitude": -80.3239,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 231,
   "investment_usd": 510000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2024-09",
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-ridgeville-sc"
  },
  {
   "id": "google-stillwater-ok",
   "name": "Google Stillwater Data Center Campus",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Stillwater",
   "county": "Payne",
   "state": "OK",
   "latitude": 36.14,
   "longitude": -97.06,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 400,
   "investment_usd": 3000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": 2.7,
   "energy_source": "grid",
   "utility": "OG&E",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-03",
   "record_updated": "2026-07-21",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-stillwater-ok"
  },
  {
   "id": "google-the-dalles-or",
   "name": "Google The Dalles Data Center Campus",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "The Dalles",
   "county": "Wasco",
   "state": "OR",
   "latitude": 45.5975,
   "longitude": -121.1776,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 300,
   "land_acres": null,
   "investment_usd": 1800000000,
   "jobs_permanent": 200,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": 1.51,
   "energy_source": "hydro",
   "utility": "Northern Wasco County PUD",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2005",
   "record_updated": "2026-09-05",
   "source_count": 14,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/the-dalles-google-water-records-case",
   "profile_url": "https://suedatacenters.org/data-centers/google-the-dalles-or"
  },
  {
   "id": "google-the-dalles-port-river-road-or",
   "name": "Google The Dalles Data Center, 3500 River Road (Port of The Dalles)",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "The Dalles",
   "county": "Wasco",
   "state": "OR",
   "latitude": 45.62539,
   "longitude": -121.20239,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 600000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-the-dalles-port-river-road-or"
  },
  {
   "id": "google-west-memphis-ar",
   "name": "Google West Memphis Data Center Campus",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "West Memphis",
   "county": "Crittenden",
   "state": "AR",
   "latitude": 35.156,
   "longitude": -90.175,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1178,
   "investment_usd": 4000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-07-06",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-west-memphis-ar"
  },
  {
   "id": "google-wilbarger-vernon-tx",
   "name": "Google Wilbarger County Campus",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Vernon",
   "county": "Wilbarger",
   "state": "TX",
   "latitude": 34.1551,
   "longitude": -99.294,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-07-07",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-wilbarger-vernon-tx"
  },
  {
   "id": "google-winding-woods-st-george-sc",
   "name": "Google Winding Woods Campus",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "St. George",
   "county": "Dorchester",
   "state": "SC",
   "latitude": 33.1843,
   "longitude": -80.5793,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 206,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-winding-woods-st-george-sc"
  },
  {
   "id": "gouldsboro-project-gold-clifton-covington-lackawanna-pa",
   "name": "Gouldsboro Data Center Campus (Project Gold)",
   "operator": "1778 Rich Pike LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Clifton Township",
   "county": "Lackawanna",
   "state": "PA",
   "latitude": 41.195,
   "longitude": -75.595,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-17",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/gouldsboro-project-gold-clifton-covington-lackawanna-pa"
  },
  {
   "id": "raeden-grand-crossing-south-city-of-industry-ca",
   "name": "Grand Crossing South - Building 10",
   "operator": "Raeden",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "City of Industry",
   "county": "Los Angeles",
   "state": "CA",
   "latitude": 34.0051077,
   "longitude": -117.8333142,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/raeden-grand-crossing-south-city-of-industry-ca"
  },
  {
   "id": "grand-river-power-hamlin-township-mi",
   "name": "Grand River Power Company Smithville Bitcoin Mine",
   "operator": "Grand River Power Company",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Eaton Rapids",
   "county": "Eaton",
   "state": "MI",
   "latitude": 42.4996675,
   "longitude": -84.6291791,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "City of Eaton Rapids",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/grand-river-power-hamlin-township-mi"
  },
  {
   "id": "granite-renewables-logan-county-co",
   "name": "Granite Renewables Logan County Data Center Campus",
   "operator": "Granite Renewables",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Sterling",
   "county": "Logan",
   "state": "CO",
   "latitude": 40.6255415,
   "longitude": -103.207709,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 2000,
   "capacity_mw_operational": null,
   "land_acres": 4000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/granite-renewables-logan-county-co"
  },
  {
   "id": "green-data-socorro-county-nm",
   "name": "Green Data Socorro Campus",
   "operator": "Green Data (Green Data Centers)",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Socorro",
   "county": "Socorro",
   "state": "NM",
   "latitude": 34.0584,
   "longitude": -106.8914,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 2000,
   "capacity_mw_operational": null,
   "land_acres": 10000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": null,
   "on_site_generation_mw": 10000,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-08-08",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/green-data-socorro-county-nm"
  },
  {
   "id": "green-data-spaceport-america-sierra-county-nm",
   "name": "Green Data Spaceport America Data Center",
   "operator": "Green Data / Aetherion Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": null,
   "county": "Sierra",
   "state": "NM",
   "latitude": 32.9903,
   "longitude": -106.9698,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 5,
   "capacity_mw_operational": null,
   "land_acres": 21,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07",
   "record_updated": "2026-09-10",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/green-data-spaceport-america-sierra-county-nm"
  },
  {
   "id": "green-digital-harrison-ar",
   "name": "Green Digital Harrison Mine (proposed, withdrawn)",
   "operator": "Green Digital LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Harrison",
   "county": "Boone",
   "state": "AR",
   "latitude": 36.2298,
   "longitude": -93.1077,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023",
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/green-digital-harrison-ar"
  },
  {
   "id": "greenidge-generation-dresden-ny",
   "name": "Greenidge Generation",
   "operator": "Greenidge Generation",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Dresden",
   "county": "Yates",
   "state": "NY",
   "latitude": 42.679134,
   "longitude": -76.948604,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 106,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/greenidge-generation-dresden-ny"
  },
  {
   "id": "greenidge-spartanburg-sc",
   "name": "Greenidge Spartanburg (South Carolina)",
   "operator": "Greenidge Generation",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Spartanburg",
   "county": "Spartanburg",
   "state": "SC",
   "latitude": 34.9494,
   "longitude": -81.925,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 100,
   "capacity_mw_operational": null,
   "land_acres": 175,
   "investment_usd": 264000000,
   "jobs_permanent": 40,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-01-25",
   "record_updated": "2026-09-10",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/greenidge-spartanburg-sc"
  },
  {
   "id": "greenidge-underwood-nd",
   "name": "Greenidge Underwood (North Dakota)",
   "operator": "Greenidge Generation",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Underwood",
   "county": "McLean",
   "state": "ND",
   "latitude": 47.4564,
   "longitude": -101.1371,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 7.5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-03-11",
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/greenidge-underwood-nd"
  },
  {
   "id": "jk-land-greenlin-park-leesburg-va",
   "name": "Greenlin Park",
   "operator": "JK Land Holdings",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Leesburg",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.064,
   "longitude": -77.524,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 83,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-07",
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/jk-land-greenlin-park-leesburg-va"
  },
  {
   "id": "gta-gu3-alupang-tamuning-gu",
   "name": "GTA Alupang Data Center (GU3)",
   "operator": "GTA (Teleguam Holdings LLC)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Tamuning",
   "county": null,
   "state": "GU",
   "latitude": 13.4961094,
   "longitude": 144.7745311,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 4,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "gta-gu1-gu2-piti-gu",
   "name": "GTA Guam Data Center (GU1/GU2)",
   "operator": "GTA (Teleguam Holdings LLC)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Piti",
   "county": null,
   "state": "GU",
   "latitude": 13.4672901,
   "longitude": 144.6991934,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "gw-ranch-pacifico-energy-pecos-county-tx",
   "name": "GW Ranch",
   "operator": "Pacifico Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "rumored",
   "city": null,
   "county": "Pecos",
   "state": "TX",
   "latitude": 31.05,
   "longitude": -102.88,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 7650,
   "capacity_mw_operational": null,
   "land_acres": 8000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": 7650,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/gw-ranch-pacifico-energy-pecos-county-tx"
  },
  {
   "id": "h5-data-centers-albuquerque-nm",
   "name": "H5 Data Centers Albuquerque",
   "operator": "H5 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Albuquerque",
   "county": "Bernalillo",
   "state": "NM",
   "latitude": 35.0862,
   "longitude": -106.6512,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-03",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/h5-data-centers-albuquerque-nm"
  },
  {
   "id": "h5-buffalo-i-lockport-ny",
   "name": "H5 Data Centers Buffalo I (formerly Yahoo Lockport)",
   "operator": "H5 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Lockport",
   "county": "Niagara",
   "state": "NY",
   "latitude": 43.16879237433895,
   "longitude": -78.7516290070774,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 15,
   "land_acres": 43,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": "National Grid",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 478000000,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/h5-buffalo-i-lockport-ny"
  },
  {
   "id": "h5-buffalo-ii-lockport-ny",
   "name": "H5 Data Centers Buffalo II",
   "operator": "H5 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Lockport",
   "county": "Niagara",
   "state": "NY",
   "latitude": 43.16967580851366,
   "longitude": -78.74808845761379,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 7.2,
   "land_acres": null,
   "investment_usd": 170000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": "National Grid",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/h5-buffalo-ii-lockport-ny"
  },
  {
   "id": "h5-data-centers-cincinnati-gest-oh",
   "name": "H5 Data Centers Cincinnati I",
   "operator": "H5 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Cincinnati",
   "county": "Hamilton",
   "state": "OH",
   "latitude": 39.0981558,
   "longitude": -84.5261021,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Duke Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/h5-data-centers-cincinnati-gest-oh"
  },
  {
   "id": "h5-data-centers-cleveland-rockwell-oh",
   "name": "H5 Data Centers Cleveland",
   "operator": "H5 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Cleveland",
   "county": "Cuyahoga",
   "state": "OH",
   "latitude": 41.5063269,
   "longitude": -81.683262,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/h5-data-centers-cleveland-rockwell-oh"
  },
  {
   "id": "h5-denver-greenwood-village-co",
   "name": "H5 Data Centers Denver (Denver Tech Center campus)",
   "operator": "H5 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Greenwood Village",
   "county": "Arapahoe",
   "state": "CO",
   "latitude": 39.6167549,
   "longitude": -104.8916814,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 17.5,
   "land_acres": 12,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Xcel Energy",
   "on_site_generation_mw": 0.4,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/h5-denver-greenwood-village-co"
  },
  {
   "id": "h5-la-vista-ne",
   "name": "H5 Data Centers Omaha (La Vista)",
   "operator": "H5 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "La Vista",
   "county": "Sarpy",
   "state": "NE",
   "latitude": 41.166,
   "longitude": -96.075,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 17.3,
   "land_acres": 32,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-14",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/h5-la-vista-ne"
  },
  {
   "id": "h5-data-centers-chandler-az",
   "name": "H5 Data Centers Phoenix (Chandler)",
   "operator": "H5 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Chandler",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.2769786,
   "longitude": -111.8860302,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 26,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "h5-data-centers-portland-or",
   "name": "H5 Data Centers Portland",
   "operator": "H5 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Portland",
   "county": "Multnomah",
   "state": "OR",
   "latitude": 45.5318147,
   "longitude": -122.6839805,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "h5-data-centers-quincy-campus-wa",
   "name": "H5 Data Centers Quincy Campus",
   "operator": "H5 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Quincy",
   "county": "Grant",
   "state": "WA",
   "latitude": 47.2334,
   "longitude": -119.8528,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 40,
   "capacity_mw_operational": null,
   "land_acres": 63,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/h5-data-centers-quincy-campus-wa"
  },
  {
   "id": "h5-data-centers-seattle-denny-way-wa",
   "name": "H5 Data Centers Seattle",
   "operator": "H5 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Seattle",
   "county": "King",
   "state": "WA",
   "latitude": 47.6205,
   "longitude": -122.3379,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-22",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "h5-data-centers-st-paul-mn",
   "name": "H5 Data Centers St. Paul",
   "operator": "H5 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "St. Paul",
   "county": "Ramsey",
   "state": "MN",
   "latitude": 44.974,
   "longitude": -93.167,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "h6-coin-newcastle-wy",
   "name": "H6 Coin Newcastle Bitcoin Mining Facility",
   "operator": "H6 Coin LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Newcastle",
   "county": "Weston",
   "state": "WY",
   "latitude": 43.85,
   "longitude": -104.2,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/h6-coin-newcastle-wy"
  },
  {
   "id": "logistix-hamilton-innovation-center-butler-county-oh",
   "name": "Hamilton Innovation Center",
   "operator": "Logistix Property Group",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Hamilton",
   "county": "Butler",
   "state": "OH",
   "latitude": 39.3995,
   "longitude": -84.5613,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 29.2,
   "investment_usd": 1000000000,
   "jobs_permanent": 100,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-11",
   "record_updated": "2026-08-02",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/logistix-hamilton-innovation-center-butler-county-oh"
  },
  {
   "id": "surge-hancock-county-megasite-buck-creek-township-in",
   "name": "Hancock County MegaSite",
   "operator": "Surge Development LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": null,
   "county": "Hancock",
   "state": "IN",
   "latitude": 39.82722,
   "longitude": -85.89833,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 775,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/surge-hancock-county-megasite-buck-creek-township-in"
  },
  {
   "id": "strata-hanging-rock-haverhill-data-center-oh",
   "name": "Hanging Rock / Haverhill Data Center",
   "operator": "Strata Expense (backed by Supermicro + Ravel)",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Hanging Rock",
   "county": "Lawrence",
   "state": "OH",
   "latitude": 38.567639,
   "longitude": -82.781751,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 40,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/strata-hanging-rock-haverhill-data-center-oh"
  },
  {
   "id": "tract-hanover-technology-park-va",
   "name": "Hanover Technology Park",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": null,
   "county": "Hanover",
   "state": "VA",
   "latitude": 37.81,
   "longitude": -77.47,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 2400,
   "capacity_mw_operational": null,
   "land_acres": 1211,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-hanover-technology-park-va"
  },
  {
   "id": "hanton-city-smithfield-ri",
   "name": "Hanton City Business Park (data center anchor)",
   "operator": "Hanton City Investments LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Smithfield",
   "county": "Providence",
   "state": "RI",
   "latitude": 41.867,
   "longitude": -71.527,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Rhode Island Energy (Narragansett)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05",
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hanton-city-smithfield-ri"
  },
  {
   "id": "maguire-hayden-harrington-de",
   "name": "Harrington Data Center Proposal (Maguire Hayden)",
   "operator": "Maguire Hayden",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Harrington",
   "county": "Kent",
   "state": "DE",
   "latitude": 38.9237244,
   "longitude": -75.5777033,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 24,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/maguire-hayden-harrington-de"
  },
  {
   "id": "cipher-digital-hashworks-waterford-washington-oh",
   "name": "HashWorks Powered Land, Waterford Site",
   "operator": "HashWorks Powered Land Waterford LLC (land entity tied to Cipher Digital / Sabre 56)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "rumored",
   "city": null,
   "county": "Washington",
   "state": "OH",
   "latitude": 39.55139,
   "longitude": -81.64944,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": null,
   "land_acres": 500,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cipher-digital-hashworks-waterford-washington-oh"
  },
  {
   "id": "arizona-land-consulting-hassayampa-ranch-tonopah-az",
   "name": "Hassayampa Ranch Data Center",
   "operator": "Arizona Land Consulting",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Tonopah",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.511576,
   "longitude": -112.769387,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1500,
   "capacity_mw_operational": null,
   "land_acres": 2000,
   "investment_usd": 25000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-12",
   "record_updated": "2026-09-10",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/arizona-land-consulting-hassayampa-ranch-tonopah-az"
  },
  {
   "id": "heartland-industrial-park-sullivan-county-in",
   "name": "Heartland Industrial Park (Fluidstack Sullivan County Campus)",
   "operator": "Fluidstack",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Merom",
   "county": "Sullivan",
   "state": "IN",
   "latitude": 39.0694,
   "longitude": -87.5108,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 2100,
   "capacity_mw_operational": null,
   "land_acres": 1000,
   "investment_usd": 65000000000,
   "jobs_permanent": 500,
   "jobs_construction": 2750,
   "cooling_type": "closed_loop",
   "water_reported_mgd": 0.06,
   "energy_source": "grid",
   "utility": "WIN Energy REMC",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-04-08",
   "record_updated": "2026-09-01",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/heartland-industrial-park-sullivan-county-in"
  },
  {
   "id": "galaxy-helios-dickens-tx",
   "name": "Helios (Galaxy Digital / CoreWeave)",
   "operator": "Galaxy Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Afton",
   "county": "Dickens",
   "state": "TX",
   "latitude": 33.7814083,
   "longitude": -100.8790507,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 800,
   "capacity_mw_operational": 200,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-03",
   "record_updated": "2026-07-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/galaxy-helios-dickens-tx"
  },
  {
   "id": "hematite-bitcoin-mining-jefferson-county-mo",
   "name": "Hematite Bitcoin Mining Facility",
   "operator": "NYDIG / Global Connect Communications",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hematite",
   "county": "Jefferson",
   "state": "MO",
   "latitude": 38.126,
   "longitude": -90.508,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hematite-bitcoin-mining-jefferson-county-mo"
  },
  {
   "id": "montana-property-group-high-falls-road-spalding-ga",
   "name": "High Falls Road Data Center Campus (Montana Property Group)",
   "operator": "Montana Property Group LLC (developer; end user undisclosed)",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Griffin",
   "county": "Spalding",
   "state": "GA",
   "latitude": 33.2468,
   "longitude": -84.2641,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 132.9,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-28",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/montana-property-group-high-falls-road-spalding-ga"
  },
  {
   "id": "highwire-evansville-wy",
   "name": "Highwire Energy Partners Bitcoin Mining Facility (Evansville)",
   "operator": "Highwire Energy Partners",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Evansville",
   "county": "Natrona",
   "state": "WY",
   "latitude": 42.8508,
   "longitude": -106.2735,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022",
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/highwire-evansville-wy"
  },
  {
   "id": "hixson-data-center-mcminnville-tn",
   "name": "Hixson Data Center (McMinnville)",
   "operator": "Hixson Data Center",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "McMinnville",
   "county": "Warren",
   "state": "TN",
   "latitude": 35.6834,
   "longitude": -85.76998,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 25,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": 30,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hixson-data-center-mcminnville-tn"
  },
  {
   "id": "hog-lick-aggregates-white-hall-marion-wv",
   "name": "Hog Lick Aggregates Data Center / Microgrid Proposal",
   "operator": "Hog Lick Aggregates",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "White Hall",
   "county": "Marion",
   "state": "WV",
   "latitude": 39.4211977,
   "longitude": -80.1825815,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 277,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hog-lick-aggregates-white-hall-marion-wv"
  },
  {
   "id": "deltona-holder-industrial-park-citrus-county-fl",
   "name": "Holder Industrial Park Data Center Expansion (withdrawn)",
   "operator": "Deltona Corporation",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Lecanto",
   "county": "Citrus",
   "state": "FL",
   "latitude": 28.86722,
   "longitude": -82.49444,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/deltona-holder-industrial-park-citrus-county-fl"
  },
  {
   "id": "homer-city-energy-campus-pa",
   "name": "Homer City Energy Campus",
   "operator": "Homer City Redevelopment",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Homer City",
   "county": "Indiana",
   "state": "PA",
   "latitude": 40.5383,
   "longitude": -79.1542,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 4500,
   "capacity_mw_operational": null,
   "land_acres": 3200,
   "investment_usd": 10000000000,
   "jobs_permanent": 1000,
   "jobs_construction": 10000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "PJM (via FirstEnergy Pennsylvania Electric)",
   "on_site_generation_mw": 4500,
   "subsidy_programs": 1,
   "subsidy_usd_known": 5000000,
   "announced_date": "2025-04-02",
   "record_updated": "2026-09-12",
   "source_count": 11,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/homer-city-energy-campus-pa"
  },
  {
   "id": "honda-longmont-co",
   "name": "Honda Data Center (1601 Dry Creek Drive)",
   "operator": "Honda",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Longmont",
   "county": "Boulder",
   "state": "CO",
   "latitude": 40.139512,
   "longitude": -105.1361216,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 1.6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "host-digital-northeast-oklahoma-ok",
   "name": "Host Digital Northeast Oklahoma Data Center",
   "operator": "Host Digital Infrastructure LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tulsa",
   "county": null,
   "state": "OK",
   "latitude": 36.154,
   "longitude": -95.9928,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 43,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-08-31",
   "record_updated": "2026-09-02",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/host-digital-northeast-oklahoma-ok"
  },
  {
   "id": "hostdime-eatonville-fl",
   "name": "HostDime Orlando Tier IV Data Center",
   "operator": "HostDime",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Eatonville",
   "county": "Orange",
   "state": "FL",
   "latitude": 28.6106,
   "longitude": -81.3806,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hostdime-eatonville-fl"
  },
  {
   "id": "stantec-randee-howell-township-mi",
   "name": "Howell Township Hyperscale Data Center",
   "operator": "Stantec Consulting Michigan / Randee LLC",
   "company": "alliance-cloud-services",
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Howell",
   "county": "Livingston",
   "state": "MI",
   "latitude": 42.6317633,
   "longitude": -83.9932682,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1077,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stantec-randee-howell-township-mi"
  },
  {
   "id": "hub787-carolina-pr",
   "name": "HUB787",
   "operator": "HUB Advanced Networks",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Carolina",
   "county": null,
   "state": "PR",
   "latitude": 18.442021,
   "longitude": -66.021669,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "hunters-ridge-south-data-center-campus-spotsylvania-va",
   "name": "Hunters Ridge South Data Center Campus",
   "operator": "American Real Estate Partners (AREP)",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Spotsylvania",
   "county": "Spotsylvania",
   "state": "VA",
   "latitude": 38.213,
   "longitude": -77.482,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 73,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hunters-ridge-south-data-center-campus-spotsylvania-va"
  },
  {
   "id": "hhhunt-hunting-hawk-technology-park-hanover-va",
   "name": "Hunting Hawk Technology Park",
   "operator": "HHHunt",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Glen Allen",
   "county": "Hanover",
   "state": "VA",
   "latitude": 37.657,
   "longitude": -77.626,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 900,
   "capacity_mw_operational": null,
   "land_acres": 468,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hhhunt-hunting-hawk-technology-park-hanover-va"
  },
  {
   "id": "hut8-batavia-il",
   "name": "Hut 8 Batavia Data Center",
   "operator": "Batavia DC Corp (Hut 8 Corp subsidiary)",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Batavia",
   "county": "Kane",
   "state": "IL",
   "latitude": 41.859,
   "longitude": -88.275,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": 7.2,
   "investment_usd": 500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-03",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hut8-batavia-il"
  },
  {
   "id": "hut8-beacon-point-robstown-tx",
   "name": "Hut 8 Beacon Point AI Campus",
   "operator": "Hut 8",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Robstown",
   "county": "Nueces",
   "state": "TX",
   "latitude": 27.7897,
   "longitude": -97.6689,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 352,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 4250000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AEP Texas",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05",
   "record_updated": "2026-07-08",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hut8-beacon-point-robstown-tx"
  },
  {
   "id": "hut8-river-bend-west-feliciana-la",
   "name": "Hut 8 River Bend AI Data Center Campus",
   "operator": "Hut 8",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "St. Francisville",
   "county": "West Feliciana",
   "state": "LA",
   "latitude": 30.79,
   "longitude": -91.38,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 330,
   "capacity_mw_operational": null,
   "land_acres": 611,
   "investment_usd": 10000000000,
   "jobs_permanent": 75,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Entergy Louisiana",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2025-01",
   "record_updated": "2026-08-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hut8-river-bend-west-feliciana-la"
  },
  {
   "id": "hut8-salt-creek-culberson-tx",
   "name": "Hut 8 Salt Creek Facility",
   "operator": "American Bitcoin (Hut 8)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": null,
   "county": "Culberson",
   "state": "TX",
   "latitude": 31.825,
   "longitude": -103.909,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 63,
   "land_acres": 1.9,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-03",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hut8-salt-creek-culberson-tx"
  },
  {
   "id": "hut8-vega-amarillo-tx",
   "name": "Hut 8 Vega Facility",
   "operator": "American Bitcoin (Hut 8)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Amarillo",
   "county": "Potter",
   "state": "TX",
   "latitude": 35.207,
   "longitude": -101.834,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 205,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hut8-vega-amarillo-tx"
  },
  {
   "id": "hydravault-chicago-il",
   "name": "HydraVault Chicago",
   "operator": "HydraVault",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Chicago",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.846546,
   "longitude": -87.6254598,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 20,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 16875000,
   "announced_date": "2025-10-28",
   "record_updated": "2026-08-31",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hydravault-chicago-il"
  },
  {
   "id": "hyperdatagrid-lufkin-angelina-county-tx",
   "name": "HyperDataGrid Lufkin Data Center (Former Timber Mill Site)",
   "operator": "HyperDataGrid",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Lufkin",
   "county": "Angelina",
   "state": "TX",
   "latitude": 31.3383,
   "longitude": -94.7292,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 20,
   "capacity_mw_operational": null,
   "land_acres": 40,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-08",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hyperdatagrid-lufkin-angelina-county-tx"
  },
  {
   "id": "hyperscale-data-dowagiac-mi",
   "name": "Hyperscale Data Dowagiac Campus",
   "operator": "Hyperscale Data, Inc.",
   "company": "alliance-cloud-services",
   "facility_type": "crypto_mining",
   "status": "under_construction",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Dowagiac",
   "county": "Cass",
   "state": "MI",
   "latitude": 41.984,
   "longitude": -86.109,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 340,
   "capacity_mw_operational": 30,
   "land_acres": 83,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/dowagiac-alliance-cloud-noise-class-action",
   "profile_url": "https://suedatacenters.org/data-centers/hyperscale-data-dowagiac-mi"
  },
  {
   "id": "inl-c3-idahofalls-id",
   "name": "Idaho National Laboratory Collaborative Computing Center (C3)",
   "operator": "Idaho National Laboratory (U.S. Department of Energy)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Idaho Falls",
   "county": "Bonneville",
   "state": "ID",
   "latitude": 43.4666,
   "longitude": -112.0341,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/inl-c3-idahofalls-id"
  },
  {
   "id": "immersionbtc-walnut-ridge-ar",
   "name": "ImmersionBTC Walnut Ridge Mine",
   "operator": "ImmersionBTC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Walnut Ridge",
   "county": "Lawrence",
   "state": "AR",
   "latitude": 36.0684,
   "longitude": -90.9526,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2019",
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/immersionbtc-walnut-ridge-ar"
  },
  {
   "id": "impactdata-greensboro-nc",
   "name": "ImpactData Greensboro",
   "operator": "ImpactData",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Greensboro",
   "county": "Guilford",
   "state": "NC",
   "latitude": 36.0726,
   "longitude": -79.792,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 20,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-07",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/impactdata-greensboro-nc"
  },
  {
   "id": "ivcm-imperial-county-ca",
   "name": "Imperial Valley Computer Manufacturing AI Data Center",
   "operator": "Imperial Valley Computer Manufacturing (IVCM)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Imperial",
   "county": "Imperial",
   "state": "CA",
   "latitude": 32.847,
   "longitude": -115.569,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 330,
   "capacity_mw_operational": null,
   "land_acres": 75,
   "investment_usd": null,
   "jobs_permanent": 100,
   "jobs_construction": 1700,
   "cooling_type": "evaporative",
   "water_reported_mgd": 0.75,
   "energy_source": "grid",
   "utility": "Imperial Irrigation District (IID)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-06",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/imperial-valley-data-center-water-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/ivcm-imperial-county-ca"
  },
  {
   "id": "infobunker-boone-ia",
   "name": "InfoBunker Underground Data Center",
   "operator": "InfoBunker, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Boone",
   "county": "Boone",
   "state": "IA",
   "latitude": 42.16522,
   "longitude": -93.79436,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-04",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/infobunker-boone-ia"
  },
  {
   "id": "interstate-holdings-blockchain-cabot-ar",
   "name": "Interstate Holdings Blockchain Cabot Mine",
   "operator": "Interstate Holdings Blockchain",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Cabot",
   "county": "Lonoke",
   "state": "AR",
   "latitude": 34.9748,
   "longitude": -92.0179,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/interstate-holdings-blockchain-cabot-ar"
  },
  {
   "id": "interstate-holdings-blockchain-vilonia-ar",
   "name": "Interstate Holdings Blockchain Vilonia Mine (proposed, denied)",
   "operator": "Interstate Holdings Blockchain",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Vilonia",
   "county": "Faulkner",
   "state": "AR",
   "latitude": 35.1073,
   "longitude": -92.2071,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/interstate-holdings-blockchain-vilonia-ar"
  },
  {
   "id": "iren-horizon-childress-tx",
   "name": "IREN Horizon, Childress, TX",
   "operator": "IREN (Iris Energy)",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Childress",
   "county": "Childress",
   "state": "TX",
   "latitude": 34.4276,
   "longitude": -100.2046,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 750,
   "capacity_mw_operational": null,
   "land_acres": 576,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "ERCOT",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-07-25",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iren-horizon-childress-tx"
  },
  {
   "id": "iren-sweetwater-tx",
   "name": "IREN Sweetwater Campus",
   "operator": "IREN (Iris Energy)",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Sweetwater",
   "county": "Nolan",
   "state": "TX",
   "latitude": 32.4707,
   "longitude": -100.4059,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 2000,
   "capacity_mw_operational": null,
   "land_acres": 2200,
   "investment_usd": null,
   "jobs_permanent": 350,
   "jobs_construction": 700,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "ERCOT",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-07-25",
   "source_count": 11,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iren-sweetwater-tx"
  },
  {
   "id": "iren-woods-county-ok",
   "name": "IREN Woods County Campus",
   "operator": "IREN (Iris Energy)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Alva",
   "county": "Woods",
   "state": "OK",
   "latitude": 36.8031,
   "longitude": -98.667,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1600,
   "capacity_mw_operational": null,
   "land_acres": 2000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "OG&E",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iren-woods-county-ok"
  },
  {
   "id": "iron-city-wells-karthaus-township-clearfield-pa",
   "name": "Iron City Wells A.I. Data Center",
   "operator": "Iron City Wells, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Karthaus Township",
   "county": "Clearfield",
   "state": "PA",
   "latitude": 41.1420054,
   "longitude": -78.1040324,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-city-wells-karthaus-township-clearfield-pa"
  },
  {
   "id": "westdulles-iron-horse-hanover-va",
   "name": "Iron Horse Data Center Campus",
   "operator": "WestDulles Properties",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": null,
   "county": "Hanover",
   "state": "VA",
   "latitude": 37.762,
   "longitude": -77.44,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 180,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/westdulles-iron-horse-hanover-va"
  },
  {
   "id": "iron-mountain-azp-1-az",
   "name": "Iron Mountain AZP-1",
   "operator": "Iron Mountain",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Phoenix",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.4547261,
   "longitude": -111.9762182,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 39,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-mountain-azp-1-az"
  },
  {
   "id": "iron-mountain-azp-2-az",
   "name": "Iron Mountain AZP-2",
   "operator": "Iron Mountain",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Phoenix",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.4521575,
   "longitude": -111.9772945,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 39,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-mountain-azp-2-az"
  },
  {
   "id": "iron-mountain-azs-1-az",
   "name": "Iron Mountain AZS-1",
   "operator": "Iron Mountain",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Scottsdale",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.6446663,
   "longitude": -111.8960985,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 5.8,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-mountain-azs-1-az"
  },
  {
   "id": "ironmountain-bos1-northborough-ma",
   "name": "Iron Mountain Boston Data Center (BOS-1)",
   "operator": "Iron Mountain",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Northborough",
   "county": "Worcester",
   "state": "MA",
   "latitude": 42.34088,
   "longitude": -71.63706,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 3.6,
   "capacity_mw_operational": 1.2,
   "land_acres": 58.3,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "iron-mountain-chi1-des-plaines-il",
   "name": "Iron Mountain CHI-1",
   "operator": "Iron Mountain Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Des Plaines",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.0116575,
   "longitude": -87.8811913,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 36,
   "capacity_mw_operational": null,
   "land_acres": 13,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 20000000,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-mountain-chi1-des-plaines-il"
  },
  {
   "id": "iron-mountain-nje1-edison-nj",
   "name": "Iron Mountain Data Centers NJE-1",
   "operator": "Iron Mountain",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Edison",
   "county": "Middlesex",
   "state": "NJ",
   "latitude": 40.5210834,
   "longitude": -74.3473835,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 30,
   "land_acres": 43,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": 7.2,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-mountain-nje1-edison-nj"
  },
  {
   "id": "iron-mountain-den1-denver-co",
   "name": "Iron Mountain DEN-1 Denver Data Center",
   "operator": "Iron Mountain Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Denver",
   "county": "Denver",
   "state": "CO",
   "latitude": 39.7773827,
   "longitude": -104.9695542,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 14.4,
   "land_acres": 6,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Xcel Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-mountain-den1-denver-co"
  },
  {
   "id": "iron-mountain-mia-1-miami-fl",
   "name": "Iron Mountain MIA-1",
   "operator": "Iron Mountain",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Westview",
   "county": "Miami-Dade",
   "state": "FL",
   "latitude": 25.88416,
   "longitude": -80.247556,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 16,
   "capacity_mw_operational": null,
   "land_acres": 3.4,
   "investment_usd": 150000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Florida Power & Light (FPL)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-mountain-mia-1-miami-fl"
  },
  {
   "id": "iron-mountain-miamisburg-oh",
   "name": "Iron Mountain OHS-1 (Miamisburg)",
   "operator": "Iron Mountain",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Miamisburg",
   "county": "Montgomery",
   "state": "OH",
   "latitude": 39.6428362,
   "longitude": -84.2866083,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 1.4,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-mountain-miamisburg-oh"
  },
  {
   "id": "iron-mountain-va-2-va",
   "name": "Iron Mountain VA-2",
   "operator": "Iron Mountain",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Manassas",
   "county": "Prince William",
   "state": "VA",
   "latitude": 38.7772373,
   "longitude": -77.5459965,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-mountain-va-2-va"
  },
  {
   "id": "iron-mountain-va-3-va",
   "name": "Iron Mountain VA-3",
   "operator": "Iron Mountain",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Manassas",
   "county": "Prince William",
   "state": "VA",
   "latitude": 38.7755471,
   "longitude": -77.5451498,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 142,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-mountain-va-3-va"
  },
  {
   "id": "iron-mountain-va-4-va",
   "name": "Iron Mountain VA-4",
   "operator": "Iron Mountain",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Manassas",
   "county": "Prince William",
   "state": "VA",
   "latitude": 38.7744146,
   "longitude": -77.54223,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 32,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-mountain-va-4-va"
  },
  {
   "id": "iron-mountain-va-6-va",
   "name": "Iron Mountain VA-6",
   "operator": "Iron Mountain",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Manassas",
   "county": "Prince William",
   "state": "VA",
   "latitude": 38.7681429,
   "longitude": -77.5386481,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 32,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-mountain-va-6-va"
  },
  {
   "id": "iron-mountain-white-oak-henrico-va",
   "name": "Iron Mountain White Oak Technology Park Campus",
   "operator": "Iron Mountain",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Henrico",
   "county": "Henrico",
   "state": "VA",
   "latitude": 37.556,
   "longitude": -77.427,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": null,
   "land_acres": 66,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-11",
   "record_updated": "2026-07-23",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-mountain-white-oak-henrico-va"
  },
  {
   "id": "iron-mountain-wpa-1-boyers-butler-county-pa",
   "name": "Iron Mountain WPA-1 (Boyers underground data center)",
   "operator": "Iron Mountain",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Boyers",
   "county": "Butler",
   "state": "PA",
   "latitude": 41.0956,
   "longitude": -79.9128,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 40,
   "capacity_mw_operational": null,
   "land_acres": 200,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/iron-mountain-wpa-1-boyers-butler-county-pa"
  },
  {
   "id": "isocentric-networks-tulsa-ok",
   "name": "Isocentric Networks Tulsa Data Center",
   "operator": "Isocentric Networks",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tulsa",
   "county": "Tulsa",
   "state": "OK",
   "latitude": 36.154,
   "longitude": -95.9928,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "ite-guam-harmon-gu",
   "name": "IT&E Guam Data Center",
   "operator": "IT&E",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tamuning",
   "county": null,
   "state": "GU",
   "latitude": 13.5030828,
   "longitude": 144.8117863,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "ite-saipan-susupe-mp",
   "name": "IT&E Saipan Data Center",
   "operator": "IT&E",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Susupe",
   "county": null,
   "state": "MP",
   "latitude": 15.1587626,
   "longitude": 145.7066756,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "its-monticello-ia",
   "name": "ITS Iowa Data Center (Monticello)",
   "operator": "Infrastructure Technology Solutions (ITS)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Monticello",
   "county": "Jones",
   "state": "IA",
   "latitude": 42.2382752,
   "longitude": -91.1869428,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-04",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/its-monticello-ia"
  },
  {
   "id": "jailhouse-studios-chattanooga-tn",
   "name": "Jailhouse Studios (former Hamilton County Jail)",
   "operator": "Urban Story Ventures",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Chattanooga",
   "county": "Hamilton",
   "state": "TN",
   "latitude": 35.04572,
   "longitude": -85.30949,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/jailhouse-studios-chattanooga-tn"
  },
  {
   "id": "jefferson-proving-ground-data-center-jefferson-county-in",
   "name": "Jefferson Proving Ground Data Center",
   "operator": "Undisclosed",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Madison",
   "county": "Jefferson",
   "state": "IN",
   "latitude": 38.82,
   "longitude": -85.4,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 549,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/jefferson-proving-ground-data-center-jefferson-county-in"
  },
  {
   "id": "jet-ai-moapa-clark-county-nv",
   "name": "Jet.AI Moapa Data Center Campus",
   "operator": "Jet.AI Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Moapa",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.6673648,
   "longitude": -114.584977,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": 20,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-12-23",
   "record_updated": "2026-09-11",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/jet-ai-moapa-clark-county-nv"
  },
  {
   "id": "jigowatt-stanton-ne",
   "name": "Jigowatt Stanton Bitcoin Mine",
   "operator": "Jigowatt",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Stanton",
   "county": "Stanton",
   "state": "NE",
   "latitude": 41.94722,
   "longitude": -97.21722,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 70,
   "capacity_mw_operational": 20,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023",
   "record_updated": "2026-08-08",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/jigowatt-stanton-ne"
  },
  {
   "id": "joliet-technology-center-il",
   "name": "Joliet Technology Center",
   "operator": "HW Technology Park (Hillwood Investment Properties / PowerHouse Data Centers)",
   "company": "powerhouse-hillwood",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Joliet",
   "county": "Will",
   "state": "IL",
   "latitude": 41.432,
   "longitude": -88.128,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1800,
   "capacity_mw_operational": null,
   "land_acres": 795,
   "investment_usd": 20000000000,
   "jobs_permanent": 700,
   "jobs_construction": 7000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-08-03",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/joliet-technology-center-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/joliet-technology-center-il"
  },
  {
   "id": "jones-eagle-dewitt-ar",
   "name": "Jones Eagle Bitcoin Mine",
   "operator": "Jones Eagle LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "DeWitt",
   "county": "Arkansas",
   "state": "AR",
   "latitude": 34.2875,
   "longitude": -91.3383,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023",
   "record_updated": "2026-08-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/jones-eagle-dewitt-ar"
  },
  {
   "id": "joule-millard-county-ut",
   "name": "Joule Energy and Data Center Campus",
   "operator": "Joule Capital Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Holden",
   "county": "Millard",
   "state": "UT",
   "latitude": 39.1072,
   "longitude": -112.165,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 4000,
   "capacity_mw_operational": null,
   "land_acres": 4000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "PacifiCorp",
   "on_site_generation_mw": 1000,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-09-04",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/joule-millard-county-ut"
  },
  {
   "id": "jpmorgan-chase-orangeburg-ny",
   "name": "JPMorgan Chase Data Center, Orangeburg",
   "operator": "JPMorgan Chase",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Orangeburg",
   "county": "Rockland",
   "state": "NY",
   "latitude": 41.044286,
   "longitude": -73.973952,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": 1,
   "jobs_construction": 1450,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 77000000,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/jpmorgan-chase-orangeburg-ny"
  },
  {
   "id": "jumping-bison-greensburg-decatur-county-in",
   "name": "Jumping Bison Greensburg Data Center",
   "operator": "Jumping Bison LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Greensburg",
   "county": "Decatur",
   "state": "IN",
   "latitude": 39.3372,
   "longitude": -85.4836,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 340,
   "investment_usd": 800000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2024-12-10",
   "record_updated": "2026-09-01",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/jumping-bison-greensburg-decatur-county-in"
  },
  {
   "id": "terawulf-hawesville-ky",
   "name": "Justified Data Campus",
   "operator": "TeraWulf",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Hawesville",
   "county": "Hancock",
   "state": "KY",
   "latitude": 37.8999,
   "longitude": -86.7569,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 401,
   "capacity_mw_operational": null,
   "land_acres": 750,
   "investment_usd": 4000000000,
   "jobs_permanent": 100,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Big Rivers Electric Corporation",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-07-25",
   "source_count": 10,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/terawulf-hawesville-ky"
  },
  {
   "id": "rocklocker-kalkaska-go-mi",
   "name": "Kalkaska Go",
   "operator": "Rocklocker LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": null,
   "county": "Kalkaska",
   "state": "MI",
   "latitude": 44.7254528,
   "longitude": -85.2916494,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1440,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/rocklocker-kalkaska-go-mi"
  },
  {
   "id": "hawaiki-cable-kapolei-hi",
   "name": "Kapolei Cable Landing Station",
   "operator": "Hawaiki Submarine Cable USA LLC (BW Digital)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Kapolei",
   "county": null,
   "state": "HI",
   "latitude": 21.349388772017,
   "longitude": -158.128697947756,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hawaiki-cable-kapolei-hi"
  },
  {
   "id": "karis-critical-deep-river-merrillville-in",
   "name": "Karis Critical Deep River Campus",
   "operator": "Karis Critical",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Merrillville",
   "county": "Lake",
   "state": "IN",
   "latitude": 41.47,
   "longitude": -87.27,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 180,
   "investment_usd": 900000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/karis-critical-deep-river-merrillville-in"
  },
  {
   "id": "hawaiiantel-kawaihae-hi",
   "name": "Kawaihae Data Center",
   "operator": "Hawaiian Telcom",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Kawaihae",
   "county": "Hawaii",
   "state": "HI",
   "latitude": 20.0397244,
   "longitude": -155.829133,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "md-squared-power-pikeville-pike-ky",
   "name": "Kentucky Enterprise Industrial Park Data Center",
   "operator": "MD Squared Power LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Pikeville",
   "county": "Pike",
   "state": "KY",
   "latitude": 37.4792672,
   "longitude": -82.5187629,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 250000000,
   "jobs_permanent": 40,
   "jobs_construction": 190,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/md-squared-power-pikeville-pike-ky"
  },
  {
   "id": "guild-ventures-kenwood-commons-albany-ny",
   "name": "Kenwood Commons Technology Campus",
   "operator": "Guild Ventures",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Albany",
   "county": "Albany",
   "state": "NY",
   "latitude": 42.6225,
   "longitude": -73.7601,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 76,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/guild-ventures-kenwood-commons-albany-ny"
  },
  {
   "id": "green-energy-ventures-king-george-technology-center-va",
   "name": "King George Technology Center",
   "operator": "Green Energy Ventures",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "King George",
   "county": "King George",
   "state": "VA",
   "latitude": 38.250254083928,
   "longitude": -77.29011580291154,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 352,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/green-energy-ventures-king-george-technology-center-va"
  },
  {
   "id": "hut8-king-mountain-mccamey-tx",
   "name": "King Mountain Facility (50% JV)",
   "operator": "Hut 8",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "McCamey",
   "county": "Upton",
   "state": "TX",
   "latitude": 31.2547925,
   "longitude": -102.244163,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 280,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-18",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "energy-storage-solutions-kingsboro-edgecombe-county-nc",
   "name": "Kingsboro AI Data Center Campus",
   "operator": "Energy Storage Solutions",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Rocky Mount",
   "county": "Edgecombe",
   "state": "NC",
   "latitude": 35.941,
   "longitude": -77.734,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 900,
   "capacity_mw_operational": null,
   "land_acres": 155,
   "investment_usd": 19200000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-08-15",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/energy-storage-solutions-kingsboro-edgecombe-county-nc"
  },
  {
   "id": "thor-equities-kingston-technology-hub-bartow-ga",
   "name": "Kingston Technology Hub (Thor Equities)",
   "operator": "Thor Equities",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Kingston",
   "county": "Bartow",
   "state": "GA",
   "latitude": 34.2367172,
   "longitude": -84.9450325,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 150,
   "capacity_mw_operational": null,
   "land_acres": 559,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/thor-equities-kingston-technology-hub-bartow-ga"
  },
  {
   "id": "vermaland-la-osa-eloy-az",
   "name": "La Osa Data Center Park",
   "operator": "Vermaland LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Eloy",
   "county": "Pinal",
   "state": "AZ",
   "latitude": 32.75,
   "longitude": -111.55,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 3300,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Western Area Power Administration (WAPA), proposed grid transmission line upgrades for interconnect. APS and SRP not confirmed as utility providers.",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-08-28",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vermaland-la-osa-eloy-az"
  },
  {
   "id": "aws-lake-anna-technology-campus-louisa-va",
   "name": "Lake Anna Technology Campus (LATC)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Louisa",
   "county": "Louisa",
   "state": "VA",
   "latitude": 38.04763641638,
   "longitude": -77.81682351474,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 600,
   "capacity_mw_operational": null,
   "land_acres": 153,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Rappahannock Electric Co-op",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-lake-anna-technology-campus-louisa-va"
  },
  {
   "id": "lambda-chicago-edgeconnex-il",
   "name": "Lambda Chicago EdgeConneX AI Factory",
   "operator": "Lambda",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Chicago",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.8781,
   "longitude": -87.6298,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 23,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-08-21",
   "record_updated": "2026-07-24",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lambda-chicago-edgeconnex-il"
  },
  {
   "id": "lambda-kansas-city-mo",
   "name": "Lambda Kansas City AI Supercomputer",
   "operator": "Lambda",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Kansas City",
   "county": "Platte",
   "state": "MO",
   "latitude": 39.33,
   "longitude": -94.72,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 100,
   "capacity_mw_operational": null,
   "land_acres": 16.9,
   "investment_usd": 500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Evergy",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lambda-kansas-city-mo"
  },
  {
   "id": "lambda-aligned-plano-tx",
   "name": "Lambda Plano AI Data Center (Aligned DFW-04)",
   "operator": "Lambda",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Plano",
   "county": "Collin",
   "state": "TX",
   "latitude": 33.0198,
   "longitude": -96.6989,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 100,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-07-07",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lambda-aligned-plano-tx"
  },
  {
   "id": "lancium-crusoe-abilene-tx",
   "name": "Lancium Clean Campus (Crusoe / Stargate Site 1)",
   "operator": "Crusoe",
   "company": "openai-oracle",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Abilene",
   "county": "Taylor",
   "state": "TX",
   "latitude": 32.502213,
   "longitude": -99.788717,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1200,
   "capacity_mw_operational": 200,
   "land_acres": 1000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2021-12",
   "record_updated": "2026-07-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lancium-crusoe-abilene-tx"
  },
  {
   "id": "lancium-fort-stockton-tx",
   "name": "Lancium Fort Stockton Clean Campus",
   "operator": "Lancium",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Fort Stockton",
   "county": "Pecos",
   "state": "TX",
   "latitude": 30.894,
   "longitude": -102.879,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 325,
   "capacity_mw_operational": 25,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lancium-fort-stockton-tx"
  },
  {
   "id": "new-era-energy-digital-lea-county-data-center-nm",
   "name": "Lea County Data Center",
   "operator": "New Era Energy & Digital, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Lovington",
   "county": "Lea",
   "state": "NM",
   "latitude": 32.7,
   "longitude": -103.3,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 7000,
   "capacity_mw_operational": null,
   "land_acres": 3500,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": 7000,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-03",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/new-era-energy-digital-lea-county-data-center-nm"
  },
  {
   "id": "leola-data-center-mcpherson-county-sd",
   "name": "Leola Data Center",
   "operator": "Leola Data Center, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Leola",
   "county": "McPherson",
   "state": "SD",
   "latitude": 45.704374067105,
   "longitude": -99.035447087942,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": 20,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/leola-data-center-mcpherson-county-sd"
  },
  {
   "id": "lex-developments-pocatello-id",
   "name": "Lex Developments AI Data Center (former Hoku polysilicon site)",
   "operator": "Lex Developments",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Pocatello",
   "county": "Bannock",
   "state": "ID",
   "latitude": 42.8713,
   "longitude": -112.4455,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 2260000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lex-developments-pocatello-id"
  },
  {
   "id": "edgeconnex-liberty-road-douglas-county-ga",
   "name": "Liberty Road Data Center Campus (EdgeConneX)",
   "operator": "EdgeConneX (applicant East Village Dothan LLC)",
   "company": "edgeconnex",
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Villa Rica",
   "county": "Douglas",
   "state": "GA",
   "latitude": 33.7314864,
   "longitude": -84.900079,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 700,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/edgeconnex-liberty-road-douglas-county-ga"
  },
  {
   "id": "lightedge-solutions-altoona-ia",
   "name": "LightEdge Altoona Data Center Campus",
   "operator": "LightEdge Solutions",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Altoona",
   "county": "Polk",
   "state": "IA",
   "latitude": 41.6433,
   "longitude": -93.4627,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "lightedge-ames-ia",
   "name": "LightEdge Ames Edge Colocation Data Center",
   "operator": "LightEdge Solutions",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Ames",
   "county": "Story",
   "state": "IA",
   "latitude": 42.0308,
   "longitude": -93.6319,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 25,
   "capacity_mw_operational": null,
   "land_acres": 10.86,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": 0,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-21",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/ames-iowa-lightedge-data-center-proposal",
   "profile_url": "https://suedatacenters.org/data-centers/lightedge-ames-ia"
  },
  {
   "id": "lightedge-chaska-mn",
   "name": "LightEdge Chaska (fka Stream Data Centers Minneapolis I)",
   "operator": "LightEdge (GI Partners)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Chaska",
   "county": "Carver",
   "state": "MN",
   "latitude": 44.828,
   "longitude": -93.635,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 3.6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-01-17",
   "record_updated": "2026-08-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lightedge-chaska-mn"
  },
  {
   "id": "lightedge-papillion-ne",
   "name": "LightEdge Omaha Data Center",
   "operator": "LightEdge",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Papillion",
   "county": "Sarpy",
   "state": "NE",
   "latitude": 41.1544,
   "longitude": -96.0428,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-14",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lightedge-papillion-ne"
  },
  {
   "id": "mcd7-limerick-township-montgomery-county-pa",
   "name": "Limerick Township Data Center Campus (MCD 7)",
   "operator": "MCD 7 LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Limerick Township",
   "county": "Montgomery",
   "state": "PA",
   "latitude": 40.2447,
   "longitude": -75.573,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 750,
   "capacity_mw_operational": null,
   "land_acres": 192,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": 1.3,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-01",
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mcd7-limerick-township-montgomery-county-pa"
  },
  {
   "id": "litewire-mcminnville-tn",
   "name": "Litewire McMinnville (former A.O. Smith Building)",
   "operator": "Litewire",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "McMinnville",
   "county": "Warren",
   "state": "TN",
   "latitude": 35.69221,
   "longitude": -85.7619,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": 66,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "ln-compute-cuthbert-ga",
   "name": "LN Compute Cuthbert Bitcoin Mine",
   "operator": "LN Compute Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Cuthbert",
   "county": "Randolph",
   "state": "GA",
   "latitude": 31.77083,
   "longitude": -84.79361,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 7,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09",
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ln-compute-cuthbert-ga"
  },
  {
   "id": "ln-energy-blackshear-pierce-ga",
   "name": "LN Energy Blackshear Bitcoin Mine",
   "operator": "LN Energy",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Blackshear",
   "county": "Pierce",
   "state": "GA",
   "latitude": 31.30518,
   "longitude": -82.24207,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ln-energy-blackshear-pierce-ga"
  },
  {
   "id": "hut8-logan-prairie-latham-il",
   "name": "Logan Prairie Data Center",
   "operator": "Hut 8 Corp",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Latham",
   "county": "Logan",
   "state": "IL",
   "latitude": 39.9672,
   "longitude": -89.1614,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 5000000000,
   "jobs_permanent": 200,
   "jobs_construction": 1500,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Ameren Illinois",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/hut8-logan-prairie-latham-il"
  },
  {
   "id": "logix-reality-frankfort-clinton-county-in",
   "name": "Logix Reality Frankfort Data Center",
   "operator": "Logix Reality LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Frankfort",
   "county": "Clinton",
   "state": "IN",
   "latitude": 40.2792,
   "longitude": -86.5108,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 714.55,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/logix-reality-frankfort-clinton-county-in"
  },
  {
   "id": "long-ferry-road-rowan-county-nc",
   "name": "Long Ferry Road Data Center Campus (Rowan County)",
   "operator": "Undisclosed developer",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": null,
   "county": "Rowan",
   "state": "NC",
   "latitude": 35.6944,
   "longitude": -80.3974,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 400,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/long-ferry-road-rowan-county-nc"
  },
  {
   "id": "diversified-longhorn-pad-a-horton-township-elk-pa",
   "name": "Longhorn Pad A Wellhead Bitcoin Mine",
   "operator": "Diversified Production LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Horton Township",
   "county": "Elk",
   "state": "PA",
   "latitude": 41.2816445,
   "longitude": -78.7281388,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "liquidcool-loring-afb-me",
   "name": "Loring LiquidCool Data Center (Green 4 Maine Campus)",
   "operator": "LiquidCool Solutions / Green 4 Maine",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Limestone",
   "county": "Aroostook",
   "state": "ME",
   "latitude": 46.9502,
   "longitude": -67.8849,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": "Versant Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/liquidcool-loring-afb-me"
  },
  {
   "id": "stillwater-lovejoy-panhandle-road-clayton-ga",
   "name": "Lovejoy Data Center Campus (Stillwater Development)",
   "operator": "Stillwater Development",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Lovejoy",
   "county": "Clayton",
   "state": "GA",
   "latitude": 33.4516522,
   "longitude": -84.343564,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1250,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stillwater-lovejoy-panhandle-road-clayton-ga"
  },
  {
   "id": "fremont-peak-luckett-road-marana-az",
   "name": "Luckett Road Data Centers (Fremont Peak Properties)",
   "operator": "Fremont Peak Properties LLC (Beale Infrastructure)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Marana",
   "county": "Pima",
   "state": "AZ",
   "latitude": 32.495,
   "longitude": -111.198,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1500,
   "capacity_mw_operational": null,
   "land_acres": 661,
   "investment_usd": 5000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Trico Electric Cooperative (north parcel); Tucson Electric Power (south parcel)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-08-28",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fremont-peak-luckett-road-marana-az"
  },
  {
   "id": "lumen-akron-2-oh",
   "name": "Lumen Akron 2",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Akron",
   "county": "Summit",
   "state": "OH",
   "latitude": 41.0695694,
   "longitude": -81.4907582,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 3,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-akron-2-oh"
  },
  {
   "id": "lumen-albany-4-ny",
   "name": "Lumen Albany 4",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Albany",
   "county": "Albany",
   "state": "NY",
   "latitude": 42.7356308,
   "longitude": -73.818665,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "National Grid",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-albany-4-ny"
  },
  {
   "id": "lumen-ashburn-va",
   "name": "Lumen Ashburn",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.022182,
   "longitude": -77.4576094,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-ashburn-va"
  },
  {
   "id": "lumen-austin-1-tx",
   "name": "Lumen Austin 1",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Austin",
   "county": "Travis",
   "state": "TX",
   "latitude": 30.1965,
   "longitude": -97.7124025,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-austin-1-tx"
  },
  {
   "id": "lumen-austin-3-tx",
   "name": "Lumen Austin 3",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Austin",
   "county": "Travis",
   "state": "TX",
   "latitude": 30.261396,
   "longitude": -97.7235975,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-austin-3-tx"
  },
  {
   "id": "lumen-baltimore-1-md",
   "name": "Lumen Baltimore 1",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Baltimore",
   "county": "Baltimore city",
   "state": "MD",
   "latitude": 39.2917592,
   "longitude": -76.6204024,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "BGE",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-baltimore-1-md"
  },
  {
   "id": "lumen-cincinnati-1-oh",
   "name": "Lumen Cincinnati 1 (400 Pike Street)",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Cincinnati",
   "county": "Hamilton",
   "state": "OH",
   "latitude": 39.1019019,
   "longitude": -84.5031833,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-cincinnati-1-oh"
  },
  {
   "id": "lumen-cleveland-1-oh",
   "name": "Lumen Cleveland 1",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Cleveland",
   "county": "Cuyahoga",
   "state": "OH",
   "latitude": 41.5050658,
   "longitude": -81.6577764,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-cleveland-1-oh"
  },
  {
   "id": "lumen-dallas-1-tx",
   "name": "Lumen Dallas 1",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Dallas",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.8069549,
   "longitude": -96.8685888,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-dallas-1-tx"
  },
  {
   "id": "lumen-dallas-6-tx",
   "name": "Lumen Dallas 6",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Dallas",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.827998,
   "longitude": -96.8843787,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-dallas-6-tx"
  },
  {
   "id": "lumen-madison-1-wi",
   "name": "Lumen Madison 1",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Madison",
   "county": "Dane",
   "state": "WI",
   "latitude": 43.0677161,
   "longitude": -89.3922794,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-madison-1-wi"
  },
  {
   "id": "lumen-mclean-1-va",
   "name": "Lumen McLean 1",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "McLean",
   "county": "Fairfax",
   "state": "VA",
   "latitude": 38.9208538,
   "longitude": -77.2115713,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-mclean-1-va"
  },
  {
   "id": "lumen-minneapolis-3-mn",
   "name": "Lumen Minneapolis 3",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Minneapolis",
   "county": "Hennepin",
   "state": "MN",
   "latitude": 44.9887662,
   "longitude": -93.2766103,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Xcel Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-minneapolis-3-mn"
  },
  {
   "id": "lumen-norristown-pa",
   "name": "Lumen Norristown",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Norristown",
   "county": "Montgomery",
   "state": "PA",
   "latitude": 40.127067,
   "longitude": -75.4086586,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PECO",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-norristown-pa"
  },
  {
   "id": "lumen-ogden-ut",
   "name": "Lumen Ogden 1",
   "operator": "Lumen",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ogden",
   "county": "Weber",
   "state": "UT",
   "latitude": 41.223,
   "longitude": -111.97384,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 3,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-ogden-ut"
  },
  {
   "id": "lumen-phoenix-1-az",
   "name": "Lumen Phoenix 1",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Phoenix",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.494309,
   "longitude": -112.0707916,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-phoenix-1-az"
  },
  {
   "id": "lumen-salt-lake-city-ut",
   "name": "Lumen Salt Lake City Sites (Salt Lake 1, 2 and 4)",
   "operator": "Lumen",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Salt Lake City",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.75962,
   "longitude": -111.8868,
   "coordinate_precision": "representative_multi_site",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-salt-lake-city-ut"
  },
  {
   "id": "lumen-san-antonio-2-tx",
   "name": "Lumen San Antonio 2",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Antonio",
   "county": "Bexar",
   "state": "TX",
   "latitude": 29.4382791,
   "longitude": -98.5065217,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-san-antonio-2-tx"
  },
  {
   "id": "lumen-santa-clara-1-ca",
   "name": "Lumen Santa Clara 1",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3770332,
   "longitude": -121.952059,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-santa-clara-1-ca"
  },
  {
   "id": "lumen-spokane-wa",
   "name": "Lumen Spokane",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Spokane",
   "county": "Spokane",
   "state": "WA",
   "latitude": 47.6542257,
   "longitude": -117.4200007,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Modern Electric Water Company",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-spokane-wa"
  },
  {
   "id": "lumen-sunnyvale-1-ca",
   "name": "Lumen Sunnyvale 1",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sunnyvale",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3734695,
   "longitude": -121.9878002,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Pacific Gas & Electric (PG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-sunnyvale-1-ca"
  },
  {
   "id": "lumen-weehawken-1-nj",
   "name": "Lumen Weehawken 1 Data Center",
   "operator": "Lumen Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Weehawken",
   "county": "Hudson",
   "state": "NJ",
   "latitude": 40.7714,
   "longitude": -74.0194,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumen-weehawken-1-nj"
  },
  {
   "id": "lunavi-cheyenne-wy",
   "name": "Lunavi Cheyenne Data Center",
   "operator": "Lunavi",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Cheyenne",
   "county": "Laramie",
   "state": "WY",
   "latitude": 41.11,
   "longitude": -104.78,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 8,
   "capacity_mw_operational": 5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lunavi-cheyenne-wy"
  },
  {
   "id": "beltline-luther-horizon-technology-park-ok",
   "name": "Luther Horizon Technology Park",
   "operator": "Beltline Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Luther",
   "county": "Oklahoma",
   "state": "OK",
   "latitude": 35.6612,
   "longitude": -97.1961,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 14000000000,
   "jobs_permanent": 420,
   "jobs_construction": 11100,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Oklahoma Gas & Electric (OG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/beltline-luther-horizon-technology-park-ok"
  },
  {
   "id": "western-hospitality-partners-pekin-il",
   "name": "Lutticken Farm Data Center (Pekin)",
   "operator": "Western Hospitality Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Pekin",
   "county": "Tazewell",
   "state": "IL",
   "latitude": 40.5847113,
   "longitude": -89.58595,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/western-hospitality-partners-pekin-il"
  },
  {
   "id": "xai-macrohardrr-southaven-ms",
   "name": "MACROHARDRR (xAI Southaven Data Center III)",
   "operator": "xAI",
   "company": "xai",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Southaven",
   "county": "DeSoto",
   "state": "MS",
   "latitude": 34.991886,
   "longitude": -90.034358,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 20000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-01-08",
   "record_updated": "2026-09-13",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/xai-macrohardrr-southaven-ms"
  },
  {
   "id": "manse-technology-campus-pahrump-nv",
   "name": "Manse Technology Campus",
   "operator": "Manse Technology Campus LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Pahrump",
   "county": "Nye",
   "state": "NV",
   "latitude": 36.1925194,
   "longitude": -115.9758446,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 900,
   "investment_usd": 18400000000,
   "jobs_permanent": 380,
   "jobs_construction": 1600,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07",
   "record_updated": "2026-09-11",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/manse-technology-campus-pahrump-nv"
  },
  {
   "id": "mara-findlay-oh",
   "name": "MARA Findlay Data Center",
   "operator": "MARA Holdings",
   "company": "mara-holdings",
   "facility_type": "crypto_mining",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Findlay",
   "county": "Hancock",
   "state": "OH",
   "latitude": 41.0442,
   "longitude": -83.6499,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 150,
   "capacity_mw_operational": 30,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-03",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mara-findlay-oh"
  },
  {
   "id": "mara-flared-gas-fleet-tx-nd",
   "name": "MARA Flared/Stranded-Gas Mining Fleet (TX + ND)",
   "operator": "MARA Holdings",
   "company": "mara-holdings",
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Midland/Odessa area (representative)",
   "county": null,
   "state": "TX",
   "latitude": 31.87,
   "longitude": -102.37,
   "coordinate_precision": "representative_multi_site",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 25,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mara-flared-gas-fleet-tx-nd"
  },
  {
   "id": "mara-granbury-hood-tx",
   "name": "MARA Granbury Facility",
   "operator": "MARA Holdings",
   "company": "mara-holdings",
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Granbury",
   "county": "Hood",
   "state": "TX",
   "latitude": 32.4427,
   "longitude": -97.7871,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 300,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-17",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/granbury-bitcoin-mine-noise-lawsuits",
   "profile_url": "https://suedatacenters.org/data-centers/mara-granbury-hood-tx"
  },
  {
   "id": "mara-hannibal-monroe-oh",
   "name": "MARA Hannibal Data Center",
   "operator": "MARA Holdings",
   "company": "mara-holdings",
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Hannibal",
   "county": "Monroe",
   "state": "OH",
   "latitude": 39.6675,
   "longitude": -80.8721,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-17",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mara-hannibal-monroe-oh"
  },
  {
   "id": "mara-hopedale-harrison-oh",
   "name": "MARA Hopedale Data Center",
   "operator": "MARA Holdings",
   "company": "mara-holdings",
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Hopedale",
   "county": "Harrison",
   "state": "OH",
   "latitude": 40.3253,
   "longitude": -80.9012,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-17",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mara-hopedale-harrison-oh"
  },
  {
   "id": "mara-kearney-buffalo-ne",
   "name": "MARA Kearney Facility",
   "operator": "MARA Holdings",
   "company": "mara-holdings",
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Kearney",
   "county": "Buffalo",
   "state": "NE",
   "latitude": 40.728341,
   "longitude": -99.045806,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 100,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mara-kearney-buffalo-ne"
  },
  {
   "id": "marathon-digital-garden-city-tx",
   "name": "Marathon Digital Garden City Facility",
   "operator": "MARA Holdings",
   "company": "mara-holdings",
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Garden City",
   "county": "Glasscock",
   "state": "TX",
   "latitude": 31.8724,
   "longitude": -101.4849,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 200,
   "land_acres": null,
   "investment_usd": 87300000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/marathon-digital-garden-city-tx"
  },
  {
   "id": "markley-boston-summer-street-ma",
   "name": "Markley Group Boston (One Summer Street / BOSIX)",
   "operator": "Markley Group",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Boston",
   "county": "Suffolk",
   "state": "MA",
   "latitude": 42.3545151,
   "longitude": -71.0595422,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 30,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-18",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/markley-boston-summer-street-ma"
  },
  {
   "id": "markley-lowell-ma",
   "name": "Markley Group One Lowell Data Center",
   "operator": "Markley Group",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Lowell",
   "county": "Middlesex",
   "state": "MA",
   "latitude": 42.6334,
   "longitude": -71.3162,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": 0.12,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2015-01",
   "record_updated": "2026-07-06",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/markley-lowell-ma"
  },
  {
   "id": "lumon-solutions-marshfield-mo",
   "name": "Marshfield Data Center (Lumon Solutions)",
   "operator": "Lumon Solutions Marshfield, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Marshfield",
   "county": "Webster",
   "state": "MO",
   "latitude": 37.36,
   "longitude": -92.905,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lumon-solutions-marshfield-mo"
  },
  {
   "id": "mason-columbia-road-data-center-mi",
   "name": "Mason / Vevay Township Data Center (unnamed developer)",
   "operator": "Undisclosed developer (represented by Dykema Gossett PLLC)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Mason",
   "county": "Ingham",
   "state": "MI",
   "latitude": 42.582234294066,
   "longitude": -84.479676261494,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 400,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mason-columbia-road-data-center-mi"
  },
  {
   "id": "mghpcc-holyoke-ma",
   "name": "Massachusetts Green High Performance Computing Center",
   "operator": "MGHPCC consortium (BU/Harvard/MIT/Northeastern/UMass/Yale)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Holyoke",
   "county": "Hampden",
   "state": "MA",
   "latitude": 42.20285,
   "longitude": -72.60693,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 15,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "City of Holyoke",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mghpcc-holyoke-ma"
  },
  {
   "id": "lavue-massaponax-tech-campus-spotsylvania-va",
   "name": "Massaponax Tech Campus",
   "operator": "Lavue Lane Owner LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Massaponax",
   "county": "Spotsylvania",
   "state": "VA",
   "latitude": 38.1869,
   "longitude": -77.5505,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 588.5564,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lavue-massaponax-tech-campus-spotsylvania-va"
  },
  {
   "id": "uh-mhpcc-kihei-hi",
   "name": "Maui High Performance Computing Center",
   "operator": "University of Hawaiʻi (for Air Force Research Laboratory)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Kihei",
   "county": null,
   "state": "HI",
   "latitude": 20.74929227073,
   "longitude": -156.439610266824,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/uh-mhpcc-kihei-hi"
  },
  {
   "id": "mcni-concord-township-hancock-county-ia",
   "name": "MCNI Concord Township Data Center (rezoning denied)",
   "operator": "MCNI",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Garner",
   "county": "Hancock",
   "state": "IA",
   "latitude": 43.09806,
   "longitude": -93.60417,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 724,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mcni-concord-township-hancock-county-ia"
  },
  {
   "id": "mdc-sdg1-san-diego-ca",
   "name": "MDC SDG1",
   "operator": "MDC Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "San Diego",
   "county": "San Diego",
   "state": "CA",
   "latitude": 32.59374,
   "longitude": -117.08525,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "mdc-sdg2-san-diego-ca",
   "name": "MDC SDG2",
   "operator": "MDC Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "San Diego",
   "county": "San Diego",
   "state": "CA",
   "latitude": 32.75,
   "longitude": -117.123,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "menlo-digital-jamestown-drive-petersburg-va",
   "name": "Menlo Digital Richmond Virginia Data Center (Jamestown Drive)",
   "operator": "Menlo Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Petersburg",
   "county": null,
   "state": "VA",
   "latitude": 37.199,
   "longitude": -77.363,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 104,
   "capacity_mw_operational": null,
   "land_acres": 74,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/menlo-digital-jamestown-drive-petersburg-va"
  },
  {
   "id": "menomonie-data-center-wi",
   "name": "Menomonie Data Center Campus",
   "operator": "Undisclosed (Balloonist LLC)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Menomonie",
   "county": "Dunn",
   "state": "WI",
   "latitude": 44.8769,
   "longitude": -91.9193,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 324,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Xcel Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-07",
   "record_updated": "2026-07-23",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/menomonie-data-center-wi"
  },
  {
   "id": "eagle-rock-meridian-technology-park-taylorville-il",
   "name": "Meridian Technology Park",
   "operator": "Eagle Rock Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Clarksdale",
   "county": "Christian",
   "state": "IL",
   "latitude": 39.489771,
   "longitude": -89.36787,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 475,
   "investment_usd": null,
   "jobs_permanent": 500,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-18",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/eagle-rock-meridian-technology-park-taylorville-il"
  },
  {
   "id": "merkle-standard-usk-wa",
   "name": "Merkle Standard Usk Facility",
   "operator": "Merkle Standard (Allrise Capital)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Usk",
   "county": "Pend Oreille",
   "state": "WA",
   "latitude": 48.3079,
   "longitude": -117.2848,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 100,
   "land_acres": 927,
   "investment_usd": 18100000,
   "jobs_permanent": 40,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-22",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/merkle-standard-usk-wa"
  },
  {
   "id": "province-group-merrillville-technology-park-in",
   "name": "Merrillville Technology Park",
   "operator": "The Province Group",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Merrillville",
   "county": "Lake",
   "state": "IN",
   "latitude": 41.46,
   "longitude": -87.29,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/province-group-merrillville-technology-park-in"
  },
  {
   "id": "meta-aiken-county-sc",
   "name": "Meta Aiken Data Center",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Graniteville",
   "county": "Aiken",
   "state": "SC",
   "latitude": 33.5629,
   "longitude": -81.8287,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": null,
   "land_acres": 300,
   "investment_usd": 800000000,
   "jobs_permanent": 100,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Aiken Electric Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-08",
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-aiken-county-sc"
  },
  {
   "id": "meta-altoona-ia",
   "name": "Meta Altoona Data Center Campus",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Altoona",
   "county": "Polk",
   "state": "IA",
   "latitude": 41.6459,
   "longitude": -93.4696,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 350,
   "land_acres": null,
   "investment_usd": 2500000000,
   "jobs_permanent": 400,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": null,
   "energy_source": "wind",
   "utility": "MidAmerican Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2013",
   "record_updated": "2026-08-14",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-altoona-ia"
  },
  {
   "id": "meta-beaver-dam-wi",
   "name": "Meta Beaver Dam Data Center Campus",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Beaver Dam",
   "county": "Dodge",
   "state": "WI",
   "latitude": 43.457,
   "longitude": -88.837,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 220,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 1000000000,
   "jobs_permanent": 100,
   "jobs_construction": 1000,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Alliant Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-09-10",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-beaver-dam-wi"
  },
  {
   "id": "meta-middleton-township-oh",
   "name": "Meta Bowling Green (Project Accordion)",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Bowling Green",
   "county": "Wood",
   "state": "OH",
   "latitude": 41.432,
   "longitude": -83.701,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 280,
   "investment_usd": 800000000,
   "jobs_permanent": 100,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Toledo Edison",
   "on_site_generation_mw": 350,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-04",
   "record_updated": "2026-07-06",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-middleton-township-oh"
  },
  {
   "id": "meta-cheyenne-wy",
   "name": "Meta Cheyenne Data Center",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Cheyenne",
   "county": "Laramie",
   "state": "WY",
   "latitude": 41.099,
   "longitude": -104.769,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 109,
   "capacity_mw_operational": null,
   "land_acres": 960,
   "investment_usd": 800000000,
   "jobs_permanent": 100,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Black Hills Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2024-07",
   "record_updated": "2026-08-19",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-cheyenne-wy"
  },
  {
   "id": "meta-davenport-ia",
   "name": "Meta Davenport Data Center",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Davenport",
   "county": "Scott",
   "state": "IA",
   "latitude": 41.5236,
   "longitude": -90.5776,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 328,
   "investment_usd": 800000000,
   "jobs_permanent": 35,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 161000000,
   "announced_date": "2024-05-21",
   "record_updated": "2026-08-14",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-davenport-ia"
  },
  {
   "id": "meta-dekalb-data-center-il",
   "name": "Meta DeKalb Data Center",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "DeKalb",
   "county": "DeKalb",
   "state": "IL",
   "latitude": 41.909,
   "longitude": -88.792,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 1000000000,
   "jobs_permanent": 200,
   "jobs_construction": 1200,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 50000000,
   "announced_date": "2020",
   "record_updated": "2026-09-12",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-dekalb-data-center-il"
  },
  {
   "id": "meta-eagle-mountain-ut",
   "name": "Meta Eagle Mountain Data Center Campus",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Eagle Mountain",
   "county": "Utah",
   "state": "UT",
   "latitude": 40.3138,
   "longitude": -111.9697,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 500,
   "investment_usd": 1500000000,
   "jobs_permanent": 300,
   "jobs_construction": 1200,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "Rocky Mountain Power (PacifiCorp)",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2018",
   "record_updated": "2026-07-25",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-eagle-mountain-ut"
  },
  {
   "id": "meta-el-paso-tx",
   "name": "Meta El Paso AI Data Center Campus",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "El Paso",
   "county": "El Paso",
   "state": "TX",
   "latitude": 31.81,
   "longitude": -106.55,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 1000,
   "investment_usd": 10000000000,
   "jobs_permanent": 300,
   "jobs_construction": 4000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "El Paso Electric",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-09-08",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-el-paso-tx"
  },
  {
   "id": "meta-forest-city-nc",
   "name": "Meta Forest City Data Center",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Forest City",
   "county": "Rutherford",
   "state": "NC",
   "latitude": 35.317,
   "longitude": -81.826,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 150,
   "investment_usd": 750000000,
   "jobs_permanent": 275,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "Duke Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 11400000,
   "announced_date": "2010",
   "record_updated": "2026-08-15",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-forest-city-nc"
  },
  {
   "id": "meta-fort-worth-tx",
   "name": "Meta Fort Worth Data Center",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Fort Worth",
   "county": "Tarrant",
   "state": "TX",
   "latitude": 32.9844048,
   "longitude": -97.2617581,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 200,
   "investment_usd": 1500000000,
   "jobs_permanent": 200,
   "jobs_construction": 1200,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "wind",
   "utility": "Oncor",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 147000000,
   "announced_date": "2015",
   "record_updated": "2026-07-25",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-fort-worth-tx"
  },
  {
   "id": "meta-gallatin-tn",
   "name": "Meta Gallatin Data Center Campus",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Gallatin",
   "county": "Sumner",
   "state": "TN",
   "latitude": 36.3884,
   "longitude": -86.4369,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": 300,
   "land_acres": 900,
   "investment_usd": 1500000000,
   "jobs_permanent": null,
   "jobs_construction": 1100,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "TVA",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2022",
   "record_updated": "2026-09-09",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-gallatin-tn"
  },
  {
   "id": "meta-huntsville-al",
   "name": "Meta Huntsville Data Center Campus",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Huntsville",
   "county": "Madison",
   "state": "AL",
   "latitude": 34.726,
   "longitude": -86.647,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 1500000000,
   "jobs_permanent": 300,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "TVA",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2018",
   "record_updated": "2026-09-09",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-huntsville-al"
  },
  {
   "id": "meta-hyperion-richland-parish-la",
   "name": "Meta Hyperion",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Delhi vicinity",
   "county": "Richland",
   "state": "LA",
   "latitude": 32.4442,
   "longitude": -91.4906,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 2000,
   "capacity_mw_operational": null,
   "land_acres": 2250,
   "investment_usd": 10000000000,
   "jobs_permanent": 500,
   "jobs_construction": 5000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": 5,
   "energy_source": "mixed",
   "utility": "Entergy Louisiana",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-01",
   "record_updated": "2026-09-10",
   "source_count": 14,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-hyperion-richland-parish-la"
  },
  {
   "id": "meta-jeffersonville-in",
   "name": "Meta Jeffersonville Data Center",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Jeffersonville",
   "county": "Clark",
   "state": "IN",
   "latitude": 38.33,
   "longitude": -85.715,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 407,
   "capacity_mw_operational": null,
   "land_acres": 619,
   "investment_usd": 800000000,
   "jobs_permanent": 100,
   "jobs_construction": 1250,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "Duke Energy Indiana",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2024-01",
   "record_updated": "2026-08-05",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-jeffersonville-in"
  },
  {
   "id": "meta-kansas-city-northland-mo",
   "name": "Meta Kansas City Northland",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Kansas City",
   "county": "Clay",
   "state": "MO",
   "latitude": 39.247,
   "longitude": -94.705,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 750,
   "capacity_mw_operational": null,
   "land_acres": 882,
   "investment_usd": 1000000000,
   "jobs_permanent": 100,
   "jobs_construction": 1500,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Evergy",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2022-03",
   "record_updated": "2026-09-10",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-kansas-city-northland-mo"
  },
  {
   "id": "meta-kuna-id",
   "name": "Meta Kuna Data Center",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Kuna",
   "county": "Ada",
   "state": "ID",
   "latitude": 43.491,
   "longitude": -116.418,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 485,
   "investment_usd": 800000000,
   "jobs_permanent": 100,
   "jobs_construction": 1400,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Idaho Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-09",
   "record_updated": "2026-08-08",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-kuna-id"
  },
  {
   "id": "meta-lebanon-in",
   "name": "Meta Lebanon (Project Domino)",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Lebanon",
   "county": "Boone",
   "state": "IN",
   "latitude": 40.07,
   "longitude": -86.45,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 1500,
   "investment_usd": 10000000000,
   "jobs_permanent": 300,
   "jobs_construction": 4000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-02",
   "record_updated": "2026-08-05",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-lebanon-in"
  },
  {
   "id": "meta-los-lunas-ai-nm",
   "name": "Meta Los Lunas AI Expansion",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Los Lunas",
   "county": "Valencia",
   "state": "NM",
   "latitude": 34.8083,
   "longitude": -106.7296,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 750,
   "investment_usd": 800000000,
   "jobs_permanent": 30,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": 1.5,
   "energy_source": "solar",
   "utility": "Public Service Company of New Mexico (PNM)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2024-12",
   "record_updated": "2026-09-10",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-los-lunas-ai-nm"
  },
  {
   "id": "meta-mesa-az",
   "name": "Meta Mesa Data Center",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Mesa",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.3375358,
   "longitude": -111.6355386,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 50,
   "land_acres": 396,
   "investment_usd": 1000000000,
   "jobs_permanent": 200,
   "jobs_construction": 2000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "Salt River Project (SRP)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2021",
   "record_updated": "2026-08-31",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-mesa-az"
  },
  {
   "id": "meta-montgomery-al",
   "name": "Meta Montgomery Data Center",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Montgomery",
   "county": "Montgomery",
   "state": "AL",
   "latitude": 32.185,
   "longitude": -86.273,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 1500000000,
   "jobs_permanent": 100,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-05",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-montgomery-al"
  },
  {
   "id": "meta-stanton-springs-newton-ga",
   "name": "Meta Newton Data Center (Stanton Springs)",
   "operator": "Meta Platforms",
   "company": "meta",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Social Circle",
   "county": "Newton",
   "state": "GA",
   "latitude": 33.6551,
   "longitude": -83.7182,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Walton Electric Membership Corporation",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2021-03-14",
   "record_updated": "2026-08-28",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/meta-georgia-water-complaints",
   "profile_url": "https://suedatacenters.org/data-centers/meta-stanton-springs-newton-ga"
  },
  {
   "id": "meta-prineville-or",
   "name": "Meta Prineville Data Center Campus",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Prineville",
   "county": "Crook",
   "state": "OR",
   "latitude": 44.3042,
   "longitude": -120.8515,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 400,
   "land_acres": 240,
   "investment_usd": 2000000000,
   "jobs_permanent": 350,
   "jobs_construction": 1000,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Pacific Power (PacifiCorp)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2010",
   "record_updated": "2026-09-05",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-prineville-or"
  },
  {
   "id": "meta-anthem-tulsa-ok",
   "name": "Meta Project Anthem, Tulsa",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Tulsa",
   "county": "Tulsa",
   "state": "OK",
   "latitude": 36.14,
   "longitude": -95.88,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 340,
   "investment_usd": 1000000000,
   "jobs_permanent": 100,
   "jobs_construction": 1000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Public Service Company of Oklahoma (PSO)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-08-06",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-anthem-tulsa-ok"
  },
  {
   "id": "meta-prometheus-new-albany-oh",
   "name": "Meta Prometheus",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "New Albany",
   "county": "Licking",
   "state": "OH",
   "latitude": 40.092,
   "longitude": -82.836,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 1500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-08-08",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-prometheus-new-albany-oh"
  },
  {
   "id": "meta-rosemount-mn",
   "name": "Meta Rosemount Data Center",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Rosemount",
   "county": "Dakota",
   "state": "MN",
   "latitude": 44.74,
   "longitude": -93.115,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 75,
   "capacity_mw_operational": null,
   "land_acres": 280,
   "investment_usd": 800000000,
   "jobs_permanent": 100,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Xcel Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-03",
   "record_updated": "2026-08-24",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-rosemount-mn"
  },
  {
   "id": "meta-sarpy-springfield-ne",
   "name": "Meta Sarpy Campus (Springfield expansion)",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Springfield",
   "county": "Sarpy",
   "state": "NE",
   "latitude": 41.052,
   "longitude": -96.148,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 500,
   "investment_usd": 1500000000,
   "jobs_permanent": 300,
   "jobs_construction": 1300,
   "cooling_type": "evaporative",
   "water_reported_mgd": 0.073,
   "energy_source": "mixed",
   "utility": "Omaha Public Power District (OPPD)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-07",
   "record_updated": "2026-09-10",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-sarpy-springfield-ne"
  },
  {
   "id": "meta-temple-tx",
   "name": "Meta Temple Data Center",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Temple",
   "county": "Bell",
   "state": "TX",
   "latitude": 31.1399225,
   "longitude": -97.3812992,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 152,
   "land_acres": 386,
   "investment_usd": 1200000000,
   "jobs_permanent": 100,
   "jobs_construction": 1200,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-03",
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-temple-tx"
  },
  {
   "id": "metered-mining-hammond-wi",
   "name": "Metered Mining Hammond Bitcoin Mining Facility",
   "operator": "Metered Mining",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Hammond",
   "county": "St. Croix",
   "state": "WI",
   "latitude": 44.9639,
   "longitude": -92.4467,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 6,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/metered-mining-hammond-wi"
  },
  {
   "id": "metro-edge-imd1-chicago-il",
   "name": "Metro Edge IMD1",
   "operator": "Metro Edge Development Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Chicago",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.8639696,
   "longitude": -87.6749686,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 53,
   "capacity_mw_operational": null,
   "land_acres": 1.97,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 16070247,
   "announced_date": "2022-09-22",
   "record_updated": "2026-08-31",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/metro-edge-imd1-chicago-il"
  },
  {
   "id": "metrobloks-liberty-mo",
   "name": "Metrobloks Liberty Campus",
   "operator": "Metrobloks",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Liberty",
   "county": "Clay",
   "state": "MO",
   "latitude": 39.2459,
   "longitude": -94.4191,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 150,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/metrobloks-liberty-mo"
  },
  {
   "id": "metrobloks-martindale-brightwood-indianapolis-in",
   "name": "Metrobloks Martindale-Brightwood Data Center",
   "operator": "Metrobloks",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Indianapolis",
   "county": "Marion",
   "state": "IN",
   "latitude": 39.7975,
   "longitude": -86.1197,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 75,
   "capacity_mw_operational": null,
   "land_acres": 14,
   "investment_usd": 500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "AES Indiana",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/metrobloks-martindale-brightwood-indianapolis-in"
  },
  {
   "id": "metrobloks-mia-a1-miami-fl",
   "name": "Metrobloks MIA-A1 (MB01)",
   "operator": "Metrobloks",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Miami",
   "county": "Miami-Dade",
   "state": "FL",
   "latitude": 25.79,
   "longitude": -80.41,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 15.2,
   "capacity_mw_operational": null,
   "land_acres": 4.05,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-04",
   "record_updated": "2026-08-02",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/metrobloks-mia-a1-miami-fl"
  },
  {
   "id": "metrobloks-southfield-mi",
   "name": "Metrobloks Southfield Data Center",
   "operator": "Metrobloks",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Southfield",
   "county": "Oakland",
   "state": "MI",
   "latitude": 42.474,
   "longitude": -83.293,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 100,
   "capacity_mw_operational": null,
   "land_acres": 12.19,
   "investment_usd": null,
   "jobs_permanent": 35,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/metrobloks-southfield-mi"
  },
  {
   "id": "microsoft-alviso-san-jose-ca",
   "name": "Microsoft Alviso Data Center Campus",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "San Jose (Alviso)",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.428,
   "longitude": -121.977,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 48,
   "capacity_mw_operational": null,
   "land_acres": 65,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-06-10",
   "record_updated": "2026-07-25",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-alviso-san-jose-ca"
  },
  {
   "id": "microsoft-becker-mn",
   "name": "Microsoft Becker Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Becker",
   "county": "Sherburne",
   "state": "MN",
   "latitude": 45.3931821,
   "longitude": -93.8768904,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 295,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-becker-mn"
  },
  {
   "id": "microsoft-boydton-bn-campus-mecklenburg-va",
   "name": "Microsoft Boydton Campus (BN / Azure East US)",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Boydton",
   "county": "Mecklenburg",
   "state": "VA",
   "latitude": 36.65969,
   "longitude": -78.36487,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 2000000000,
   "jobs_permanent": 350,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 3,
   "subsidy_usd_known": 6900000,
   "announced_date": "2010-08",
   "record_updated": "2026-07-25",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-boydton-bn-campus-mecklenburg-va"
  },
  {
   "id": "microsoft-bristow-mnz03-va",
   "name": "Microsoft Bristow Data Center Campus (MNZ03)",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Bristow",
   "county": "Prince William",
   "state": "VA",
   "latitude": 38.728,
   "longitude": -77.56,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 83,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2021",
   "record_updated": "2026-07-17",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-bristow-mnz03-va"
  },
  {
   "id": "microsoft-cheyenne-expansion-wy",
   "name": "Microsoft Cheyenne Mega-Campus Expansion",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Cheyenne",
   "county": "Laramie",
   "state": "WY",
   "latitude": 41.09,
   "longitude": -104.79,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 3200,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Black Hills Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2026-04",
   "record_updated": "2026-08-19",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-cheyenne-expansion-wy"
  },
  {
   "id": "microsoft-columbia-quincy-wa",
   "name": "Microsoft Columbia Data Center (Quincy)",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Quincy",
   "county": "Grant",
   "state": "WA",
   "latitude": 47.2333,
   "longitude": -119.8667,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 270,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Grant County PUD",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-columbia-quincy-wa"
  },
  {
   "id": "microsoft-conover-catawba-county-nc",
   "name": "Microsoft Conover Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Conover",
   "county": "Catawba",
   "state": "NC",
   "latitude": 35.7065,
   "longitude": -81.2184,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 219,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-11",
   "record_updated": "2026-08-15",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-conover-catawba-county-nc"
  },
  {
   "id": "microsoft-firecracker-rome-ga",
   "name": "Microsoft Data Center Campus, Rome, GA",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Rome",
   "county": "Floyd",
   "state": "GA",
   "latitude": 34.27,
   "longitude": -85.16,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 347,
   "investment_usd": 1000000000,
   "jobs_permanent": 150,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2023",
   "record_updated": "2026-07-25",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-firecracker-rome-ga"
  },
  {
   "id": "microsoft-dorr-township-mi",
   "name": "Microsoft Dorr Township Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Dorr Township",
   "county": "Allegan",
   "state": "MI",
   "latitude": 42.64,
   "longitude": -85.652,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-dorr-township-mi"
  },
  {
   "id": "microsoft-douglasville-ga",
   "name": "Microsoft Douglasville Data Center Campus",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Douglasville",
   "county": "Douglas",
   "state": "GA",
   "latitude": 33.7547,
   "longitude": -84.7427,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 160,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2024-01",
   "record_updated": "2026-07-06",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-douglasville-ga"
  },
  {
   "id": "microsoft-east-wenatchee-wa",
   "name": "Microsoft East Wenatchee Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "East Wenatchee",
   "county": "Douglas",
   "state": "WA",
   "latitude": 47.407837,
   "longitude": -120.207723,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 180,
   "capacity_mw_operational": null,
   "land_acres": 340,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "PUD No 1 of Douglas County",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022",
   "record_updated": "2026-07-24",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-east-wenatchee-wa"
  },
  {
   "id": "microsoft-el-mirage-az",
   "name": "Microsoft El Mirage Data Center Campus",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "El Mirage",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.5695,
   "longitude": -112.3204,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 433,
   "investment_usd": 258000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Arizona Public Service (APS)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-10",
   "record_updated": "2026-08-08",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-el-mirage-az"
  },
  {
   "id": "microsoft-elk-grove-village-il",
   "name": "Microsoft Elk Grove Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Elk Grove Village",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.005,
   "longitude": -87.96,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 37,
   "investment_usd": 123000000,
   "jobs_permanent": 20,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 15750000,
   "announced_date": "2021",
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-elk-grove-village-il"
  },
  {
   "id": "microsoft-fairwater-fayetteville-ga",
   "name": "Microsoft Fairwater Atlanta (Azure AI Superfactory)",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Fayetteville",
   "county": "Fayette",
   "state": "GA",
   "latitude": 33.4487,
   "longitude": -84.4549,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1500,
   "capacity_mw_operational": null,
   "land_acres": 615,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-07-26",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-fairwater-fayetteville-ga"
  },
  {
   "id": "microsoft-gaines-township-mi",
   "name": "Microsoft Gaines Township Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Gaines Township",
   "county": "Kent",
   "state": "MI",
   "latitude": 42.802,
   "longitude": -85.571,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 316,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Consumers Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-gaines-township-mi"
  },
  {
   "id": "microsoft-goodyear-az",
   "name": "Microsoft Goodyear Data Center Campus",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Goodyear",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.4353,
   "longitude": -112.39,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 550,
   "investment_usd": 1500000000,
   "jobs_permanent": 100,
   "jobs_construction": 1000,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Arizona Public Service (APS)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2018-01",
   "record_updated": "2026-08-08",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-goodyear-az"
  },
  {
   "id": "microsoft-granger-in",
   "name": "Microsoft Granger Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Granger",
   "county": "St. Joseph",
   "state": "IN",
   "latitude": 41.73,
   "longitude": -86.13,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 939,
   "investment_usd": null,
   "jobs_permanent": 300,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Indiana Michigan Power (I&M / AEP)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-05-30",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-granger-in"
  },
  {
   "id": "microsoft-heath-oh",
   "name": "Microsoft Heath Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Heath",
   "county": "Licking",
   "state": "OH",
   "latitude": 40.015,
   "longitude": -82.46,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 227,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": 400,
   "cooling_type": "evaporative",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AEP Ohio",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2024-10",
   "record_updated": "2026-07-06",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-heath-oh"
  },
  {
   "id": "microsoft-hebron-oh",
   "name": "Microsoft Hebron Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Hebron",
   "county": "Licking",
   "state": "OH",
   "latitude": 40.01,
   "longitude": -82.5,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 223,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": 400,
   "cooling_type": "evaporative",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AEP Ohio",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2024-10",
   "record_updated": "2026-07-06",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-hebron-oh"
  },
  {
   "id": "microsoft-hickory-catawba-county-nc",
   "name": "Microsoft Hickory Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Hickory",
   "county": "Catawba",
   "state": "NC",
   "latitude": 35.7333,
   "longitude": -81.3443,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 160,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-11",
   "record_updated": "2026-08-15",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-hickory-catawba-county-nc"
  },
  {
   "id": "microsoft-hoffman-estates-il",
   "name": "Microsoft Hoffman Estates Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Hoffman Estates",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.0769632,
   "longitude": -88.1338875,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 53,
   "investment_usd": 275000000,
   "jobs_permanent": 20,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 17187500,
   "announced_date": "2021-03",
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-hoffman-estates-il"
  },
  {
   "id": "microsoft-irving-tx",
   "name": "Microsoft Irving Data Centers",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Irving",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.8295183,
   "longitude": -96.9442177,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-irving-tx"
  },
  {
   "id": "microsoft-kenosha-wi",
   "name": "Microsoft Kenosha Data Center Campus",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Kenosha",
   "county": "Kenosha",
   "state": "WI",
   "latitude": 42.537,
   "longitude": -87.89,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 240,
   "investment_usd": 35000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "We Energies (WEC Energy Group)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-01",
   "record_updated": "2026-07-25",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-kenosha-wi"
  },
  {
   "id": "microsoft-laporte-in",
   "name": "Microsoft La Porte Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "La Porte",
   "county": "La Porte",
   "state": "IN",
   "latitude": 41.595,
   "longitude": -86.735,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 489,
   "investment_usd": 1000000000,
   "jobs_permanent": 200,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "NIPSCO",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2024-06",
   "record_updated": "2026-07-24",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-laporte-in"
  },
  {
   "id": "microsoft-lowell-township-mi",
   "name": "Microsoft Lowell Township Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Lowell Township",
   "county": "Kent",
   "state": "MI",
   "latitude": 42.93,
   "longitude": -85.352,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-lowell-township-mi"
  },
  {
   "id": "microsoft-maiden-catawba-county-nc",
   "name": "Microsoft Maiden Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Maiden",
   "county": "Catawba",
   "state": "NC",
   "latitude": 35.5845,
   "longitude": -81.2255,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 292,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-11",
   "record_updated": "2026-08-15",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-maiden-catawba-county-nc"
  },
  {
   "id": "microsoft-malaga-wa",
   "name": "Microsoft Malaga Campus",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Malaga",
   "county": "Chelan",
   "state": "WA",
   "latitude": 47.23,
   "longitude": -120.2,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 288,
   "capacity_mw_operational": null,
   "land_acres": 102.5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": "Chelan County PUD",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-03",
   "record_updated": "2026-09-05",
   "source_count": 10,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-malaga-wa"
  },
  {
   "id": "microsoft-mount-pleasant-wi",
   "name": "Microsoft Mount Pleasant Data Center Campus",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Mount Pleasant",
   "county": "Racine",
   "state": "WI",
   "latitude": 42.7209,
   "longitude": -87.9023,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 1575,
   "investment_usd": 3300000000,
   "jobs_permanent": 550,
   "jobs_construction": 2300,
   "cooling_type": "hybrid",
   "water_reported_mgd": 0.702,
   "energy_source": "mixed",
   "utility": "We Energies",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2025-01",
   "record_updated": "2026-09-10",
   "source_count": 17,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/microsoft-mount-pleasant-noise-class-action",
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-mount-pleasant-wi"
  },
  {
   "id": "microsoft-northlake-il",
   "name": "Microsoft Northlake Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Northlake",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.9231062,
   "longitude": -87.9182633,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 15,
   "investment_usd": 388134927,
   "jobs_permanent": 20,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 24258433,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-northlake-il"
  },
  {
   "id": "microsoft-panhandle-road-mecklenburg-va",
   "name": "Microsoft Panhandle Road Campus (AVC17 expansion)",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Boydton",
   "county": "Mecklenburg",
   "state": "VA",
   "latitude": 36.6674,
   "longitude": -78.3897,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 490,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-06-04",
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-panhandle-road-mecklenburg-va"
  },
  {
   "id": "microsoft-pecos-tx",
   "name": "Microsoft Pecos Data Center Campus",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Pecos",
   "county": "Reeves",
   "state": "TX",
   "latitude": 31.42,
   "longitude": -103.49,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 2000,
   "capacity_mw_operational": null,
   "land_acres": 7000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": 6000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "Chevron/Energy Forge One LLC",
   "on_site_generation_mw": 2670,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-06",
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-pecos-tx"
  },
  {
   "id": "microsoft-person-county-roxboro-nc",
   "name": "Microsoft Person County Mega Park",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Roxboro",
   "county": "Person",
   "state": "NC",
   "latitude": 36.396,
   "longitude": -78.9828,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1385,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Duke Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-person-county-roxboro-nc"
  },
  {
   "id": "microsoft-alluvion-west-des-moines-ia",
   "name": "Microsoft Project Alluvion Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "West Des Moines",
   "county": "Polk",
   "state": "IA",
   "latitude": 41.5143718,
   "longitude": -93.7083034,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-alluvion-west-des-moines-ia"
  },
  {
   "id": "microsoft-ginger-east-ia",
   "name": "Microsoft Project Ginger East Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "West Des Moines",
   "county": "Polk",
   "state": "IA",
   "latitude": 41.5193146,
   "longitude": -93.7362003,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 146,
   "investment_usd": 358000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-ginger-east-ia"
  },
  {
   "id": "microsoft-ginger-west-ia",
   "name": "Microsoft Project Ginger West Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "West Des Moines",
   "county": "Polk",
   "state": "IA",
   "latitude": 41.551,
   "longitude": -93.782,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 188,
   "investment_usd": 1650000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "MidAmerican Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2021",
   "record_updated": "2026-08-21",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-ginger-west-ia"
  },
  {
   "id": "microsoft-mountain-west-des-moines-ia",
   "name": "Microsoft Project Mountain Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "West Des Moines",
   "county": "Dallas",
   "state": "IA",
   "latitude": 41.5385054,
   "longitude": -93.8253005,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-mountain-west-des-moines-ia"
  },
  {
   "id": "microsoft-osmium-west-des-moines-ia",
   "name": "Microsoft Project Osmium Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "West Des Moines",
   "county": "Warren",
   "state": "IA",
   "latitude": 41.500537,
   "longitude": -93.7755662,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-osmium-west-des-moines-ia"
  },
  {
   "id": "microsoft-ruthenium-west-des-moines-ia",
   "name": "Microsoft Project Ruthenium Data Center",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "West Des Moines",
   "county": "Madison",
   "state": "IA",
   "latitude": 41.4999095,
   "longitude": -93.8098423,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 132,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-ruthenium-west-des-moines-ia"
  },
  {
   "id": "microsoft-san-antonio-expansion-tx",
   "name": "Microsoft San Antonio SAT89/SAT90 Data Centers",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Castroville",
   "county": "Medina",
   "state": "TX",
   "latitude": 29.35,
   "longitude": -98.88,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 765000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-05",
   "record_updated": "2026-07-06",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-san-antonio-expansion-tx"
  },
  {
   "id": "microsoft-silver-springs-lyon-county-nv",
   "name": "Microsoft Silver Springs Data Center Campus",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Silver Springs",
   "county": "Lyon",
   "state": "NV",
   "latitude": 39.373597,
   "longitude": -119.2267443,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 274,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-29",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-silver-springs-lyon-county-nv"
  },
  {
   "id": "microsoft-skipwith-road-campus-mecklenburg-va",
   "name": "Microsoft Skipwith Road Campus (LYH03)",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Boydton",
   "county": "Mecklenburg",
   "state": "VA",
   "latitude": 36.6798,
   "longitude": -78.4194,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 369,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023",
   "record_updated": "2026-07-25",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-skipwith-road-campus-mecklenburg-va"
  },
  {
   "id": "microsoft-tunstall-road-hillcrest-mecklenburg-va",
   "name": "Microsoft Tunstall Road Campus (Hillcrest / AVC09)",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "South Hill",
   "county": "Mecklenburg",
   "state": "VA",
   "latitude": 36.74254,
   "longitude": -78.10265,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 132,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2021",
   "record_updated": "2026-07-25",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-tunstall-road-hillcrest-mecklenburg-va"
  },
  {
   "id": "microsoft-tyrone-ga",
   "name": "Microsoft Tyrone Campus (Project Rita)",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Tyrone",
   "county": "Fayette",
   "state": "GA",
   "latitude": 33.494,
   "longitude": -84.588,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 96,
   "capacity_mw_operational": null,
   "land_acres": 161,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-11",
   "record_updated": "2026-07-07",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-tyrone-ga"
  },
  {
   "id": "microsoft-van-meter-ia",
   "name": "Microsoft Van Meter Data Center (Vision Park)",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Van Meter",
   "county": "Dallas",
   "state": "IA",
   "latitude": 41.5332166,
   "longitude": -93.9548406,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 414,
   "investment_usd": 40000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-van-meter-ia"
  },
  {
   "id": "microsoft-fernley-nv",
   "name": "Microsoft Victory Logistics District Campus",
   "operator": "Microsoft",
   "company": "microsoft",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Fernley",
   "county": "Lyon",
   "state": "NV",
   "latitude": 39.6082,
   "longitude": -119.2169,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 300.7,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-04",
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/microsoft-fernley-nv"
  },
  {
   "id": "midcon-recovery-solutions-oklahoma-city-ok",
   "name": "MIDCON Recovery Solutions Data Center",
   "operator": "MIDCON Recovery Solutions",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Oklahoma City",
   "county": "Oklahoma County",
   "state": "OK",
   "latitude": 35.618,
   "longitude": -97.567,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/midcon-recovery-solutions-oklahoma-city-ok"
  },
  {
   "id": "dp-facilities-mineral-gap-wise-va",
   "name": "Mineral Gap Data Center",
   "operator": "DP Facilities",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Wise",
   "county": "Wise",
   "state": "VA",
   "latitude": 36.987,
   "longitude": -82.53,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 22,
   "investment_usd": 65000000,
   "jobs_permanent": 40,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": 3.6,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2015",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/dp-facilities-mineral-gap-wise-va"
  },
  {
   "id": "xai-minihard-memphis-tn",
   "name": "Minihard",
   "operator": "xAI",
   "company": "xai",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Memphis",
   "county": "Shelby",
   "state": "TN",
   "latitude": 34.9994934,
   "longitude": -90.0429461,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 659000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/xai-minihard-memphis-tn"
  },
  {
   "id": "miningstore-eldora-township-ia",
   "name": "MiningStore Eldora Township Site",
   "operator": "MiningStore",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "permitted",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Eldora",
   "county": "Hardin",
   "state": "IA",
   "latitude": 42.3622,
   "longitude": -93.0996,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 5,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Midland Power Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-14",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/miningstore-eldora-township-ia"
  },
  {
   "id": "miningstore-grundy-center-ia",
   "name": "MiningStore Grundy Center Facility",
   "operator": "MiningStore",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Grundy Center",
   "county": "Grundy",
   "state": "IA",
   "latitude": 42.37,
   "longitude": -92.925,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2019",
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/miningstore-grundy-center-ia"
  },
  {
   "id": "miningstore-st-anthony-ia",
   "name": "MiningStore St. Anthony Site",
   "operator": "MiningStore",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "St. Anthony",
   "county": "Marshall",
   "state": "IA",
   "latitude": 42.1355,
   "longitude": -93.1988,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-14",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "miningstore-union-township-hardin-ia",
   "name": "MiningStore Union Township Site",
   "operator": "MiningStore",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "permitted",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Union",
   "county": "Hardin",
   "state": "IA",
   "latitude": 42.2453,
   "longitude": -93.0788,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 5,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Midland Power Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-14",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/miningstore-union-township-hardin-ia"
  },
  {
   "id": "mlp-ventures-plymouth-township-conshohocken-pa",
   "name": "MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant)",
   "operator": "MLP Ventures",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Conshohocken",
   "county": "Montgomery",
   "state": "PA",
   "latitude": 40.086,
   "longitude": -75.312,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 66,
   "investment_usd": 9000000000,
   "jobs_permanent": 110,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-08-02",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mlp-ventures-plymouth-township-conshohocken-pa"
  },
  {
   "id": "nscale-monarch-mason-county-wv",
   "name": "Monarch Compute Campus",
   "operator": "Nscale",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Point Pleasant",
   "county": "Mason",
   "state": "WV",
   "latitude": 38.87,
   "longitude": -82.1,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 2000,
   "capacity_mw_operational": null,
   "land_acres": 2250,
   "investment_usd": 20000000000,
   "jobs_permanent": 645,
   "jobs_construction": 4375,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "Appalachian Power (AEP)",
   "on_site_generation_mw": 2000,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-03",
   "record_updated": "2026-09-10",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/nscale-monarch-mason-county-wv"
  },
  {
   "id": "monarch-data-center-yerington-nv",
   "name": "Monarch Data Center",
   "operator": "Copia Power",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Yerington",
   "county": "Lyon",
   "state": "NV",
   "latitude": 38.9855429,
   "longitude": -119.162989,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 505,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "NV Energy",
   "on_site_generation_mw": 500,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-07",
   "record_updated": "2026-09-11",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/monarch-data-center-yerington-nv"
  },
  {
   "id": "monticello-tech-park-frattalone-mn",
   "name": "Monticello Tech Park (Monticello Tech LLC / Frattalone)",
   "operator": "Frattalone Companies (via Monticello Tech, LLC)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Monticello",
   "county": "Wright",
   "state": "MN",
   "latitude": 45.298583,
   "longitude": -93.7994056,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 550,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/monticello-tech-park-frattalone-mn"
  },
  {
   "id": "tract-mooresville-nc",
   "name": "Mooresville Campus",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Mooresville",
   "county": "Iredell",
   "state": "NC",
   "latitude": 35.58,
   "longitude": -80.81,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 400,
   "investment_usd": null,
   "jobs_permanent": 195,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023",
   "record_updated": "2026-07-25",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-mooresville-nc"
  },
  {
   "id": "tract-morris-technology-park-il",
   "name": "Morris Technology Park",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Morris",
   "county": "Grundy",
   "state": "IL",
   "latitude": 41.36,
   "longitude": -88.43,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 343,
   "investment_usd": null,
   "jobs_permanent": 350,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-morris-technology-park-il"
  },
  {
   "id": "bitfarms-moses-lake-wa",
   "name": "Moses Lake Facility",
   "operator": "Bitfarms Ltd. (Keel Infrastructure Corp.)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Moses Lake",
   "county": "Grant",
   "state": "WA",
   "latitude": 47.1301,
   "longitude": -119.2781,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 18,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": "Grant County PUD",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2021-11-11",
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bitfarms-moses-lake-wa"
  },
  {
   "id": "db-stu-mount-orab-brown-oh",
   "name": "Mount Orab Mega-Site Data Center Campus",
   "operator": "DB Stu LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Mount Orab",
   "county": "Brown",
   "state": "OH",
   "latitude": 39.0275659,
   "longitude": -83.919652,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/db-stu-mount-orab-brown-oh"
  },
  {
   "id": "tract-mountain-road-technology-park-hanover-va",
   "name": "Mountain Road Technology Park",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": null,
   "county": "Hanover",
   "state": "VA",
   "latitude": 37.693493,
   "longitude": -77.53629,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 900,
   "capacity_mw_operational": null,
   "land_acres": 427,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": 2,
   "energy_source": "grid",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-08-16",
   "source_count": 10,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-mountain-road-technology-park-hanover-va"
  },
  {
   "id": "ms-solar-grid-data-new-orleans-east-la",
   "name": "MS Solar Grid Data (New Orleans East)",
   "operator": "MS Solar Grid Data",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "New Orleans",
   "county": "Orleans",
   "state": "LA",
   "latitude": 30.0406363,
   "longitude": -89.9786145,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ms-solar-grid-data-new-orleans-east-la"
  },
  {
   "id": "mudiita-ransom-township-lackawanna-pa",
   "name": "Mudiita Ransom Township Data Center Campus",
   "operator": "Mudiita Land Venture LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ransom Township",
   "county": "Lackawanna",
   "state": "PA",
   "latitude": 41.4483,
   "longitude": -75.7375,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 750,
   "capacity_mw_operational": null,
   "land_acres": 930,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07",
   "record_updated": "2026-08-17",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mudiita-ransom-township-lackawanna-pa"
  },
  {
   "id": "muncy-data-center-lycoming-county-pa",
   "name": "Muncy Data Center",
   "operator": "Danko Holdings II",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Muncy",
   "county": "Lycoming",
   "state": "PA",
   "latitude": 41.23,
   "longitude": -76.804,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PPL Electric",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-04",
   "record_updated": "2026-08-17",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/muncy-data-center-lycoming-county-pa"
  },
  {
   "id": "natelli-new-hill-nc",
   "name": "Natelli New Hill Digital Campus",
   "operator": "Natelli Holdings",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "New Hill",
   "county": "Wake",
   "state": "NC",
   "latitude": 35.6526,
   "longitude": -79.0033,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-03-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/natelli-new-hill-nc"
  },
  {
   "id": "natelli-vance-county-henderson-nc",
   "name": "Natelli Vance County Campus (proposed)",
   "operator": "Natelli Investments",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "rumored",
   "city": "Henderson",
   "county": "Vance",
   "state": "NC",
   "latitude": 36.3085,
   "longitude": -78.4709,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 113,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-18",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/natelli-vance-county-henderson-nc"
  },
  {
   "id": "nautilus-cryptomine-building-1-pa",
   "name": "Nautilus Cryptomine - Building 1",
   "operator": "Talen Energy",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Berwick (Salem Township)",
   "county": "Luzerne",
   "state": "PA",
   "latitude": 41.0826255,
   "longitude": -76.1514194,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/nautilus-cryptomine-building-1-pa"
  },
  {
   "id": "nautilus-millinocket-me",
   "name": "Nautilus Data Technologies Data Center (Former Great Northern Paper Mill / One North)",
   "operator": "Nautilus Data Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Millinocket",
   "county": "Penobscot",
   "state": "ME",
   "latitude": 45.6501257,
   "longitude": -68.7073294,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 60,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 300000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/nautilus-millinocket-me"
  },
  {
   "id": "ncar-wyoming-supercomputing-center-cheyenne-wy",
   "name": "NCAR-Wyoming Supercomputing Center",
   "operator": "University Corporation for Atmospheric Research (UCAR)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Cheyenne",
   "county": "Laramie",
   "state": "WY",
   "latitude": 41.1289,
   "longitude": -104.8974,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Cheyenne Light, Fuel and Power (Black Hills Corporation)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2012",
   "record_updated": "2026-09-02",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ncar-wyoming-supercomputing-center-cheyenne-wy"
  },
  {
   "id": "ne-edge-millstone-ct",
   "name": "NE Edge Millstone Nuclear Data Center",
   "operator": "NE Edge",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Waterford",
   "county": "New London",
   "state": "CT",
   "latitude": 41.3218,
   "longitude": -72.1582,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "nuclear",
   "utility": "Dominion Energy (Millstone Nuclear Power Station)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-01",
   "record_updated": "2026-07-06",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ne-edge-millstone-ct"
  },
  {
   "id": "nebius-independence-mo",
   "name": "Nebius AI Factory (Independence)",
   "operator": "Nebius Group",
   "company": "nebius",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Independence",
   "county": "Jackson",
   "state": "MO",
   "latitude": 39.089,
   "longitude": -94.342,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1200,
   "capacity_mw_operational": null,
   "land_acres": 400,
   "investment_usd": 6600000000,
   "jobs_permanent": 130,
   "jobs_construction": 1200,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Independence Power & Light (IPL)",
   "on_site_generation_mw": 250,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-03",
   "record_updated": "2026-08-24",
   "source_count": 11,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/independence-missouri-guard-alliance-data-center-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/nebius-independence-mo"
  },
  {
   "id": "nebius-bhm01-birmingham-al",
   "name": "Nebius Birmingham AI Factory (BHM01)",
   "operator": "Nebius Group",
   "company": "nebius",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Birmingham",
   "county": "Jefferson",
   "state": "AL",
   "latitude": 33.4556,
   "longitude": -86.8131,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 80,
   "investment_usd": null,
   "jobs_permanent": 100,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Alabama Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09-30",
   "record_updated": "2026-09-09",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/nebius-bhm01-birmingham-al"
  },
  {
   "id": "nebius-vineland-nj",
   "name": "Nebius Vineland Data Center",
   "operator": "Nebius Group",
   "company": "nebius",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Vineland",
   "county": "Cumberland",
   "state": "NJ",
   "latitude": 39.4862,
   "longitude": -74.992,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": 100,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "Vineland Municipal Utilities Authority (supplemental, ~15%)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-07-07",
   "source_count": 11,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/vineland-nebius-data-center-noise-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/nebius-vineland-nj"
  },
  {
   "id": "netrality-210-north-tucker-st-louis-mo",
   "name": "Netrality 210 North Tucker (St. Louis)",
   "operator": "Netrality Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "St. Louis",
   "county": "St. Louis city",
   "state": "MO",
   "latitude": 38.6292617,
   "longitude": -90.1971749,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/netrality-210-north-tucker-st-louis-mo"
  },
  {
   "id": "netrality-401-north-broad-philadelphia-pa",
   "name": "Netrality 401 North Broad",
   "operator": "Netrality Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Philadelphia",
   "county": "Philadelphia",
   "state": "PA",
   "latitude": 39.9601,
   "longitude": -75.1619,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-17",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "netrality-717-south-wells-il",
   "name": "Netrality 717 South Wells",
   "operator": "Netrality Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Chicago",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.8728811,
   "longitude": -87.63344,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/netrality-717-south-wells-il"
  },
  {
   "id": "netsonic-green-bay-wi",
   "name": "Netsonic Green Bay Data Center",
   "operator": "Netsonic (Dynamic Ventures LLC)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Green Bay",
   "county": "Brown County",
   "state": "WI",
   "latitude": 44.5155,
   "longitude": -87.995,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "neural-nexus-memphis-tn",
   "name": "Neural Nexus Innovation District",
   "operator": "Legacy Power Capital",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Memphis",
   "county": "Shelby",
   "state": "TN",
   "latitude": 35.1428067,
   "longitude": -90.0500147,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 9400000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/neural-nexus-memphis-tn"
  },
  {
   "id": "new-carlisle-chicago-trail-data-center-st-joseph-county-in",
   "name": "New Carlisle Chicago Trail Data Center (rezoning denied)",
   "operator": "Undisclosed",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "New Carlisle",
   "county": "St. Joseph",
   "state": "IN",
   "latitude": 41.7003,
   "longitude": -86.5089,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/new-carlisle-chicago-trail-data-center-st-joseph-county-in"
  },
  {
   "id": "newfold-digital-provo-ut",
   "name": "Newfold Digital Utah County Data Center",
   "operator": "Newfold Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Provo",
   "county": "Utah",
   "state": "UT",
   "latitude": 40.23373,
   "longitude": -111.65871,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 3,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/newfold-digital-provo-ut"
  },
  {
   "id": "newrays-one-bono-ar",
   "name": "NewRays One Bitcoin Mine",
   "operator": "NewRays One LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Bono",
   "county": "Faulkner",
   "state": "AR",
   "latitude": 35.256,
   "longitude": -92.476,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/newrays-one-bono-ar"
  },
  {
   "id": "nextnrg-nassau-county-data-center-energy-campus-fl",
   "name": "NextNRG Nassau County Data Center & Energy Campus",
   "operator": "NextNRG",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": null,
   "county": "Nassau",
   "state": "FL",
   "latitude": 30.55,
   "longitude": -81.68,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/nextnrg-nassau-county-data-center-energy-campus-fl"
  },
  {
   "id": "nexus-hubbard-campus-hill-county-tx",
   "name": "Nexus Hubbard Data Center & Power Campus",
   "operator": "Nexus Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Hubbard",
   "county": "Hill",
   "state": "TX",
   "latitude": 31.824001,
   "longitude": -96.776243,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 612,
   "capacity_mw_operational": null,
   "land_acres": 2000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": 612,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-25",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/nexus-hubbard-campus-hill-county-tx"
  },
  {
   "id": "niagara-digital-campus-niagara-falls-ny",
   "name": "Niagara Digital Campus",
   "operator": "Urbacon Data Centre Solutions",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Niagara Falls",
   "county": "Niagara",
   "state": "NY",
   "latitude": 43.0885,
   "longitude": -79.0603,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 135,
   "capacity_mw_operational": null,
   "land_acres": 142,
   "investment_usd": 1500000000,
   "jobs_permanent": 550,
   "jobs_construction": 5600,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": "New York Power Authority (NYPA)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/niagara-digital-campus-niagara-falls-ny"
  },
  {
   "id": "nine-mile-data-myton-duchesne-county-ut",
   "name": "Nine Mile Data Center (Uinta Basin Data Center Project)",
   "operator": "Nine Mile Data, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Myton",
   "county": "Duchesne",
   "state": "UT",
   "latitude": 40.193,
   "longitude": -110.0568,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 475,
   "investment_usd": 10000000000,
   "jobs_permanent": 200,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-04",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/nine-mile-data-myton-duchesne-county-ut"
  },
  {
   "id": "geronimo-nobles-county-powered-data-park-mn",
   "name": "Nobles County Powered Data Park",
   "operator": "Geronimo Power (Brookfield Asset Management subsidiary)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Worthington",
   "county": "Nobles",
   "state": "MN",
   "latitude": 43.62,
   "longitude": -95.6,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 400,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "wind",
   "utility": "City of Worthington",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/geronimo-nobles-county-powered-data-park-mn"
  },
  {
   "id": "nccs-massena-reynolds-ny",
   "name": "North Country Collocation Services Massena Data Center (former Reynolds site)",
   "operator": "North Country Collocation Services (NCCS)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Massena",
   "county": "St. Lawrence",
   "state": "NY",
   "latitude": 44.979,
   "longitude": -74.73,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 635,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/nccs-massena-reynolds-ny"
  },
  {
   "id": "aws-north-creek-technology-campus-louisa-va",
   "name": "North Creek Technology Campus (NCTC)",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Louisa",
   "county": "Louisa",
   "state": "VA",
   "latitude": 37.999666431819,
   "longitude": -77.967415971191,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 3000,
   "capacity_mw_operational": null,
   "land_acres": 816,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-11",
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-north-creek-technology-campus-louisa-va"
  },
  {
   "id": "northern-data-maysville-jackson-ga",
   "name": "Northern Data Maysville Data Center",
   "operator": "Northern Data Group",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Maysville",
   "county": "Jackson",
   "state": "GA",
   "latitude": 34.2527233,
   "longitude": -83.5613446,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/northern-data-maysville-jackson-ga"
  },
  {
   "id": "northern-data-pryor-ok",
   "name": "Northern Data North American Operational Center (Pryor), cancelled",
   "operator": "Northern Data AG",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Pryor",
   "county": "Mayes",
   "state": "OK",
   "latitude": 36.29167,
   "longitude": -95.31806,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022",
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/northern-data-pryor-ok"
  },
  {
   "id": "northmark-valara-spartanburg-sc",
   "name": "NorthMark Strategies Spartanburg High-Performance Computing Center",
   "operator": "Valara Holdings (NorthMark Strategies)",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Spartanburg",
   "county": "Spartanburg",
   "state": "SC",
   "latitude": 34.923066,
   "longitude": -81.851905,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 450,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 2800000000,
   "jobs_permanent": 27,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": 0.459,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/northmark-valara-spartanburg-sc"
  },
  {
   "id": "northpoint-fairfield-data-center-solano-ca",
   "name": "NorthPoint Fairfield Data Center (Vanden Road Industrial Campus)",
   "operator": "NorthPoint Development",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Fairfield",
   "county": "Solano",
   "state": "CA",
   "latitude": 38.2898329,
   "longitude": -121.9607882,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 150,
   "capacity_mw_operational": null,
   "land_acres": 300,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/northpoint-fairfield-data-center-solano-ca"
  },
  {
   "id": "nova-energy-cryptomine-frenchcreek-venango-county-pa",
   "name": "Nova Energy Natural Gas-Powered Cryptomine (Frenchcreek Township)",
   "operator": "Nova Energy LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Venango",
   "state": "PA",
   "latitude": 41.44,
   "longitude": -79.82,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-08",
   "record_updated": "2026-08-02",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/nova-energy-cryptomine-frenchcreek-venango-county-pa"
  },
  {
   "id": "novva-apex-industrial-park-north-las-vegas-nv",
   "name": "Novva Apex Industrial Park Data Center",
   "operator": "Novva Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "North Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.3291,
   "longitude": -114.9278,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 205,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-08",
   "record_updated": "2026-08-14",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/novva-apex-industrial-park-north-las-vegas-nv"
  },
  {
   "id": "novva-colorado-springs-co",
   "name": "Novva Colorado Springs Data Center",
   "operator": "Novva Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Colorado Springs",
   "county": "El Paso",
   "state": "CO",
   "latitude": 39.0130116,
   "longitude": -104.8164434,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 40,
   "land_acres": 68,
   "investment_usd": 200000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2021-08-31",
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/novva-colorado-springs-co"
  },
  {
   "id": "novva-las-vegas-nicco-way-nv",
   "name": "Novva Las Vegas Data Center",
   "operator": "Novva Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "North Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.266299,
   "longitude": -115.0478715,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 100,
   "land_acres": 20,
   "investment_usd": 400000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-09-13",
   "record_updated": "2026-09-11",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/novva-las-vegas-nicco-way-nv"
  },
  {
   "id": "novva-mesa-az",
   "name": "Novva Mesa Data Center Campus",
   "operator": "Novva Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Mesa",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.3717,
   "longitude": -111.6747,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 160,
   "investment_usd": 3000000000,
   "jobs_permanent": 200,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "Salt River Project (SRP)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-08",
   "record_updated": "2026-09-10",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/novva-mesa-az"
  },
  {
   "id": "novva-tahoe-reno-storey-county-nv",
   "name": "Novva Tahoe Reno Data Center",
   "operator": "Novva Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "McCarran",
   "county": "Storey",
   "state": "NV",
   "latitude": 39.53,
   "longitude": -119.44,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 60,
   "capacity_mw_operational": null,
   "land_acres": 20,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-07-08",
   "record_updated": "2026-08-14",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/novva-tahoe-reno-storey-county-nv"
  },
  {
   "id": "novva-west-jordan-ut",
   "name": "Novva West Jordan Campus",
   "operator": "Novva Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "West Jordan",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.57389,
   "longitude": -112.04576,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 175,
   "capacity_mw_operational": 200,
   "land_acres": 100,
   "investment_usd": 2000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-04",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/novva-west-jordan-ut"
  },
  {
   "id": "ntt-ashburn-va1-data-center-va",
   "name": "NTT Ashburn VA1 Data Center",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0227436,
   "longitude": -77.4548911,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 12.6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-ashburn-va1-data-center-va"
  },
  {
   "id": "ntt-ashburn-va2-data-center-va",
   "name": "NTT Ashburn VA2 Data Center",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0250127,
   "longitude": -77.4576402,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 14,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-ashburn-va2-data-center-va"
  },
  {
   "id": "ntt-ashburn-va5-data-center-va",
   "name": "NTT Ashburn VA5 Data Center",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0183033,
   "longitude": -77.472611,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 32,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-ashburn-va5-data-center-va"
  },
  {
   "id": "ntt-ashburn-va7-data-center-va",
   "name": "NTT Ashburn VA7 Data Center",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0160142,
   "longitude": -77.471954,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-ashburn-va7-data-center-va"
  },
  {
   "id": "ntt-ashburn-va8-data-center-va",
   "name": "NTT Ashburn VA8 Data Center",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0201893,
   "longitude": -77.475509,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 78,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-ashburn-va8-data-center-va"
  },
  {
   "id": "ntt-chicago-ch1-data-center-il",
   "name": "NTT Chicago CH1 Data Center",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Itasca",
   "county": "DuPage",
   "state": "IL",
   "latitude": 41.9879619,
   "longitude": -88.0072217,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 36,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-chicago-ch1-data-center-il"
  },
  {
   "id": "ntt-chicago-ch2-data-center-il",
   "name": "NTT Chicago CH2 Data Center",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Itasca",
   "county": "DuPage",
   "state": "IL",
   "latitude": 41.9890149,
   "longitude": -88.0072131,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 36,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-chicago-ch2-data-center-il"
  },
  {
   "id": "ntt-data-quincy-data-center-wa",
   "name": "NTT Data Quincy Data Center",
   "operator": "NTT DATA",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Quincy",
   "county": "Grant",
   "state": "WA",
   "latitude": 47.2435798,
   "longitude": -119.8657481,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PUD No 2 of Grant County",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-data-quincy-data-center-wa"
  },
  {
   "id": "ntt-global-data-centers-dallas-tx1-tx",
   "name": "NTT Global Data Centers Dallas TX1",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Garland",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.9810371,
   "longitude": -96.6563775,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-global-data-centers-dallas-tx1-tx"
  },
  {
   "id": "ntt-global-mesa-az",
   "name": "NTT Global Data Centers Mesa, Pacific Proving Technology Park",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Mesa",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.3025,
   "longitude": -111.62,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 360,
   "capacity_mw_operational": null,
   "land_acres": 173,
   "investment_usd": 300000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Salt River Project (SRP)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-11",
   "record_updated": "2026-08-08",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-global-mesa-az"
  },
  {
   "id": "ntt-hillsboro-hi1-data-center-or",
   "name": "NTT Hillsboro HI1 Data Center",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5496803,
   "longitude": -122.9373872,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 36,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Portland General Electric (PGE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-hillsboro-hi1-data-center-or"
  },
  {
   "id": "ntt-phoenix-ph1-data-center-az",
   "name": "NTT Phoenix PH1 Data Center",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Mesa",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.3536663,
   "longitude": -111.6124114,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 36,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-phoenix-ph1-data-center-az"
  },
  {
   "id": "ntt-sacramento-ca1-data-center-ca",
   "name": "NTT Sacramento CA1 Data Center",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sacramento",
   "county": "Sacramento",
   "state": "CA",
   "latitude": 38.6504319,
   "longitude": -121.4891868,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 12.6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "SMUD",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-sacramento-ca1-data-center-ca"
  },
  {
   "id": "ntt-sacramento-ca2-data-center-ca",
   "name": "NTT Sacramento CA2 Data Center",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sacramento",
   "county": "Sacramento",
   "state": "CA",
   "latitude": 38.6504002,
   "longitude": -121.4919461,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "SMUD",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-sacramento-ca2-data-center-ca"
  },
  {
   "id": "ntt-sacramento-ca3-data-center-ca",
   "name": "NTT Sacramento CA3 Data Center",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sacramento",
   "county": "Sacramento",
   "state": "CA",
   "latitude": 38.6442393,
   "longitude": -121.4987627,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "SMUD",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-sacramento-ca3-data-center-ca"
  },
  {
   "id": "ntt-silicon-valley-sv1-data-center-ca",
   "name": "NTT Silicon Valley SV1 Data Center",
   "operator": "NTT Global Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3690532,
   "longitude": -121.9553378,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 16,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ntt-silicon-valley-sv1-data-center-ca"
  },
  {
   "id": "nuvu-county-drive-petersburg-va",
   "name": "NuVu County Drive Data Center Campus",
   "operator": "NuVu Real Estate",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Petersburg",
   "county": null,
   "state": "VA",
   "latitude": 37.193,
   "longitude": -77.376,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 75,
   "investment_usd": 1100000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-01",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/nuvu-county-drive-petersburg-va"
  },
  {
   "id": "nydig-dfm-kraken-richland-mt",
   "name": "NYDIG DFM Kraken Central Site",
   "operator": "NYDIG DFM",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sidney vicinity (unincorporated)",
   "county": "Richland",
   "state": "MT",
   "latitude": 47.873,
   "longitude": -103.924,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-08-05",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/nydig-dfm-kraken-richland-mt"
  },
  {
   "id": "nyse-mahwah-data-center-nj",
   "name": "NYSE Data Center (Mahwah)",
   "operator": "New York Stock Exchange",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Mahwah",
   "county": "Bergen",
   "state": "NJ",
   "latitude": 41.078373,
   "longitude": -74.15293,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/nyse-mahwah-data-center-nj"
  },
  {
   "id": "doe-oak-ridge-reservation-ai-data-centers-tn",
   "name": "Oak Ridge Reservation AI Data Center Sites (DOE land lease)",
   "operator": "U.S. Department of Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Oak Ridge",
   "county": "Roane",
   "state": "TN",
   "latitude": 35.9352633,
   "longitude": -84.3923554,
   "coordinate_precision": "representative_multi_site",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09",
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/doe-oak-ridge-reservation-ai-data-centers-tn"
  },
  {
   "id": "oakland-university-computing-auburn-hills-mi",
   "name": "Oakland University Campus Computing Facility",
   "operator": "Fairmount Properties (with Oakland University)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Auburn Hills",
   "county": "Oakland",
   "state": "MI",
   "latitude": 42.675,
   "longitude": -83.215,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 26,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": 30,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "DTE Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/oakland-university-computing-auburn-hills-mi"
  },
  {
   "id": "verrus-oakline-mill-creek-salem-or",
   "name": "Oakline at Mill Creek",
   "operator": "Verrus",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Salem",
   "county": "Marion",
   "state": "OR",
   "latitude": 44.88315,
   "longitude": -122.96941,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 75,
   "investment_usd": 5100000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/verrus-oakline-mill-creek-salem-or"
  },
  {
   "id": "ocosa-321-south-boston-tulsa-ok",
   "name": "OCOSA Communications Tulsa Data Center (321 S Boston)",
   "operator": "OCOSA Communications",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tulsa",
   "county": "Tulsa County",
   "state": "OK",
   "latitude": 36.1535,
   "longitude": -95.9905,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ocosa-321-south-boston-tulsa-ok"
  },
  {
   "id": "okee-one-irsc-okeechobee-fl",
   "name": "Okee-One Data Center Campus",
   "operator": "Indian River State College",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Okeechobee",
   "county": "Okeechobee",
   "state": "FL",
   "latitude": 27.24667,
   "longitude": -80.83028,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 205,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/okee-one-irsc-okeechobee-fl"
  },
  {
   "id": "ls-power-old-ridge-road-hanover-va",
   "name": "Old Ridge Road Data Center Campus",
   "operator": "LS Power",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Doswell",
   "county": "Hanover",
   "state": "VA",
   "latitude": 37.859,
   "longitude": -77.4536,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 200,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "one-data-center-america-ontario-ca",
   "name": "One Data Center America (Ontario Campus)",
   "operator": "One Data Center America, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Ontario",
   "county": "San Bernardino",
   "state": "CA",
   "latitude": 34.0633,
   "longitude": -117.6509,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "oppidan-beaver-dam-edge-wi",
   "name": "Oppidan Beaver Dam Edge Data Center",
   "operator": "Oppidan Investment Company",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Beaver Dam",
   "county": "Dodge County",
   "state": "WI",
   "latitude": 43.4578,
   "longitude": -88.8373,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 14,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-02",
   "record_updated": "2026-09-01",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/oppidan-beaver-dam-edge-wi"
  },
  {
   "id": "oppidan-cedar-rapids-ia",
   "name": "Oppidan Cedar Rapids Data Center",
   "operator": "Oppidan",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Cedar Rapids",
   "county": "Linn",
   "state": "IA",
   "latitude": 41.9439273,
   "longitude": -91.6736877,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 10,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 100000000,
   "jobs_permanent": 15,
   "jobs_construction": 250,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07-08",
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/oppidan-cedar-rapids-ia"
  },
  {
   "id": "oppidan-des-moines-ia",
   "name": "Oppidan Des Moines Data Center",
   "operator": "Oppidan",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Des Moines",
   "county": "Polk",
   "state": "IA",
   "latitude": 41.5868,
   "longitude": -93.625,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-14",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/oppidan-des-moines-ia"
  },
  {
   "id": "oracle-elk-grove-village-il",
   "name": "Oracle Elk Grove Village Data Center",
   "operator": "Oracle",
   "company": "openai-oracle",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Elk Grove Village",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.0035588,
   "longitude": -88.0037711,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 555000000,
   "jobs_permanent": 20,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 34687500,
   "announced_date": "2025",
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/oracle-elk-grove-village-il"
  },
  {
   "id": "oracle-hillsboro-or",
   "name": "Oracle Hillsboro Data Center",
   "operator": "Oracle",
   "company": "openai-oracle",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5437211,
   "longitude": -122.8944315,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 7,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/oracle-hillsboro-or"
  },
  {
   "id": "oracle-salt-lake-city-ut",
   "name": "Oracle Salt Lake City",
   "operator": "Oracle",
   "company": "openai-oracle",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Salt Lake City",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.736391,
   "longitude": -112.005741,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/oracle-salt-lake-city-ut"
  },
  {
   "id": "oracle-west-jordan-ut",
   "name": "Oracle West Jordan Data Center (Project Sequoia)",
   "operator": "Oracle",
   "company": "openai-oracle",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "West Jordan",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.60613,
   "longitude": -111.93952,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/oracle-west-jordan-ut"
  },
  {
   "id": "orbitcom-coeurdalene-id",
   "name": "OrbitCom Coeur d'Alene Data Center",
   "operator": "OrbitCom",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Coeur d'Alene",
   "county": "Kootenai",
   "state": "ID",
   "latitude": 47.70069,
   "longitude": -116.79227,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "oregon-industrial-park-data-center-lucas-oh",
   "name": "Oregon Industrial Park Data Center Campus",
   "operator": "Capacity LLC (Vantage Data Centers named as prospective developer)",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Oregon",
   "county": "Lucas",
   "state": "OH",
   "latitude": 41.649,
   "longitude": -83.4614,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/oregon-industrial-park-data-center-lucas-oh"
  },
  {
   "id": "outrigger-washington-daviess-county-in",
   "name": "Outrigger Industrial Washington Data Center",
   "operator": "Outrigger Industrial",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Washington",
   "county": "Daviess",
   "state": "IN",
   "latitude": 38.65,
   "longitude": -87.05,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 120,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-03",
   "record_updated": "2026-08-05",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/outrigger-washington-daviess-county-in"
  },
  {
   "id": "brookfield-nextera-paducah-site-mccracken-ky",
   "name": "Paducah Site AI Data Center Campus",
   "operator": "Brookfield",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Kevil",
   "county": "McCracken",
   "state": "KY",
   "latitude": 37.11389,
   "longitude": -88.81028,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1800,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 100000000000,
   "jobs_permanent": 600,
   "jobs_construction": 8000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Big Rivers Electric Power Corporation / Jackson Purchase Energy Cooperative / Paducah Power System",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/brookfield-nextera-paducah-site-mccracken-ky"
  },
  {
   "id": "eagle-rock-pairmont-data-center-campus-spotsylvania-va",
   "name": "Pairmont Data Center Campus",
   "operator": "Eagle Rock Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Spotsylvania",
   "state": "VA",
   "latitude": 38.1791903850787,
   "longitude": -77.44283210846356,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 99.35,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Rappahannock Electric Co-op",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/eagle-rock-pairmont-data-center-campus-spotsylvania-va"
  },
  {
   "id": "panattoni-burgin-mercer-county-ky",
   "name": "Panattoni Burgin Data Center Campus",
   "operator": "Panattoni",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Burgin",
   "county": "Mercer",
   "state": "KY",
   "latitude": 37.75444,
   "longitude": -84.76333,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/panattoni-burgin-mercer-county-ky"
  },
  {
   "id": "panther-creek-hpc-ai-campus-nesquehoning-pa",
   "name": "Panther Creek HPC/AI Data Center Campus",
   "operator": "Bitfarms Ltd.",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Nesquehoning",
   "county": "Carbon",
   "state": "PA",
   "latitude": 40.8564,
   "longitude": -75.8283,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 350,
   "capacity_mw_operational": null,
   "land_acres": 103.95,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-08-05",
   "record_updated": "2026-09-12",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/panther-creek-hpc-ai-campus-nesquehoning-pa"
  },
  {
   "id": "bitfarms-panther-creek-nesquehoning-pa",
   "name": "Panther Creek Plant",
   "operator": "Bitfarms Ltd. (Keel Infrastructure Corp.)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Nesquehoning",
   "county": "Carbon",
   "state": "PA",
   "latitude": 40.8557,
   "longitude": -75.828,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 350,
   "capacity_mw_operational": 60,
   "land_acres": 320,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "other",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-04-02",
   "record_updated": "2026-08-02",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bitfarms-panther-creek-nesquehoning-pa"
  },
  {
   "id": "pathone-hull-ia",
   "name": "PathOne Sioux County Data Center (Hull)",
   "operator": "PathOne Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Hull",
   "county": "Sioux",
   "state": "IA",
   "latitude": 43.1888,
   "longitude": -96.1333,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 25,
   "capacity_mw_operational": null,
   "land_acres": 30,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "North West Rural Electric Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-14",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/pathone-hull-ia"
  },
  {
   "id": "patmos-fairfield-al",
   "name": "Patmos Fairfield Colocation Data Center",
   "operator": "Patmos",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Fairfield",
   "county": "Jefferson",
   "state": "AL",
   "latitude": 33.4916836,
   "longitude": -86.9150283,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": 50,
   "jobs_construction": 120,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/patmos-fairfield-al"
  },
  {
   "id": "patmos-kansas-city-mo",
   "name": "Patmos KC Star Building Campus",
   "operator": "Patmos Hosting",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Kansas City",
   "county": "Jackson",
   "state": "MO",
   "latitude": 39.0997,
   "longitude": -94.5786,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 35,
   "capacity_mw_operational": null,
   "land_acres": 5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/patmos-kansas-city-mo"
  },
  {
   "id": "buckley-bros-pawhuska-ok",
   "name": "Pawhuska AI Data Center",
   "operator": "Buckley Bros Holdings LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Pawhuska",
   "county": "Osage",
   "state": "OK",
   "latitude": 36.6698,
   "longitude": -96.3364,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 10,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/buckley-bros-pawhuska-ok"
  },
  {
   "id": "powerhouse-pax-carlisle-pa",
   "name": "PAX, Pennsylvania Digital I",
   "operator": "PowerHouse Data Centers",
   "company": "powerhouse-hillwood",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Carlisle",
   "county": "Cumberland",
   "state": "PA",
   "latitude": 40.2015,
   "longitude": -77.1889,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1350,
   "capacity_mw_operational": null,
   "land_acres": 700,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "PPL Electric Utilities",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-07",
   "record_updated": "2026-08-02",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/powerhouse-pax-carlisle-pa"
  },
  {
   "id": "trex-peakdigital-orofino-id",
   "name": "Peak Digital Solutions, Orofino Facility",
   "operator": "T-REX Acquisition Corp (Peak Digital Solutions LLC)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Orofino",
   "county": "Clearwater",
   "state": "ID",
   "latitude": 46.4794,
   "longitude": -116.254,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/trex-peakdigital-orofino-id"
  },
  {
   "id": "peak-mining-texas-1-corpus-christi-tx",
   "name": "Peak Mining Texas 1 (Saxet Energy Park)",
   "operator": "Peak Mining",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Corpus Christi",
   "county": "Nueces",
   "state": "TX",
   "latitude": 27.8487,
   "longitude": -97.4263,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": 100,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-12-11",
   "record_updated": "2026-08-05",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/peak-mining-texas-1-corpus-christi-tx"
  },
  {
   "id": "peak-mining-texas-2-corpus-christi-tx",
   "name": "Peak Mining Texas 2",
   "operator": "Peak Mining",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Corpus Christi",
   "county": "Nueces",
   "state": "TX",
   "latitude": 27.852,
   "longitude": -97.421,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-05-24",
   "record_updated": "2026-08-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/peak-mining-texas-2-corpus-christi-tx"
  },
  {
   "id": "pennhurst-data-center-east-vincent-chester-county-pa",
   "name": "Pennhurst Data Center Campus",
   "operator": "Penn Hurst Holdings",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Spring City",
   "county": "Chester",
   "state": "PA",
   "latitude": 40.193717,
   "longitude": -75.560162,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 125,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "PECO",
   "on_site_generation_mw": 550,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/pennhurst-data-center-east-vincent-chester-county-pa"
  },
  {
   "id": "percheron-data-center-or",
   "name": "Percheron Data Center",
   "operator": "Rowan Green Data (DBA Rowan Digital Infrastructure)",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Boardman area (Tower Road)",
   "county": "Morrow",
   "state": "OR",
   "latitude": 45.7113177,
   "longitude": -119.8262349,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 275,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PacifiCorp",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/percheron-data-center-or"
  },
  {
   "id": "tract-peru-shelf-storey-county-nv",
   "name": "Peru Shelf Technology Park",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Storey",
   "state": "NV",
   "latitude": 39.545801,
   "longitude": -119.497162,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 810,
   "capacity_mw_operational": null,
   "land_acres": 686,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-11",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-peru-shelf-storey-county-nv"
  },
  {
   "id": "philcade-data-center-tulsa-ok",
   "name": "Philcade Data Center",
   "operator": "Kanbar Properties",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tulsa",
   "county": "Tulsa County",
   "state": "OK",
   "latitude": 36.1516,
   "longitude": -95.9903,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "phoenixnap-phx02-phoenix-az",
   "name": "phoenixNAP PHX02",
   "operator": "phoenixNAP",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Phoenix",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.4165398,
   "longitude": -112.0116833,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": 6.54,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/phoenixnap-phx02-phoenix-az"
  },
  {
   "id": "pittock-block-portland-or",
   "name": "Pittock Block (PTOR1)",
   "operator": "1547 Critical Systems Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Portland",
   "county": "Multnomah",
   "state": "OR",
   "latitude": 45.5215436,
   "longitude": -122.680704,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 8,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "plan-c-crypto-fayetteville-cumberland-county-nc",
   "name": "Plan C Crypto Fayetteville (Dedication Drive)",
   "operator": "Plan C Crypto",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Fayetteville",
   "county": "Cumberland",
   "state": "NC",
   "latitude": 35.085,
   "longitude": -78.97722,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": 19,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Fayetteville Public Works Commission",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-02",
   "record_updated": "2026-08-29",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/plan-c-crypto-fayetteville-cumberland-county-nc"
  },
  {
   "id": "pnnl-ai-data-center-richland-wa",
   "name": "PNNL AI Data Center",
   "operator": "Battelle Memorial Institute (Pacific Northwest National Laboratory)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Richland",
   "county": "Benton",
   "state": "WA",
   "latitude": 46.348,
   "longitude": -119.279,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 2,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/pnnl-ai-data-center-richland-wa"
  },
  {
   "id": "pointone-lower-moncure-road-lee-county-nc",
   "name": "PointOne Lower Moncure Road Data Center (Lee County)",
   "operator": "PointOne",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Sanford",
   "county": "Lee",
   "state": "NC",
   "latitude": 35.48778,
   "longitude": -79.17833,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 90,
   "capacity_mw_operational": null,
   "land_acres": 428.85,
   "investment_usd": 900000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Central Electric Membership Corporation",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-06",
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/pointone-lower-moncure-road-lee-county-nc"
  },
  {
   "id": "polaris-technologies-muskogee-ok",
   "name": "Polaris Technologies Muskogee Bitcoin Mining Facility (\"Project Bifrost\")",
   "operator": "Polaris Technologies, Inc.",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Muskogee",
   "county": "Muskogee",
   "state": "OK",
   "latitude": 35.7479,
   "longitude": -95.3697,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 400,
   "capacity_mw_operational": 200,
   "land_acres": null,
   "investment_usd": 100000000,
   "jobs_permanent": 20,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Oklahoma Gas & Electric (OG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-08-06",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/polaris-technologies-muskogee-ok"
  },
  {
   "id": "poolside-project-horizon-pecos-county-tx",
   "name": "Poolside Project Horizon AI Campus",
   "operator": "Poolside AI",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Pecos",
   "state": "TX",
   "latitude": 30.8938,
   "longitude": -102.8796,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 2000,
   "capacity_mw_operational": null,
   "land_acres": 568,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": 2000,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/poolside-project-horizon-pecos-county-tx"
  },
  {
   "id": "google-port-of-little-rock-data-center-ar",
   "name": "Port of Little Rock Data Center",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Little Rock",
   "county": "Pulaski",
   "state": "AR",
   "latitude": 34.746,
   "longitude": -92.29,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 380,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-port-of-little-rock-data-center-ar"
  },
  {
   "id": "new-day-ports-technology-campus-piketon-oh",
   "name": "PORTS-Pike Technology Campus",
   "operator": "SB Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Piketon",
   "county": "Pike",
   "state": "OH",
   "latitude": 39.06,
   "longitude": -83.02,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 10000,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": 2000,
   "jobs_construction": 10000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "AEP Ohio",
   "on_site_generation_mw": 9200,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 12,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/new-day-ports-technology-campus-piketon-oh"
  },
  {
   "id": "potentia-oklahoma-campus-02-inola-ok",
   "name": "Potentia Oklahoma Campus 02 (Inola)",
   "operator": "Potentia, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Inola",
   "county": "Rogers County",
   "state": "OK",
   "latitude": 36.1487,
   "longitude": -95.5097,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 2000,
   "capacity_mw_operational": null,
   "land_acres": 1850,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05",
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/potentia-oklahoma-campus-02-inola-ok"
  },
  {
   "id": "amazon-potomac-church-fredericksburg-va",
   "name": "Potomac Church Technology Center",
   "operator": "Amazon Data Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Fredericksburg",
   "county": "Stafford",
   "state": "VA",
   "latitude": 38.411322338680904,
   "longitude": -77.4042471172777,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 49.9,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/amazon-potomac-church-fredericksburg-va"
  },
  {
   "id": "stonebridge-powder-mills-lawrence-county-pa",
   "name": "Powder Mills Data Center Campus",
   "operator": "Stonebridge Associates",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": null,
   "county": "Lawrence",
   "state": "PA",
   "latitude": 40.9915328,
   "longitude": -80.4272333,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 569,
   "investment_usd": 15000000000,
   "jobs_permanent": null,
   "jobs_construction": 3000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Penn Power (FirstEnergy)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stonebridge-powder-mills-lawrence-county-pa"
  },
  {
   "id": "powerhouse-95-spotsylvania-va",
   "name": "PowerHouse 95",
   "operator": "PowerHouse Data Centers",
   "company": "powerhouse-hillwood",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Spotsylvania",
   "county": "Spotsylvania",
   "state": "VA",
   "latitude": 38.17,
   "longitude": -77.66,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 800,
   "capacity_mw_operational": null,
   "land_acres": 145,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Rappahannock Electric Co-op",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-08-26",
   "source_count": 10,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/powerhouse-95-spotsylvania-va"
  },
  {
   "id": "powerhouse-abx-1-va",
   "name": "PowerHouse ABX-1",
   "operator": "PowerHouse Data Centers",
   "company": "powerhouse-hillwood",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0195992,
   "longitude": -77.4504568,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/powerhouse-abx-1-va"
  },
  {
   "id": "powerhouse-uhland-caldwell-county-tx",
   "name": "PowerHouse Caldwell County Data Center",
   "operator": "PowerHouse Data Centers",
   "company": "powerhouse-hillwood",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Uhland",
   "county": "Caldwell",
   "state": "TX",
   "latitude": 29.87,
   "longitude": -97.85,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 4000,
   "capacity_mw_operational": null,
   "land_acres": 500,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Bluebonnet Electric Cooperative (via Tract's Caldwell Valley Technology Park interconnection; LCRA also named for the park)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/powerhouse-uhland-caldwell-county-tx"
  },
  {
   "id": "powerhouse-charlotte-nc",
   "name": "PowerHouse Charlotte Campus",
   "operator": "PowerHouse Data Centers",
   "company": "powerhouse-hillwood",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Charlotte",
   "county": "Mecklenburg",
   "state": "NC",
   "latitude": 35.2271,
   "longitude": -80.8431,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 120,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Duke Energy Carolinas",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/powerhouse-charlotte-nc"
  },
  {
   "id": "powerhouse-circle-t-westlake-tx",
   "name": "PowerHouse Circle T Data Center Campus",
   "operator": "PowerHouse Data Centers",
   "company": "powerhouse-hillwood",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Westlake",
   "county": null,
   "state": "TX",
   "latitude": 32.9972,
   "longitude": -97.2083,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 87.96,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-08-07",
   "record_updated": "2026-09-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/powerhouse-circle-t-westlake-tx"
  },
  {
   "id": "powerhouse-ctp-02-va",
   "name": "PowerHouse CTP-02",
   "operator": "PowerHouse Data Centers",
   "company": "powerhouse-hillwood",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Chester",
   "county": "Chesterfield",
   "state": "VA",
   "latitude": 37.360586,
   "longitude": -77.3256869,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/powerhouse-ctp-02-va"
  },
  {
   "id": "powerhouse-louisville-ky",
   "name": "PowerHouse Data Centers, Louisville (Camp Ground Road)",
   "operator": "PowerHouse Data Centers",
   "company": "powerhouse-hillwood",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Louisville",
   "county": "Jefferson",
   "state": "KY",
   "latitude": 38.1953,
   "longitude": -85.8485,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 402,
   "capacity_mw_operational": null,
   "land_acres": 153,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "LG&E",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-01",
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/powerhouse-louisville-ky"
  },
  {
   "id": "powerhouse-provident-grand-prairie-tx",
   "name": "PowerHouse Grand Prairie Campus",
   "operator": "PowerHouse Data Centers",
   "company": "powerhouse-hillwood",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Grand Prairie",
   "county": "Ellis",
   "state": "TX",
   "latitude": 32.62,
   "longitude": -97.02,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1800,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Oncor",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-08",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/powerhouse-provident-grand-prairie-tx"
  },
  {
   "id": "powerhouse-reno-storey-county-nv",
   "name": "PowerHouse Reno Campus",
   "operator": "PowerHouse Data Centers",
   "company": "powerhouse-hillwood",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "McCarran",
   "county": "Storey",
   "state": "NV",
   "latitude": 39.5602824,
   "longitude": -119.4990959,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 65,
   "capacity_mw_operational": null,
   "land_acres": 49,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-10",
   "record_updated": "2026-08-29",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/powerhouse-reno-storey-county-nv"
  },
  {
   "id": "prado-ai-jackson-metro-ms",
   "name": "Prado AI / PraCon Global AI Industrial Campus",
   "operator": "PraCon Global Investment Group",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "rumored",
   "city": "Ridgeland",
   "county": "Madison",
   "state": "MS",
   "latitude": 32.4282,
   "longitude": -90.132,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-03",
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prado-ai-jackson-metro-ms"
  },
  {
   "id": "prime-lax01-vernon-ca",
   "name": "Prime Data Centers LAX01",
   "operator": "Prime Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Vernon",
   "county": "Los Angeles",
   "state": "CA",
   "latitude": 34.0014335,
   "longitude": -118.2303092,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 33,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Vernon Public Utilities",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prime-lax01-vernon-ca"
  },
  {
   "id": "prime-smf02-sacramento-ca",
   "name": "Prime Data Centers SMF02",
   "operator": "Prime Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Sacramento",
   "county": "Sacramento",
   "state": "CA",
   "latitude": 38.671,
   "longitude": -121.399,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 18,
   "capacity_mw_operational": null,
   "land_acres": 8.6,
   "investment_usd": null,
   "jobs_permanent": 30,
   "jobs_construction": 250,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Sacramento Municipal Utility District (SMUD)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05",
   "record_updated": "2026-07-06",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prime-smf02-sacramento-ca"
  },
  {
   "id": "prime-dfw01-01-tx",
   "name": "Prime DFW01-01",
   "operator": "Prime Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Dallas",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.8379581,
   "longitude": -96.8784007,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 8,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Oncor",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prime-dfw01-01-tx"
  },
  {
   "id": "prime-ord-elk-grove-village-il",
   "name": "Prime ORD Chicago Campus",
   "operator": "Prime Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Elk Grove Village",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.0224688,
   "longitude": -87.9621839,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 175,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-11-15",
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prime-ord-elk-grove-village-il"
  },
  {
   "id": "prime-santa-clara-silicon-valley-campus-ca",
   "name": "Prime Santa Clara (Silicon Valley campus)",
   "operator": "Prime Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3666621,
   "longitude": -121.9628653,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prime-santa-clara-silicon-valley-campus-ca"
  },
  {
   "id": "primeblock-murphy-cherokee-county-nc",
   "name": "PrimeBlock Murphy Bitcoin Mine (Harshaw Road)",
   "operator": "PrimeBlock",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Murphy",
   "county": "Cherokee",
   "state": "NC",
   "latitude": 35.0756,
   "longitude": -84.0235,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/primeblock-murphy-cherokee-county-nc"
  },
  {
   "id": "prince-william-digital-gateway-va",
   "name": "Prince William Digital Gateway",
   "operator": "QTS / Compass Datacenters",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Gainesville",
   "county": "Prince William",
   "state": "VA",
   "latitude": 38.8,
   "longitude": -77.68,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 2100,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy / NOVEC",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2021",
   "record_updated": "2026-09-10",
   "source_count": 10,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/prince-william-digital-gateway-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/prince-william-digital-gateway-va"
  },
  {
   "id": "crosland-southeast-matthews-project-accelerate-nc",
   "name": "Project Accelerate, Matthews (East John Street)",
   "operator": "Crosland Southeast",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Matthews",
   "county": "Mecklenburg",
   "state": "NC",
   "latitude": 35.1015,
   "longitude": -80.7082,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 600,
   "capacity_mw_operational": null,
   "land_acres": 123,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/crosland-southeast-matthews-project-accelerate-nc"
  },
  {
   "id": "volt-edge-project-alpaca-union-county-sc",
   "name": "Project Alpaca (Midway Green Industrial Park)",
   "operator": "Volt Edge Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Union",
   "county": "Union",
   "state": "SC",
   "latitude": 34.708932747649,
   "longitude": -81.662386821414,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 49,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 410000000,
   "jobs_permanent": 50,
   "jobs_construction": 500,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/volt-edge-project-alpaca-union-county-sc"
  },
  {
   "id": "project-altair-newberry-county-sc",
   "name": "Project Altair (Mid-Carolina Commerce Park II)",
   "operator": "Undisclosed developer (Project Altair)",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Prosperity",
   "county": "Newberry",
   "state": "SC",
   "latitude": 34.2098669,
   "longitude": -81.5338576,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/project-altair-newberry-county-sc"
  },
  {
   "id": "rcm-hill-project-aquila-hill-county-tx",
   "name": "Project Aquila",
   "operator": "RCM Hill, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": null,
   "county": "Hill",
   "state": "TX",
   "latitude": 32.03,
   "longitude": -97.13,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1235,
   "capacity_mw_operational": null,
   "land_acres": 800,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Brazos Electric Power Cooperative / Hilco Electric Cooperative (via Lone Star Transmission and ERCOT interconnection)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/rcm-hill-project-aquila-hill-county-tx"
  },
  {
   "id": "beale-project-atlas-coweta-ok",
   "name": "Project Atlas (Coweta), withdrawn",
   "operator": "Beale Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Coweta",
   "county": "Wagoner",
   "state": "OK",
   "latitude": 35.9526,
   "longitude": -95.6483,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 270,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/beale-project-atlas-coweta-ok"
  },
  {
   "id": "cde-acquisitions-project-atlas-south-whitehall-lehigh-pa",
   "name": "Project Atlas Data Center Campus (South Whitehall Township)",
   "operator": "CDE Acquisitions, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "South Whitehall Township",
   "county": "Lehigh",
   "state": "PA",
   "latitude": 40.6400848,
   "longitude": -75.5443246,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 410,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cde-acquisitions-project-atlas-south-whitehall-lehigh-pa"
  },
  {
   "id": "takanock-project-baccara-maricopa-county-az",
   "name": "Project Baccara",
   "operator": "Takanock, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": null,
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.5685,
   "longitude": -112.3703,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 700,
   "capacity_mw_operational": null,
   "land_acres": 160,
   "investment_usd": 36000000000,
   "jobs_permanent": 100,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "Arizona Public Service (APS)",
   "on_site_generation_mw": 700,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/takanock-project-baccara-maricopa-county-az"
  },
  {
   "id": "beale-project-blue-pima-county-az",
   "name": "Project Blue",
   "operator": "Beale Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": null,
   "county": "Pima",
   "state": "AZ",
   "latitude": 32.1,
   "longitude": -110.75,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 600,
   "capacity_mw_operational": null,
   "land_acres": 290,
   "investment_usd": 3600000000,
   "jobs_permanent": 180,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Tucson Electric Power (TEP)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 14,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/pima-county-project-blue-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/beale-project-blue-pima-county-az"
  },
  {
   "id": "project-boulder-colleton-county-sc",
   "name": "Project Boulder",
   "operator": "Eagle Rock Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": null,
   "county": "Colleton",
   "state": "SC",
   "latitude": 32.7,
   "longitude": -80.62,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 860,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy South Carolina",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/project-boulder-colleton-county-sc"
  },
  {
   "id": "taurus-digital-realty-project-bunkhouse-stilesboro-ga",
   "name": "Project Bunkhouse (Taurus/Digital Realty Data Center Campus)",
   "operator": "Taurus Investment Holdings (Taurus DC SPE LLC); to be managed by Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Stilesboro",
   "county": "Bartow",
   "state": "GA",
   "latitude": 34.087,
   "longitude": -84.91,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1830,
   "capacity_mw_operational": null,
   "land_acres": 876.57,
   "investment_usd": 19000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/taurus-digital-realty-project-bunkhouse-stilesboro-ga"
  },
  {
   "id": "atlas-project-bus-temple-ga",
   "name": "Project Bus (Atlas Development Temple Data Center Campus)",
   "operator": "Atlas Development LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Temple",
   "county": "Carroll",
   "state": "GA",
   "latitude": 33.7376,
   "longitude": -85.0327,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 350,
   "investment_usd": 11000000000,
   "jobs_permanent": 275,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-01-26",
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/atlas-project-bus-temple-ga"
  },
  {
   "id": "project-butterfly-ferguson-mo",
   "name": "Project Butterfly (former Emerson campus)",
   "operator": "SSL Investments / Next Revolution Technologies",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Ferguson",
   "county": "St. Louis",
   "state": "MO",
   "latitude": 38.7742,
   "longitude": -90.2626,
   "coordinate_precision": "address",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 217,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Ameren Missouri",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-03-14",
   "record_updated": "2026-09-11",
   "source_count": 7,
   "record_origin": "suedatacenters",
   "case_files": "https://suedatacenters.org/lawsuits/ferguson-missouri-project-butterfly-data-center-abatement",
   "profile_url": "https://suedatacenters.org/data-centers/project-butterfly-ferguson-mo"
  },
  {
   "id": "openai-project-camellia-effingham-ga",
   "name": "Project Camellia (OpenAI Effingham County Campus)",
   "operator": "OpenAI",
   "company": "openai-oracle",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Rincon",
   "county": "Effingham",
   "state": "GA",
   "latitude": 32.296,
   "longitude": -81.2354,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 3200,
   "capacity_mw_operational": null,
   "land_acres": 1400,
   "investment_usd": 20000000000,
   "jobs_permanent": 400,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-07-22",
   "record_updated": "2026-09-10",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/openai-project-camellia-effingham-ga"
  },
  {
   "id": "project-cannoli-van-buren-township-wayne-county-mi",
   "name": "Project Cannoli",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Van Buren Township",
   "county": "Wayne",
   "state": "MI",
   "latitude": 42.23,
   "longitude": -83.44,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "DTE Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 125000000,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/project-cannoli-van-buren-township-wayne-county-mi"
  },
  {
   "id": "project-cardinal-yorkville-il",
   "name": "Project Cardinal Data Center Campus",
   "operator": "Pioneer Development LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Yorkville",
   "county": "Kendall",
   "state": "IL",
   "latitude": 41.7,
   "longitude": -88.461,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1800,
   "capacity_mw_operational": null,
   "land_acres": 1037,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": 0.0425,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-03",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/project-cardinal-yorkville-il"
  },
  {
   "id": "cloverleaf-cherry-blossom-frenchtown-mi",
   "name": "Project Cherry Blossom",
   "operator": "Cloverleaf Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Frenchtown Township",
   "county": "Monroe",
   "state": "MI",
   "latitude": 41.988,
   "longitude": -83.386,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 200,
   "investment_usd": 1000000000,
   "jobs_permanent": 100,
   "jobs_construction": 1500,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "DTE Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cloverleaf-cherry-blossom-frenchtown-mi"
  },
  {
   "id": "beale-project-clydesdale-tulsa-county-ok",
   "name": "Project Clydesdale",
   "operator": "Beale Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Owasso",
   "county": "Tulsa",
   "state": "OK",
   "latitude": 36.28,
   "longitude": -95.83,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 506,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Public Service Company of Oklahoma (PSO)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/beale-project-clydesdale-tulsa-county-ok"
  },
  {
   "id": "cambrin-project-cornmaze-town-of-beloit-wi",
   "name": "Project Cornmaze Data Center (Town of Beloit)",
   "operator": "Cambrin LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Beloit",
   "county": "Rock",
   "state": "WI",
   "latitude": 42.5843885,
   "longitude": -89.0215921,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 430,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-07-15",
   "record_updated": "2026-08-18",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cambrin-project-cornmaze-town-of-beloit-wi"
  },
  {
   "id": "google-project-dazzler-franklin-furnace-oh",
   "name": "Project Dazzler",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Franklin Furnace",
   "county": "Scioto",
   "state": "OH",
   "latitude": 38.68,
   "longitude": -82.72,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 792,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "AEP Ohio",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-project-dazzler-franklin-furnace-oh"
  },
  {
   "id": "project-delta-walnut-cove-nc",
   "name": "Project Delta Data Center, Stokes County",
   "operator": "Undisclosed (rezoning applicant: Engineered Land Solutions)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Walnut Cove",
   "county": "Stokes",
   "state": "NC",
   "latitude": 36.282,
   "longitude": -80.1494,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1800,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "Duke Energy (Belews Creek proximity; no confirmed interconnection)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-07-06",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/stokes-county-project-delta-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/project-delta-walnut-cove-nc"
  },
  {
   "id": "crusoe-project-flash-franklin-va",
   "name": "Project Flash (Summit View Business Park)",
   "operator": "Crusoe",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Rocky Mount",
   "county": "Franklin",
   "state": "VA",
   "latitude": 36.9979,
   "longitude": -79.8922,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07-16",
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/crusoe-project-flash-franklin-va"
  },
  {
   "id": "verrus-project-flex-lyon-township-oakland-county-mi",
   "name": "Project Flex",
   "operator": "Verrus (Sidewalk Infrastructure Partners)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Lyon Township",
   "county": "Oakland",
   "state": "MI",
   "latitude": 42.47,
   "longitude": -83.53,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 180,
   "investment_usd": null,
   "jobs_permanent": 210,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "DTE Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/verrus-project-flex-lyon-township-oakland-county-mi"
  },
  {
   "id": "project-gravity-archbald-lackawanna-county-pa",
   "name": "Project Gravity",
   "operator": "Archbald 25 Developer LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Archbald",
   "county": "Lackawanna",
   "state": "PA",
   "latitude": 41.5,
   "longitude": -75.55,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 186,
   "investment_usd": 5000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PPL Electric",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/project-gravity-archbald-lackawanna-county-pa"
  },
  {
   "id": "project-hazelnut-hazle-township-pa",
   "name": "Project Hazelnut",
   "operator": "NorthPoint Development (NP Hazleton Holdings 1 LLC)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Hazle Township",
   "county": "Luzerne",
   "state": "PA",
   "latitude": 40.985,
   "longitude": -75.955,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1283,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PPL Electric",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-09-12",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/project-hazelnut-hazle-township-pa"
  },
  {
   "id": "shenandoah-project-kestrel-kc-northland-mo",
   "name": "Project Kestrel",
   "operator": "Shenandoah Computing LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Kansas City",
   "county": "Platte",
   "state": "MO",
   "latitude": 39.3470623,
   "longitude": -94.7038818,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 379,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Evergy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-08-26",
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/shenandoah-project-kestrel-kc-northland-mo"
  },
  {
   "id": "white-rose-project-kilo-south-elgin-il",
   "name": "Project Kilo Data Center (South Elgin)",
   "operator": "White Rose Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "South Elgin",
   "county": "Kane",
   "state": "IL",
   "latitude": 42.0007,
   "longitude": -88.2795,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 20,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/white-rose-project-kilo-south-elgin-il"
  },
  {
   "id": "meta-project-klondike-piqua-oh",
   "name": "Project Klondike",
   "operator": "Meta",
   "company": "meta",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Piqua",
   "county": "Miami",
   "state": "OH",
   "latitude": 40.103974,
   "longitude": -84.259053,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 607,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "AES Ohio",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/meta-project-klondike-piqua-oh"
  },
  {
   "id": "stream-data-centers-project-liberty-marion-county-sc",
   "name": "Project Liberty (Stream Data Centers, Marion County Industrial Park)",
   "operator": "Stream Data Centers (site entity: Eagle Myra, LLC)",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Marion",
   "county": "Marion",
   "state": "SC",
   "latitude": 34.1782,
   "longitude": -79.4006,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 400,
   "investment_usd": 2400000000,
   "jobs_permanent": 60,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stream-data-centers-project-liberty-marion-county-sc"
  },
  {
   "id": "western-hospitality-partners-project-lincoln-oldham-county-ky",
   "name": "Project Lincoln: OC Data Center",
   "operator": "Western Hospitality Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "La Grange",
   "county": "Oldham",
   "state": "KY",
   "latitude": 38.39861,
   "longitude": -85.375,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 600,
   "capacity_mw_operational": null,
   "land_acres": 267.3,
   "investment_usd": 6000000000,
   "jobs_permanent": 150,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/western-hospitality-partners-project-lincoln-oldham-county-ky"
  },
  {
   "id": "fermi-matador-amarillo-tx",
   "name": "Project Matador",
   "operator": "Fermi America",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Amarillo",
   "county": "Carson",
   "state": "TX",
   "latitude": 35.396,
   "longitude": -101.543,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 5769,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Xcel Energy (SPS)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-08-26",
   "source_count": 11,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fermi-matador-amarillo-tx"
  },
  {
   "id": "galaxy-digital-mcgregor-tx",
   "name": "Project Merlin (Helios II)",
   "operator": "Galaxy Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "McGregor",
   "county": "McLennan",
   "state": "TX",
   "latitude": 31.44,
   "longitude": -97.4,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 3500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 400000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-06-25",
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/galaxy-digital-mcgregor-tx"
  },
  {
   "id": "lpi-group-project-midway-casa-grande-az",
   "name": "Project Midway Data Center",
   "operator": "LPI Group",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Casa Grande",
   "county": "Pinal",
   "state": "AZ",
   "latitude": 32.84,
   "longitude": -111.79,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 400,
   "capacity_mw_operational": null,
   "land_acres": 215,
   "investment_usd": 6600000000,
   "jobs_permanent": 225,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11-19",
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/lpi-group-project-midway-casa-grande-az"
  },
  {
   "id": "beale-project-mustang-claremore-ok",
   "name": "Project Mustang",
   "operator": "Beale Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Claremore",
   "county": "Rogers",
   "state": "OK",
   "latitude": 36.31,
   "longitude": -95.62,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-17",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/beale-project-mustang-claremore-ok"
  },
  {
   "id": "project-oak-walt-sanders-road-coweta-ga",
   "name": "Project Oak Data Center (Walt Sanders Road)",
   "operator": "Undisclosed developer",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Newnan",
   "county": "Coweta",
   "state": "GA",
   "latitude": 33.4330945,
   "longitude": -84.7301816,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 255,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": 0.028,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/project-oak-walt-sanders-road-coweta-ga"
  },
  {
   "id": "cyrusone-project-peach-palmetto-ga",
   "name": "Project Peach (CyrusOne Palmetto Data Center Campus)",
   "operator": "CyrusOne (joint venture with North Coweta Investors)",
   "company": "cyrusone",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Palmetto",
   "county": "Coweta",
   "state": "GA",
   "latitude": 33.5182,
   "longitude": -84.6693,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 320,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-28",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cyrusone-project-peach-palmetto-ga"
  },
  {
   "id": "google-project-peanut-chester-va",
   "name": "Project Peanut",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Chester",
   "county": "Chesterfield",
   "state": "VA",
   "latitude": 37.34629075,
   "longitude": -77.29960686,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-08-28",
   "record_updated": "2026-07-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-project-peanut-chester-va"
  },
  {
   "id": "quiet-data-centers-enfield-halifax-county-nc",
   "name": "Project Q, Quiet Data Centers Enfield (Halifax County)",
   "operator": "Quiet Data Centers Halifax Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Enfield",
   "county": "Halifax",
   "state": "NC",
   "latitude": 36.18,
   "longitude": -77.66889,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 88,
   "capacity_mw_operational": null,
   "land_acres": 251,
   "investment_usd": 250000000,
   "jobs_permanent": 50,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": 0.0025,
   "energy_source": "grid",
   "utility": "Dominion",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/quiet-data-centers-enfield-halifax-county-nc"
  },
  {
   "id": "tract-project-range-buckeye-goodyear-az",
   "name": "Project Range",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Buckeye",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.435,
   "longitude": -112.512,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-28",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-project-range-buckeye-goodyear-az"
  },
  {
   "id": "cloverleaf-red-clay-lowndes-al",
   "name": "Project Red Clay",
   "operator": "Cloverleaf Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": null,
   "county": "Lowndes",
   "state": "AL",
   "latitude": 32.2700221,
   "longitude": -86.5128035,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1500,
   "capacity_mw_operational": null,
   "land_acres": 800,
   "investment_usd": 1500000000,
   "jobs_permanent": 50,
   "jobs_construction": 1000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Alabama Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cloverleaf-red-clay-lowndes-al"
  },
  {
   "id": "red-wolf-dcd-properties-project-red-wolf-ks",
   "name": "Project Red Wolf",
   "operator": "Red Wolf DCD Properties LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Kansas City",
   "county": "Wyandotte",
   "state": "KS",
   "latitude": 39.132358,
   "longitude": -94.88035,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 600,
   "capacity_mw_operational": null,
   "land_acres": 400,
   "investment_usd": 12000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/red-wolf-dcd-properties-project-red-wolf-ks"
  },
  {
   "id": "project-river-data-center-bradley-county-tn",
   "name": "Project River Data Center",
   "operator": "Wright Brothers Construction",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Cleveland",
   "county": "Bradley",
   "state": "TN",
   "latitude": 35.3314339,
   "longitude": -84.8686025,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 850,
   "investment_usd": 7300000000,
   "jobs_permanent": 525,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Tennessee Valley Authority",
   "on_site_generation_mw": 1500,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-08",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/project-river-data-center-bradley-county-tn"
  },
  {
   "id": "project-ruby-upatoi-muscogee-ga",
   "name": "Project Ruby (Upatoi Data Center Campus)",
   "operator": "Undisclosed end user (site pursued by Choose Columbus / Development Authority of Columbus)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Columbus",
   "county": "Muscogee",
   "state": "GA",
   "latitude": 32.5487503,
   "longitude": -84.7399283,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 600,
   "capacity_mw_operational": null,
   "land_acres": 865,
   "investment_usd": 5180000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/project-ruby-upatoi-muscogee-ga"
  },
  {
   "id": "prologis-project-sail-coweta-ga",
   "name": "Project Sail, Prologis Data Center Campus",
   "operator": "Prologis",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Newnan",
   "county": "Coweta",
   "state": "GA",
   "latitude": 33.3807,
   "longitude": -84.7974,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 900,
   "capacity_mw_operational": null,
   "land_acres": 800,
   "investment_usd": 17000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": 6,
   "energy_source": "grid",
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-04",
   "record_updated": "2026-07-06",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/coweta-project-sail-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/prologis-project-sail-coweta-ga"
  },
  {
   "id": "atlas-project-sassy-rome-ga",
   "name": "Project Sassy (Atlas Development Rome Campus)",
   "operator": "Atlas Development LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Rome",
   "county": "Floyd",
   "state": "GA",
   "latitude": 34.257,
   "longitude": -85.1647,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 178,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-01",
   "record_updated": "2026-08-28",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/atlas-project-sassy-rome-ga"
  },
  {
   "id": "project-shirley-eagle-creek-township-lake-county-in",
   "name": "Project Shirley",
   "operator": "Sentinel Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Eagle Creek Township",
   "county": "Lake",
   "state": "IN",
   "latitude": 41.31,
   "longitude": -87.3,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": 160,
   "investment_usd": 5000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "NIPSCO (via GenCo subsidiary)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/project-shirley-eagle-creek-township-lake-county-in"
  },
  {
   "id": "peterson-project-sisson-stafford-va",
   "name": "Project Sisson",
   "operator": "Peterson Companies",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Stafford",
   "state": "VA",
   "latitude": 38.287,
   "longitude": -77.39,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/peterson-project-sisson-stafford-va"
  },
  {
   "id": "google-project-skye-midlothian-va",
   "name": "Project Skye",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Midlothian",
   "county": "Chesterfield",
   "state": "VA",
   "latitude": 37.44741159,
   "longitude": -77.77600992,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 887.7,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-08-28",
   "record_updated": "2026-08-27",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-project-skye-midlothian-va"
  },
  {
   "id": "tigerdc-project-spero-spartanburg-county-sc",
   "name": "Project Spero (TigerDC), Tyger River Industrial Park",
   "operator": "TigerDC",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Spartanburg",
   "state": "SC",
   "latitude": 34.9109275,
   "longitude": -82.092603,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tigerdc-project-spero-spartanburg-county-sc"
  },
  {
   "id": "google-spring-sand-springs-ok",
   "name": "Project Spring (Sand Springs)",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Sand Springs",
   "county": "Osage",
   "state": "OK",
   "latitude": 36.256,
   "longitude": -96.11,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 827,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Public Service Company of Oklahoma (PSO)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-07-23",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/google-spring-sand-springs-ok"
  },
  {
   "id": "atlas-project-springbank-adairsville-ga",
   "name": "Project Springbank (Atlas Development Bartow County Campus)",
   "operator": "Atlas Development LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Adairsville",
   "county": "Bartow",
   "state": "GA",
   "latitude": 34.369,
   "longitude": -84.9341,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 432,
   "capacity_mw_operational": null,
   "land_acres": 588,
   "investment_usd": 4500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-02",
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/atlas-project-springbank-adairsville-ga"
  },
  {
   "id": "prologis-project-steel-yorkville-il",
   "name": "Project Steel Data Center Campus",
   "operator": "Prologis",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Yorkville",
   "county": "Kendall",
   "state": "IL",
   "latitude": 41.699,
   "longitude": -88.484,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 540,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-06",
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prologis-project-steel-yorkville-il"
  },
  {
   "id": "ryan-companies-project-swan-lakeland-fl",
   "name": "Project Swan",
   "operator": "Ryan Companies (end operator TBD)",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Lakeland",
   "county": "Polk",
   "state": "FL",
   "latitude": 28.0305,
   "longitude": -82.0054,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 60.5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ryan-companies-project-swan-lakeland-fl"
  },
  {
   "id": "takanock-project-tallmadge-strasburg-va",
   "name": "Project Tallmadge",
   "operator": "Takanock, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Strasburg",
   "county": "Shenandoah",
   "state": "VA",
   "latitude": 38.9893,
   "longitude": -78.3589,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 180,
   "capacity_mw_operational": null,
   "land_acres": 87,
   "investment_usd": null,
   "jobs_permanent": 50,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": 400,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-03",
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/takanock-project-tallmadge-strasburg-va"
  },
  {
   "id": "starwood-tamarack-west-columbia-mason-wv",
   "name": "Project Tamarack",
   "operator": "Starwood Digital Ventures",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "West Columbia",
   "county": "Mason",
   "state": "WV",
   "latitude": 38.9831343,
   "longitude": -82.0634753,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 2160,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 12000000000,
   "jobs_permanent": 300,
   "jobs_construction": 1000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Appalachian Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/starwood-tamarack-west-columbia-mason-wv"
  },
  {
   "id": "project-tango-loxahatchee-fl",
   "name": "Project Tango AI Data Center Campus",
   "operator": "PBA Holdings (end tenant undisclosed)",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Loxahatchee",
   "county": "Palm Beach",
   "state": "FL",
   "latitude": 26.6284,
   "longitude": -80.39,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 202,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Florida Power and Light",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-12",
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/project-tango-loxahatchee-fl"
  },
  {
   "id": "tallgrass-project-jade-cheyenne-wy",
   "name": "Project Tembo",
   "operator": "Google",
   "company": "google",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Cheyenne",
   "county": "Laramie",
   "state": "WY",
   "latitude": 41.12,
   "longitude": -104.82,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 2700,
   "capacity_mw_operational": null,
   "land_acres": 716,
   "investment_usd": null,
   "jobs_permanent": 400,
   "jobs_construction": 5000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "Black Hills Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-01",
   "record_updated": "2026-09-02",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tallgrass-project-jade-cheyenne-wy"
  },
  {
   "id": "project-turbo-okelly-road-gainesville-ga",
   "name": "Project Turbo (Gainesville Data Center)",
   "operator": "Project Turbo, LLC (developer; end user undisclosed)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Gainesville",
   "county": "Hall",
   "state": "GA",
   "latitude": 34.2246468,
   "longitude": -83.783998,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 119,
   "investment_usd": 1200000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/project-turbo-okelly-road-gainesville-ga"
  },
  {
   "id": "starwood-digital-project-washington-de",
   "name": "Project Washington (Starwood Digital Ventures)",
   "operator": "Starwood Digital Ventures",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Delaware City",
   "county": "New Castle",
   "state": "DE",
   "latitude": 39.578,
   "longitude": -75.593,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1200,
   "capacity_mw_operational": null,
   "land_acres": 580,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": 3500,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Delmarva Power & Light",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-07",
   "record_updated": "2026-07-06",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/starwood-digital-project-washington-de"
  },
  {
   "id": "project-west-lagrange-troup-ga",
   "name": "Project West (Troup County Data Center Campus)",
   "operator": "Undisclosed data center developer (landowner Joshua Harrelson)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "LaGrange",
   "county": "Troup",
   "state": "GA",
   "latitude": 33.039291,
   "longitude": -85.0313269,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 600,
   "capacity_mw_operational": null,
   "land_acres": 513,
   "investment_usd": 9700000000,
   "jobs_permanent": 570,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/project-west-lagrange-troup-ga"
  },
  {
   "id": "powertransitions-project-yardbird-ks",
   "name": "Project Yardbird",
   "operator": "PowerTransitions",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Kansas City",
   "county": "Wyandotte",
   "state": "KS",
   "latitude": 39.147,
   "longitude": -94.635,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-17",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/powertransitions-project-yardbird-ks"
  },
  {
   "id": "prologis-rue-ferrari-san-jose-ca",
   "name": "Prologis 5853 Rue Ferrari",
   "operator": "Prologis",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "San Jose",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.247993,
   "longitude": -121.778138,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 49,
   "capacity_mw_operational": null,
   "land_acres": 17.4,
   "investment_usd": 25000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Pacific Gas & Electric (PG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-12",
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prologis-rue-ferrari-san-jose-ca"
  },
  {
   "id": "prologis-allen-township-northampton-pa",
   "name": "Prologis Allen Township Data Center (2500 Liberty Drive)",
   "operator": "Prologis",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Allen Township",
   "county": "Northampton",
   "state": "PA",
   "latitude": 40.7017264,
   "longitude": -75.4801064,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prologis-allen-township-northampton-pa"
  },
  {
   "id": "prologis-mila-trenton-oh",
   "name": "Prologis Project Mila",
   "operator": "Prologis",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Trenton",
   "county": "Butler",
   "state": "OH",
   "latitude": 39.48,
   "longitude": -84.4638,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 250,
   "capacity_mw_operational": null,
   "land_acres": 141,
   "investment_usd": 233200000,
   "jobs_permanent": 120,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Duke Energy Ohio",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-08-16",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prologis-mila-trenton-oh"
  },
  {
   "id": "prologis-shelbyville-in",
   "name": "Prologis Shelbyville Data Center Campus",
   "operator": "Prologis",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Shelbyville",
   "county": "Shelby",
   "state": "IN",
   "latitude": 39.5214,
   "longitude": -85.7769,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 429,
   "investment_usd": 2000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prologis-shelbyville-in"
  },
  {
   "id": "prologis-silver-creek-valley-san-jose-ca",
   "name": "Prologis Silver Creek Valley Road Data Center",
   "operator": "Prologis",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Jose",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.25,
   "longitude": -121.79,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 99,
   "capacity_mw_operational": null,
   "land_acres": 15,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Pacific Gas & Electric (PG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07",
   "record_updated": "2026-07-25",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prologis-silver-creek-valley-san-jose-ca"
  },
  {
   "id": "prologis-stem-park-zanker-road-san-jose-ca",
   "name": "Prologis STEM Park",
   "operator": "Prologis",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "San Jose",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.423,
   "longitude": -121.943,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 396,
   "capacity_mw_operational": null,
   "land_acres": 159,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Pacific Gas & Electric (PG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-07-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prologis-stem-park-zanker-road-san-jose-ca"
  },
  {
   "id": "prometheus-hyperscale-evanston-wy",
   "name": "Prometheus Hyperscale Atlas Industrial Park Data Center Campus",
   "operator": "Prometheus Hyperscale",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Evanston",
   "county": "Uinta",
   "state": "WY",
   "latitude": 41.27,
   "longitude": -110.81,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1250,
   "capacity_mw_operational": null,
   "land_acres": 506,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "PacifiCorp",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-05",
   "record_updated": "2026-08-19",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prometheus-hyperscale-evanston-wy"
  },
  {
   "id": "prometheus-hyperscale-casper-wy",
   "name": "Prometheus Hyperscale Falls Ranch Data Center Campus",
   "operator": "Prometheus Hyperscale",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Glenrock",
   "county": "Converse",
   "state": "WY",
   "latitude": 42.87,
   "longitude": -106.15,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "PacifiCorp",
   "on_site_generation_mw": 1500,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-08-19",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prometheus-hyperscale-casper-wy"
  },
  {
   "id": "prometheus-hyperscale-fort-morgan-co",
   "name": "Prometheus Hyperscale Fort Morgan",
   "operator": "Prometheus Hyperscale",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Fort Morgan",
   "county": "Morgan",
   "state": "CO",
   "latitude": 40.2502582,
   "longitude": -103.799951,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prometheus-hyperscale-fort-morgan-co"
  },
  {
   "id": "prometheus-hyperscale-kaufman-county-tx",
   "name": "Prometheus Hyperscale Kaufman County Campus",
   "operator": "Prometheus Hyperscale",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Kaufman",
   "state": "TX",
   "latitude": 32.65,
   "longitude": -96.36,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": null,
   "land_acres": 500,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05-22",
   "record_updated": "2026-08-25",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prometheus-hyperscale-kaufman-county-tx"
  },
  {
   "id": "prometheus-hyperscale-pueblo-co",
   "name": "Prometheus Hyperscale Pueblo",
   "operator": "Prometheus Hyperscale",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Pueblo",
   "county": "Pueblo",
   "state": "CO",
   "latitude": 38.263995,
   "longitude": -104.6141867,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prometheus-hyperscale-pueblo-co"
  },
  {
   "id": "st-albans-data-center-vt",
   "name": "Proposed St. Albans, VT Data Center (Unbuilt)",
   "operator": "Unnamed developer",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "St. Albans",
   "county": "Franklin",
   "state": "VT",
   "latitude": 44.8107911,
   "longitude": -73.0833607,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "prsm-group-cumberland-county-nc",
   "name": "PRSM Group Cumberland County AI Data Center (undisclosed industrial park)",
   "operator": "PRSM Group",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": null,
   "county": "Cumberland",
   "state": "NC",
   "latitude": 35.0462,
   "longitude": -78.8394,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 225,
   "capacity_mw_operational": null,
   "land_acres": 50,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": 1500,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prsm-group-cumberland-county-nc"
  },
  {
   "id": "prsm-preble-county-oh",
   "name": "PRSM Preble County Data Center Campus",
   "operator": "PRSM Group",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Monroe Township",
   "county": "Preble",
   "state": "OH",
   "latitude": 39.8283325,
   "longitude": -84.6873978,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 270.34,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prsm-preble-county-oh"
  },
  {
   "id": "qlevr-charlestown-clark-county-in",
   "name": "QLEVR Charlestown Data Center",
   "operator": "QLEVR LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Charlestown",
   "county": "Clark",
   "state": "IN",
   "latitude": 38.4517,
   "longitude": -85.67,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 3,
   "capacity_mw_operational": null,
   "land_acres": 12,
   "investment_usd": 105000000,
   "jobs_permanent": 20,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qlevr-charlestown-clark-county-in"
  },
  {
   "id": "qts-ashburn-1-va",
   "name": "QTS Ashburn 1",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sterling",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 38.9995277,
   "longitude": -77.4501109,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 55,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-ashburn-1-va"
  },
  {
   "id": "qts-ashburn-2-ashburn-lockridge-va",
   "name": "QTS Ashburn 2 (Ashburn-Lockridge)",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sterling",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 38.9959297,
   "longitude": -77.4562445,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-ashburn-2-ashburn-lockridge-va"
  },
  {
   "id": "qts-atlanta-1-atlanta-metro-dc1-ga",
   "name": "QTS Atlanta 1 (Atlanta-Metro DC1)",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Atlanta",
   "county": "Fulton",
   "state": "GA",
   "latitude": 33.7776897,
   "longitude": -84.4211544,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 278,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-atlanta-1-atlanta-metro-dc1-ga"
  },
  {
   "id": "qts-aurora-co",
   "name": "QTS Aurora-Denver Data Center Campus (DEN1)",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Aurora",
   "county": "Arapahoe",
   "state": "CO",
   "latitude": 39.7113,
   "longitude": -104.7241,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 177,
   "capacity_mw_operational": null,
   "land_acres": 67,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Xcel Energy (Public Service Company of Colorado)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-05",
   "record_updated": "2026-08-08",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-aurora-co"
  },
  {
   "id": "qts-marvel-bessemer-al",
   "name": "QTS Bessemer (Project Marvel)",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Bessemer",
   "county": "Jefferson",
   "state": "AL",
   "latitude": 33.44,
   "longitude": -86.97,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1200,
   "capacity_mw_operational": null,
   "land_acres": 1607,
   "investment_usd": 14500000000,
   "jobs_permanent": 330,
   "jobs_construction": 1000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Alabama Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-09-09",
   "source_count": 15,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/bessemer-project-marvel-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/qts-marvel-bessemer-al"
  },
  {
   "id": "qts-cedar-rapids-ia",
   "name": "QTS Cedar Rapids Data Center Campus",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Cedar Rapids",
   "county": "Linn",
   "state": "IA",
   "latitude": 41.932,
   "longitude": -91.718,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1050,
   "capacity_mw_operational": null,
   "land_acres": 612,
   "investment_usd": 10000000000,
   "jobs_permanent": 30,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Alliant Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-02",
   "record_updated": "2026-07-18",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-cedar-rapids-ia"
  },
  {
   "id": "qts-chicago-1-il",
   "name": "QTS Chicago 1",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Chicago",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.8422152,
   "longitude": -87.6689701,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 250000000,
   "jobs_permanent": 20,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 15625000,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-chicago-1-il"
  },
  {
   "id": "qts-clinton-clinton-county-ia",
   "name": "QTS Clinton Data Center Campus",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Clinton",
   "county": "Clinton",
   "state": "IA",
   "latitude": 41.88,
   "longitude": -90.24,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1200,
   "investment_usd": 10000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-clinton-clinton-county-ia"
  },
  {
   "id": "qts-colorado-springs-co",
   "name": "QTS Colorado Springs Data Center",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Colorado Springs",
   "county": "El Paso",
   "state": "CO",
   "latitude": 38.9220674,
   "longitude": -104.8426568,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 14,
   "land_acres": 21,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "qts-dane-county-deforest-wi",
   "name": "QTS Dane County Hyperscale Campus (DeForest)",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "DeForest",
   "county": "Dane",
   "state": "WI",
   "latitude": 43.2428,
   "longitude": -89.3401,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 650,
   "investment_usd": 12000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Alliant Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10-30",
   "record_updated": "2026-07-25",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-dane-county-deforest-wi"
  },
  {
   "id": "qts-eagle-mountain-ut",
   "name": "QTS Eagle Mountain Data Center Campus",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Eagle Mountain",
   "county": "Utah",
   "state": "UT",
   "latitude": 40.3155,
   "longitude": -111.9847,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": null,
   "land_acres": 193,
   "investment_usd": 6000000000,
   "jobs_permanent": 100,
   "jobs_construction": 2000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Rocky Mountain Power (PacifiCorp)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2023",
   "record_updated": "2026-08-16",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-eagle-mountain-ut"
  },
  {
   "id": "qts-eagle-mountain-ii-fairfield-ut",
   "name": "QTS Eagle Mountain II",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Fairfield",
   "county": "Utah",
   "state": "UT",
   "latitude": 40.26217,
   "longitude": -112.093,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 650,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-eagle-mountain-ii-fairfield-ut"
  },
  {
   "id": "qts-hillsboro-1-or",
   "name": "QTS Hillsboro 1",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5588149,
   "longitude": -122.9277661,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 20,
   "land_acres": 25,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Portland General Electric (PGE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-hillsboro-1-or"
  },
  {
   "id": "qts-hillsboro-2-or",
   "name": "QTS Hillsboro 2",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.55888,
   "longitude": -122.92961,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 180,
   "capacity_mw_operational": null,
   "land_acres": 51,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "qts-hillsboro-3-or",
   "name": "QTS Hillsboro 3",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5719248,
   "longitude": -122.918438,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Portland General Electric (PGE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-hillsboro-3-or"
  },
  {
   "id": "qts-irving-1-tx",
   "name": "QTS Irving 1",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Irving",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.8972479,
   "longitude": -96.9826475,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 165,
   "capacity_mw_operational": null,
   "land_acres": 56,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-irving-1-tx"
  },
  {
   "id": "qts-mia1-sweetwater-fl",
   "name": "QTS Miami (MIA1)",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Sweetwater",
   "county": "Miami-Dade",
   "state": "FL",
   "latitude": 25.7915329,
   "longitude": -80.3795596,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2,
   "land_acres": 1,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-mia1-sweetwater-fl"
  },
  {
   "id": "qts-new-albany-1-franklin-county-oh",
   "name": "QTS New Albany 1",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "New Albany",
   "county": "Licking",
   "state": "OH",
   "latitude": 40.06378,
   "longitude": -82.75793,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 144,
   "capacity_mw_operational": null,
   "land_acres": 56,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-18",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-new-albany-1-franklin-county-oh"
  },
  {
   "id": "qts-new-albany-2-franklin-county-oh",
   "name": "QTS New Albany 2",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "New Albany",
   "county": "Licking",
   "state": "OH",
   "latitude": 40.05491,
   "longitude": -82.75685,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 78,
   "capacity_mw_operational": null,
   "land_acres": 37,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-18",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-new-albany-2-franklin-county-oh"
  },
  {
   "id": "qts-new-albany-3-franklin-county-oh",
   "name": "QTS New Albany III",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "New Albany",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.06965,
   "longitude": -82.77165,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 78,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2023-12",
   "record_updated": "2026-07-25",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-new-albany-3-franklin-county-oh"
  },
  {
   "id": "qts-new-albany-4-licking-county-oh",
   "name": "QTS New Albany IV",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "New Albany",
   "county": "Licking",
   "state": "OH",
   "latitude": 40.11064,
   "longitude": -82.74301,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 161,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2023-12",
   "record_updated": "2026-07-25",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-new-albany-4-licking-county-oh"
  },
  {
   "id": "qts-overland-park-ks",
   "name": "QTS Overland Park Data Center (OVP1)",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Overland Park",
   "county": "Johnson",
   "state": "KS",
   "latitude": 38.896635385342,
   "longitude": -94.673564928144,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-overland-park-ks"
  },
  {
   "id": "qts-phoenix-2-az",
   "name": "QTS Phoenix 2",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Phoenix",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.4644344,
   "longitude": -111.994808,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 210,
   "capacity_mw_operational": null,
   "land_acres": 80,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "qts-phoenix-4-tolleson-az",
   "name": "QTS Phoenix 4",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tolleson",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.420593,
   "longitude": -112.311771,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-phoenix-4-tolleson-az"
  },
  {
   "id": "qts-piscataway-1-nj",
   "name": "QTS Piscataway 1",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Piscataway",
   "county": "Middlesex",
   "state": "NJ",
   "latitude": 40.5569431,
   "longitude": -74.4839173,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 65,
   "land_acres": 38,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PSE&G",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-piscataway-1-nj"
  },
  {
   "id": "qts-blue-hole-blakely-ga",
   "name": "QTS Project Blue Hole",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Blakely",
   "county": "Early",
   "state": "GA",
   "latitude": 31.3763,
   "longitude": -84.9346,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-blue-hole-blakely-ga"
  },
  {
   "id": "qts-eisenhower-augusta-ga",
   "name": "QTS Project Eisenhower",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Augusta",
   "county": "Richmond",
   "state": "GA",
   "latitude": 33.4735,
   "longitude": -82.0105,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 170,
   "investment_usd": 2000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-25",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-eisenhower-augusta-ga"
  },
  {
   "id": "qts-richmond-1-dc1-ric1-white-oak-technology-park-va",
   "name": "QTS Richmond 1 DC1 (RIC1, White Oak Technology Park)",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sandston",
   "county": "Henrico",
   "state": "VA",
   "latitude": 37.4892338,
   "longitude": -77.2474761,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-richmond-1-dc1-ric1-white-oak-technology-park-va"
  },
  {
   "id": "qts-sacramento-ca",
   "name": "QTS Sacramento",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sacramento",
   "county": "Sacramento",
   "state": "CA",
   "latitude": 38.6463763,
   "longitude": -121.4862686,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 4,
   "land_acres": 7,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "SMUD",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-sacramento-ca"
  },
  {
   "id": "qts-salem-township-luzerne-pa",
   "name": "QTS Salem Township Data Center Campus (Salem 2)",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Salem Township",
   "county": "Luzerne",
   "state": "PA",
   "latitude": 41.1078249,
   "longitude": -76.1791155,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1700,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-salem-township-luzerne-pa"
  },
  {
   "id": "qts-santa-clara-1-ca",
   "name": "QTS Santa Clara 1",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3939862,
   "longitude": -121.9783207,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 7.5,
   "land_acres": 4,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-santa-clara-1-ca"
  },
  {
   "id": "qts-van-wert-oh",
   "name": "QTS Van Wert Data Center Campus",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Van Wert",
   "county": "Van Wert",
   "state": "OH",
   "latitude": 40.8696461,
   "longitude": -84.5829261,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 10000000000,
   "jobs_permanent": 200,
   "jobs_construction": 1500,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "American Electric Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05-29",
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-van-wert-oh"
  },
  {
   "id": "qts-white-oak-technology-park-ii-henrico-va",
   "name": "QTS White Oak Technology Park II (RIC5)",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Sandston",
   "county": "Henrico",
   "state": "VA",
   "latitude": 37.49,
   "longitude": -77.27,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 622,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-03",
   "record_updated": "2026-08-27",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-white-oak-technology-park-ii-henrico-va"
  },
  {
   "id": "qts-york-county-sc",
   "name": "QTS York County Data Center Campus",
   "operator": "QTS Data Centers",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": null,
   "county": "York",
   "state": "SC",
   "latitude": 35.0046528,
   "longitude": -81.1001847,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 173,
   "investment_usd": 1000000000,
   "jobs_permanent": 200,
   "jobs_construction": 1000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "York Electric Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": 200000,
   "announced_date": "2023-09-19",
   "record_updated": "2026-09-13",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-york-county-sc"
  },
  {
   "id": "qts-lancium-hall-county-tx",
   "name": "QTS-Lancium Hall County Data Center Campus",
   "operator": "QTS Data Centers / Lancium",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Turkey",
   "county": "Hall",
   "state": "TX",
   "latitude": 34.394,
   "longitude": -100.8954,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 10000000000,
   "jobs_permanent": 350,
   "jobs_construction": 7000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07-14",
   "record_updated": "2026-09-08",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qts-lancium-hall-county-tx"
  },
  {
   "id": "quantum-frederick-campus-md",
   "name": "Quantum Frederick",
   "operator": "TPG Real Estate Partners / Catellus Development Corporation",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Frederick",
   "county": "Frederick",
   "state": "MD",
   "latitude": 39.347656,
   "longitude": -77.493847,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 2100,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/quantum-frederick-campus-md"
  },
  {
   "id": "quantum-park-data-center-ashburn-loudoun-va",
   "name": "Quantum Park Data Center Expansion",
   "operator": "Quantum Park LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.011,
   "longitude": -77.464,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 40,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/quantum-park-data-center-ashburn-loudoun-va"
  },
  {
   "id": "quest-roseville-habc-ca",
   "name": "Quest Roseville HABC",
   "operator": "Quest Technology Management",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Roseville",
   "county": "Placer",
   "state": "CA",
   "latitude": 38.78829,
   "longitude": -121.313874,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "qumulusai-denton-tx",
   "name": "QumulusAI Denton Modular Data Center",
   "operator": "QumulusAI, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Denton",
   "county": "Denton",
   "state": "TX",
   "latitude": 33.2148,
   "longitude": -97.1331,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 20,
   "capacity_mw_operational": null,
   "land_acres": 4,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-01-01",
   "record_updated": "2026-08-25",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/qumulusai-denton-tx"
  },
  {
   "id": "rack59-oklahoma-city-ok",
   "name": "RACK59 Data Center",
   "operator": "RACK59",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Oklahoma City",
   "county": "Oklahoma",
   "state": "OK",
   "latitude": 35.4676,
   "longitude": -97.5164,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/rack59-oklahoma-city-ok"
  },
  {
   "id": "racksquared-columbus-oh",
   "name": "Racksquared Data Center (Columbus)",
   "operator": "Racksquared Data Centers, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Columbus",
   "county": "Franklin",
   "state": "OH",
   "latitude": 39.966878,
   "longitude": -82.992615,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "radius-dc-raleigh-1-wake-county-nc",
   "name": "Radius DC Raleigh I",
   "operator": "Undisclosed (annexation petitioner: Radius DC Raleigh I)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Raleigh",
   "county": "Wake",
   "state": "NC",
   "latitude": 35.7289,
   "longitude": -78.5776,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 13.646,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/radius-dc-raleigh-1-wake-county-nc"
  },
  {
   "id": "radiusdc-miami-i-sweetwater-fl",
   "name": "RadiusDC Miami I",
   "operator": "RadiusDC",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Sweetwater",
   "county": "Miami-Dade",
   "state": "FL",
   "latitude": 25.7871,
   "longitude": -80.3839,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 9.2,
   "capacity_mw_operational": 3.2,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/radiusdc-miami-i-sweetwater-fl"
  },
  {
   "id": "radiusdc-nashville-i-tn",
   "name": "RadiusDC Nashville I",
   "operator": "RadiusDC",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Nashville",
   "county": "Davidson",
   "state": "TN",
   "latitude": 36.27987,
   "longitude": -86.7837,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 12,
   "capacity_mw_operational": null,
   "land_acres": 12,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/radiusdc-nashville-i-tn"
  },
  {
   "id": "raeden-taurus-colorado-springs-co",
   "name": "Raeden Project Taurus",
   "operator": "Raeden",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Colorado Springs",
   "county": "El Paso",
   "state": "CO",
   "latitude": 38.8339,
   "longitude": -104.8214,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Colorado Springs Utilities",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/raeden-taurus-colorado-springs-co"
  },
  {
   "id": "ranalli-lysander-ny",
   "name": "Ranalli Lysander Data Center",
   "operator": "Ranalli",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "rumored",
   "city": "Lysander",
   "county": "Onondaga",
   "state": "NY",
   "latitude": 43.17,
   "longitude": -76.39,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 120,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "National Grid",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ranalli-lysander-ny"
  },
  {
   "id": "rb-inyokern-data-center-ca",
   "name": "RB Inyokern Data Center",
   "operator": "R&L Capital, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Inyokern",
   "county": "Kern",
   "state": "CA",
   "latitude": 35.631817,
   "longitude": -117.807864,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 99,
   "capacity_mw_operational": null,
   "land_acres": 55.54,
   "investment_usd": 250000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Southern California Edison (SCE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05-08",
   "record_updated": "2026-08-02",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/rb-inyokern-data-center-ca"
  },
  {
   "id": "red-ace-data-center-culpeper-va",
   "name": "Red Ace Data Center",
   "operator": "Red Ace Capital Management",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Culpeper",
   "county": "Culpeper",
   "state": "VA",
   "latitude": 38.474,
   "longitude": -77.997,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 69.19,
   "investment_usd": 350000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/red-ace-data-center-culpeper-va"
  },
  {
   "id": "brightnight-red-butte-newcastle-ut",
   "name": "Red Butte Energy and Data Center Campus",
   "operator": "BrightNight",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Newcastle",
   "county": "Iron",
   "state": "UT",
   "latitude": 37.6949,
   "longitude": -113.943,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1500,
   "capacity_mw_operational": null,
   "land_acres": 2600,
   "investment_usd": null,
   "jobs_permanent": 500,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/brightnight-red-butte-newcastle-ut"
  },
  {
   "id": "compass-red-oak-tx",
   "name": "Red Oak Campus",
   "operator": "Compass Datacenters",
   "company": "qts-compass",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Red Oak",
   "county": "Ellis",
   "state": "TX",
   "latitude": 32.537981,
   "longitude": -96.804371,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 600000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/compass-red-oak-tx"
  },
  {
   "id": "databank-red-oak-tx",
   "name": "Red Oak Campus",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Red Oak",
   "county": "Ellis",
   "state": "TX",
   "latitude": 32.5135,
   "longitude": -96.7282,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 480,
   "capacity_mw_operational": null,
   "land_acres": 292,
   "investment_usd": 837000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-09-10",
   "record_updated": "2026-09-08",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/databank-red-oak-tx"
  },
  {
   "id": "redivider-homestead-speedway-fl",
   "name": "Redivider Homestead Bitcoin Mining Facility",
   "operator": "Redivider Blockchain (joint venture with Esperanza Opportunity Fund)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Homestead",
   "county": "Miami-Dade",
   "state": "FL",
   "latitude": 25.451752,
   "longitude": -80.40943,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 10,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 15000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/redivider-homestead-speedway-fl"
  },
  {
   "id": "regence-salt-lake-city-ut",
   "name": "Regence BlueCross BlueShield Salt Lake City Data Center",
   "operator": "Regence BlueCross BlueShield",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Cottonwood Heights",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.633117,
   "longitude": -111.809456,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/regence-salt-lake-city-ut"
  },
  {
   "id": "related-digital-cheyenne-wy",
   "name": "Related Digital Cheyenne Data Center Campus",
   "operator": "Related Digital",
   "company": "related-digital",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Cheyenne",
   "county": "Laramie",
   "state": "WY",
   "latitude": 41.13,
   "longitude": -104.735,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 302,
   "capacity_mw_operational": null,
   "land_acres": 115,
   "investment_usd": 1200000000,
   "jobs_permanent": 40,
   "jobs_construction": 700,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Black Hills Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-10-07",
   "record_updated": "2026-09-02",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/related-digital-cheyenne-wy"
  },
  {
   "id": "rellis-data-research-center-bryan-brazos-county-tx",
   "name": "RELLIS Data and Research Center",
   "operator": "ThisWay Global, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Bryan",
   "county": "Brazos",
   "state": "TX",
   "latitude": 30.6013,
   "longitude": -96.3589,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 700000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-25",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/rellis-data-research-center-bryan-brazos-county-tx"
  },
  {
   "id": "pointone-remington-technology-park-fauquier-va",
   "name": "Remington Technology Park",
   "operator": "PointOne Holdings Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Remington",
   "county": "Fauquier",
   "state": "VA",
   "latitude": 38.53,
   "longitude": -77.8,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 600,
   "capacity_mw_operational": null,
   "land_acres": 234,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/pointone-remington-technology-park-fauquier-va"
  },
  {
   "id": "renaissance-park-upper-merion-king-of-prussia-pa",
   "name": "Renaissance Park and Innovation Data Center Campus",
   "operator": "MLP Ventures",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "King of Prussia",
   "county": "Montgomery",
   "state": "PA",
   "latitude": 40.092,
   "longitude": -75.347,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": 1000,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05",
   "record_updated": "2026-08-17",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/renaissance-park-upper-merion-king-of-prussia-pa"
  },
  {
   "id": "revolve-labs-glencoe-mn",
   "name": "Revolve Labs Glencoe",
   "operator": "Revolve Labs",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Glencoe",
   "county": "McLeod",
   "state": "MN",
   "latitude": 44.7691,
   "longitude": -94.1497,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 20,
   "capacity_mw_operational": null,
   "land_acres": 6.2,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/revolve-labs-glencoe-mn"
  },
  {
   "id": "revolve-labs-moose-lake-mn",
   "name": "Revolve Labs Moose Lake (withdrawn)",
   "operator": "Revolve Labs",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Moose Lake",
   "county": "Carlton",
   "state": "MN",
   "latitude": 46.4543725,
   "longitude": -92.761976,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/revolve-labs-moose-lake-mn"
  },
  {
   "id": "revolve-labs-windom-mn",
   "name": "Revolve Labs Windom (withdrawn)",
   "operator": "Revolve Labs",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Windom",
   "county": "Cottonwood",
   "state": "MN",
   "latitude": 43.8663464,
   "longitude": -95.1169366,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/revolve-labs-windom-mn"
  },
  {
   "id": "fundamental-data-ridgeline-datacenter-tucker-county-wv",
   "name": "Ridgeline Data Center",
   "operator": "Fundamental Data LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": null,
   "county": "Tucker",
   "state": "WV",
   "latitude": 39.1517,
   "longitude": -79.4913,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/fundamental-data-ridgeline-datacenter-tucker-county-wv"
  },
  {
   "id": "riot-calvert-city-marshall-ky",
   "name": "Riot Platforms Calvert City Facility",
   "operator": "Riot Platforms",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Calvert City",
   "county": "Marshall",
   "state": "KY",
   "latitude": 37.0334,
   "longitude": -88.35,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 25,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-17",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/riot-calvert-city-marshall-ky"
  },
  {
   "id": "riot-platforms-corsicana-tx",
   "name": "Riot Platforms Corsicana Facility",
   "operator": "Riot Platforms",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Corsicana",
   "county": "Navarro",
   "state": "TX",
   "latitude": 32.09,
   "longitude": -96.47,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": 400,
   "land_acres": 858,
   "investment_usd": 640000000,
   "jobs_permanent": 140,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-01",
   "record_updated": "2026-07-06",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/riot-platforms-corsicana-tx"
  },
  {
   "id": "riot-paducah-mccracken-ky",
   "name": "Riot Platforms Paducah Facility",
   "operator": "Riot Platforms",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Paducah",
   "county": "McCracken",
   "state": "KY",
   "latitude": 37.089242,
   "longitude": -88.703071,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 100,
   "capacity_mw_operational": 35,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-18",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/riot-paducah-mccracken-ky"
  },
  {
   "id": "riot-platforms-rockdale-tx",
   "name": "Riot Platforms Whinstone Facility",
   "operator": "Riot Platforms",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Rockdale",
   "county": "Milam",
   "state": "TX",
   "latitude": 30.6549,
   "longitude": -97.0025,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 750,
   "capacity_mw_operational": 450,
   "land_acres": null,
   "investment_usd": 651000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/riot-platforms-rockdale-tx"
  },
  {
   "id": "riverview-innovation-tech-campus-tonawanda-ny",
   "name": "Riverview Innovation & Technology Campus",
   "operator": "Riverview Innovation & Technology Campus",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Tonawanda",
   "county": "Erie",
   "state": "NY",
   "latitude": 43.037,
   "longitude": -78.887,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 140,
   "investment_usd": 2000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "National Grid",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/riverview-innovation-tech-campus-tonawanda-ny"
  },
  {
   "id": "rochester-colo-pittsford-ny",
   "name": "Rochester Colo",
   "operator": "Rochester Colo (James Salviski)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Pittsford",
   "county": "Monroe",
   "state": "NY",
   "latitude": 43.090959,
   "longitude": -77.515298,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/rochester-colo-pittsford-ny"
  },
  {
   "id": "monarch-rock-air-rockford-il",
   "name": "Rock Air Data Center Campus",
   "operator": "Monarch Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Rockford",
   "county": null,
   "state": "IL",
   "latitude": 42.1514357,
   "longitude": -89.101077,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1400,
   "capacity_mw_operational": null,
   "land_acres": 1300,
   "investment_usd": null,
   "jobs_permanent": 100,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-06",
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/monarch-rock-air-rockford-il"
  },
  {
   "id": "apricus-rock-point-data-center-west-plains-wa",
   "name": "Rock Point Data Center Project",
   "operator": "Apricus Energy Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "rumored",
   "city": "West Plains",
   "county": "Spokane",
   "state": "WA",
   "latitude": 47.621,
   "longitude": -117.73,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 514,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/apricus-rock-point-data-center-west-plains-wa"
  },
  {
   "id": "roundhouse-cascade-locks-or",
   "name": "Roundhouse Cascade Locks Data Center",
   "operator": "Roundhouse Digital Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Cascade Locks",
   "county": "Hood River",
   "state": "OR",
   "latitude": 45.6678863,
   "longitude": -121.8963113,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 30,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 100000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/roundhouse-cascade-locks-or"
  },
  {
   "id": "rowan-bauxite-ii-frederick-md",
   "name": "Rowan Digital Infrastructure Bauxite II",
   "operator": "Rowan Digital Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Frederick",
   "county": "Frederick",
   "state": "MD",
   "latitude": 39.34,
   "longitude": -77.515,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 111.5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": 0.392,
   "energy_source": "grid",
   "utility": "Potomac Edison (FirstEnergy)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/rowan-bauxite-ii-frederick-md"
  },
  {
   "id": "rowan-bauxite-iii-frederick-md",
   "name": "Rowan Digital Infrastructure Bauxite III",
   "operator": "Rowan Digital Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Frederick",
   "county": "Frederick",
   "state": "MD",
   "latitude": 39.338,
   "longitude": -77.506,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 55,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": 0.297,
   "energy_source": "grid",
   "utility": "Potomac Edison (FirstEnergy)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/rowan-bauxite-iii-frederick-md"
  },
  {
   "id": "rowan-digital-frederick-md",
   "name": "Rowan Digital Infrastructure Frederick Campus (Bauxite I)",
   "operator": "Rowan Digital Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Adamstown",
   "county": "Frederick",
   "state": "MD",
   "latitude": 39.265,
   "longitude": -77.394,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 151,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": 0.44,
   "energy_source": "grid",
   "utility": "Potomac Edison (FirstEnergy)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-08-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/rowan-digital-frederick-md"
  },
  {
   "id": "rowan-temple-tx",
   "name": "Rowan Project Temple",
   "operator": "Rowan Digital Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Temple",
   "county": "Bell",
   "state": "TX",
   "latitude": 31.0982,
   "longitude": -97.3428,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 700,
   "investment_usd": 700000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Oncor",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-09-08",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/rowan-temple-tx"
  },
  {
   "id": "drox-group-rural-hall-forsyth-county-nc",
   "name": "Rural Hall Data Center (The Drox Group)",
   "operator": "The Drox Group",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Rural Hall",
   "county": "Forsyth",
   "state": "NC",
   "latitude": 36.267,
   "longitude": -80.267,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 129,
   "investment_usd": 3000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-30",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/drox-group-rural-hall-forsyth-county-nc"
  },
  {
   "id": "saadia-holding-athens-dover-township-oh",
   "name": "Saadia Holding Athens-Dover Township Data Center",
   "operator": "Saadia Holding LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "The Plains",
   "county": "Athens",
   "state": "OH",
   "latitude": 39.3700911,
   "longitude": -82.1323674,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 300,
   "investment_usd": null,
   "jobs_permanent": 100,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07",
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/saadia-holding-athens-dover-township-oh"
  },
  {
   "id": "sabey-butte-mt",
   "name": "Sabey Data Centers Butte Campus (Montana Connections)",
   "operator": "Sabey Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Butte",
   "county": "Silver Bow",
   "state": "MT",
   "latitude": 45.9965283,
   "longitude": -112.6981966,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sabey-butte-mt"
  },
  {
   "id": "sabey-decatur-technology-park-marion-county-in",
   "name": "Sabey Decatur Technology Park",
   "operator": "Sabey Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Decatur Township",
   "county": "Marion",
   "state": "IN",
   "latitude": 39.7,
   "longitude": -86.28,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 250,
   "capacity_mw_operational": null,
   "land_acres": 130,
   "investment_usd": 4000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "AES Indiana",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sabey-decatur-technology-park-marion-county-in"
  },
  {
   "id": "sabey-intergate-ashburn-building-a-va",
   "name": "Sabey Intergate.Ashburn (Building A)",
   "operator": "Sabey Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0144996,
   "longitude": -77.4799874,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 54,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sabey-intergate-ashburn-building-a-va"
  },
  {
   "id": "sabey-intergate-columbia-building-a-wa",
   "name": "Sabey Intergate.Columbia Building A",
   "operator": "Sabey Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "East Wenatchee",
   "county": "Douglas",
   "state": "WA",
   "latitude": 47.4086205,
   "longitude": -120.1893981,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PUD No 1 of Douglas County",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sabey-intergate-columbia-building-a-wa"
  },
  {
   "id": "sabey-intergate-east-building-1-wa",
   "name": "Sabey Intergate.East Building 1",
   "operator": "Sabey Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tukwila",
   "county": "King",
   "state": "WA",
   "latitude": 47.4948597,
   "longitude": -122.2881943,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Seattle City Light",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sabey-intergate-east-building-1-wa"
  },
  {
   "id": "sabey-intergate-east-building-5-sdc-east-5-wa",
   "name": "Sabey Intergate.East Building 5 (SDC East 5)",
   "operator": "Sabey Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tukwila",
   "county": "King",
   "state": "WA",
   "latitude": 47.491986,
   "longitude": -122.2896655,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Seattle City Light",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sabey-intergate-east-building-5-sdc-east-5-wa"
  },
  {
   "id": "sabey-intergate-quincy-campus-wa",
   "name": "Sabey Intergate.Quincy Campus",
   "operator": "Sabey Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Quincy",
   "county": "Grant",
   "state": "WA",
   "latitude": 47.247,
   "longitude": -119.83,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 70,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Grant County PUD",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sabey-intergate-quincy-campus-wa"
  },
  {
   "id": "sabey-intergate-west-building-a-wa",
   "name": "Sabey Intergate.West Building A",
   "operator": "Sabey Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tukwila",
   "county": "King",
   "state": "WA",
   "latitude": 47.4921833,
   "longitude": -122.2933176,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Seattle City Light",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sabey-intergate-west-building-a-wa"
  },
  {
   "id": "sabey-intergate-west-building-c-wa",
   "name": "Sabey Intergate.West Building C",
   "operator": "Sabey Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tukwila",
   "county": "King",
   "state": "WA",
   "latitude": 47.494123,
   "longitude": -122.2943972,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Seattle City Light",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sabey-intergate-west-building-c-wa"
  },
  {
   "id": "sagebrush-hallam-hyperscale-campus-lancaster-ne",
   "name": "Sagebrush Hallam Hyperscale Campus (proposed)",
   "operator": "Sagebrush Infrastructure Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Hallam",
   "county": "Lancaster",
   "state": "NE",
   "latitude": 40.545,
   "longitude": -96.7992,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1700,
   "capacity_mw_operational": null,
   "land_acres": 1400,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-08",
   "record_updated": "2026-09-04",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sagebrush-hallam-hyperscale-campus-lancaster-ne"
  },
  {
   "id": "salcido-broadway-grant-county-wa",
   "name": "Salcido Broadway Data Center",
   "operator": "Salcido Enterprises, LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Grant",
   "state": "WA",
   "latitude": 47.2,
   "longitude": -119.45,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "salcido-cashmere-cashmere-wa",
   "name": "Salcido Cashmere Data Center",
   "operator": "Salcido Enterprises, LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Cashmere",
   "county": "Chelan",
   "state": "WA",
   "latitude": 47.5262,
   "longitude": -120.4692,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2014",
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/salcido-cashmere-cashmere-wa"
  },
  {
   "id": "salcido-columbia-wenatchee-wa",
   "name": "Salcido Columbia Data Center",
   "operator": "Salcido Enterprises, LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Wenatchee",
   "county": "Chelan",
   "state": "WA",
   "latitude": 47.4235,
   "longitude": -120.3103,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/salcido-columbia-wenatchee-wa"
  },
  {
   "id": "salcido-eller-douglas-county-wa",
   "name": "Salcido ELLER Data Center",
   "operator": "Salcido Enterprises, LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Douglas",
   "state": "WA",
   "latitude": 47.74,
   "longitude": -119.69,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 4,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "salcido-entiat-chelan-county-wa",
   "name": "Salcido Entiat Data Center",
   "operator": "Salcido Enterprises, LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Entiat",
   "county": "Chelan",
   "state": "WA",
   "latitude": 47.6743,
   "longitude": -120.2093,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/salcido-entiat-chelan-county-wa"
  },
  {
   "id": "salcido-fortress-quincy-wa",
   "name": "Salcido Fortress Data Center",
   "operator": "Salcido Enterprises, LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Quincy",
   "county": "Grant",
   "state": "WA",
   "latitude": 47.234,
   "longitude": -119.8528,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 4.6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023",
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/salcido-fortress-quincy-wa"
  },
  {
   "id": "salcido-horizon-quincy-wa",
   "name": "Salcido Horizon Data Center",
   "operator": "Salcido Enterprises, LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Quincy",
   "county": "Grant",
   "state": "WA",
   "latitude": 47.236,
   "longitude": -119.85,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 4,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2019",
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/salcido-horizon-quincy-wa"
  },
  {
   "id": "salcido-pangborn-east-wenatchee-wa",
   "name": "Salcido Pangborn Data Center",
   "operator": "Salcido Enterprises, LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "East Wenatchee",
   "county": "Douglas",
   "state": "WA",
   "latitude": 47.3985,
   "longitude": -120.2075,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 10,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2018",
   "record_updated": "2026-08-05",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/salcido-pangborn-east-wenatchee-wa"
  },
  {
   "id": "salcido-wheeler-moses-lake-wa",
   "name": "Salcido Wheeler Data Center",
   "operator": "Salcido Enterprises, LLC",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Moses Lake",
   "county": "Grant",
   "state": "WA",
   "latitude": 47.125,
   "longitude": -119.285,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 4.8,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-08-05",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/salcido-wheeler-moses-lake-wa"
  },
  {
   "id": "salix-data-center-site-ia",
   "name": "Salix Data Center Site (Midwest Capital Group)",
   "operator": "Midwest Capital Group (MidAmerican Energy)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Salix",
   "county": "Woodbury",
   "state": "IA",
   "latitude": 42.3208,
   "longitude": -96.2872,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 900,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "MidAmerican Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-06-11",
   "record_updated": "2026-08-14",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/salix-iowa-annexation-data-center-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/salix-data-center-site-ia"
  },
  {
   "id": "samx-data-centers-remington-fauquier-va",
   "name": "SAMX Data Centers",
   "operator": "SAMX Data LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Remington",
   "county": "Fauquier",
   "state": "VA",
   "latitude": 38.53,
   "longitude": -77.8,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 55.26,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-17",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/samx-data-centers-remington-fauquier-va"
  },
  {
   "id": "sangha-renewables-ector-county-tx",
   "name": "Sangha Renewables Ector County Bitcoin Mining Facility",
   "operator": "Sangha Renewables",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Odessa",
   "county": "Ector",
   "state": "TX",
   "latitude": 31.8633,
   "longitude": -102.3656,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 19.9,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-12-12",
   "record_updated": "2026-09-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sangha-renewables-ector-county-tx"
  },
  {
   "id": "sangha-systems-hennepin-il",
   "name": "Sangha Systems Hennepin (82 River North)",
   "operator": "Sangha Systems",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Hennepin",
   "county": "Putnam",
   "state": "IL",
   "latitude": 41.2489,
   "longitude": -89.339,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 82,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2019",
   "record_updated": "2026-08-03",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sangha-systems-hennepin-il"
  },
  {
   "id": "srs-ai-data-center-savannah-river-site-sc",
   "name": "Savannah River Site AI Data Center (Amentum)",
   "operator": "Amentum",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Barnwell",
   "state": "SC",
   "latitude": 33.2122041,
   "longitude": -81.6223727,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-07-20",
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/srs-ai-data-center-savannah-river-site-sc"
  },
  {
   "id": "scalematrix-san-diego-ca",
   "name": "ScaleMatrix San Diego",
   "operator": "ScaleMatrix",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Diego",
   "county": "San Diego",
   "state": "CA",
   "latitude": 32.8377287,
   "longitude": -117.132639,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 20,
   "capacity_mw_operational": 5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/scalematrix-san-diego-ca"
  },
  {
   "id": "scannell-monticello-tech-park-mn",
   "name": "Scannell Properties Monticello Tech Park",
   "operator": "Scannell Properties LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Monticello",
   "county": "Wright",
   "state": "MN",
   "latitude": 45.2914854,
   "longitude": -93.8499172,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 106,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/scannell-monticello-tech-park-mn"
  },
  {
   "id": "scott-data-center-omaha-ne",
   "name": "Scott Data Center",
   "operator": "Scott Data",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Omaha",
   "county": "Douglas",
   "state": "NE",
   "latitude": 41.2406,
   "longitude": -96.0093,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-14",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "bitfarms-scrubgrass-kennerdell-pa",
   "name": "Scrubgrass Generating Plant",
   "operator": "Bitfarms Ltd. (Keel Infrastructure Corp.)",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Kennerdell",
   "county": "Venango",
   "state": "PA",
   "latitude": 41.2306,
   "longitude": -79.8517,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1300,
   "capacity_mw_operational": 63,
   "land_acres": 650,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "other",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bitfarms-scrubgrass-kennerdell-pa"
  },
  {
   "id": "sabey-intergate-manhattan-ny",
   "name": "SDC Manhattan (Intergate.Manhattan), 375 Pearl Street",
   "operator": "Sabey Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "New York",
   "county": "New York",
   "state": "NY",
   "latitude": 40.7106,
   "longitude": -74.0013,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 18,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "evaporative",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "sabey-umatilla-or",
   "name": "SDC Umatilla Campus",
   "operator": "Sabey Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Umatilla",
   "county": "Umatilla",
   "state": "OR",
   "latitude": 45.919,
   "longitude": -119.339,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 150,
   "capacity_mw_operational": null,
   "land_acres": 60,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "PacifiCorp",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2023-09",
   "record_updated": "2026-09-05",
   "source_count": 11,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sabey-umatilla-or"
  },
  {
   "id": "segra-charlotte-international-airport-drive-nc",
   "name": "Segra Charlotte Data Center (International Airport Drive)",
   "operator": "Segra",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Charlotte",
   "county": "Mecklenburg",
   "state": "NC",
   "latitude": 35.22722,
   "longitude": -80.84306,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-29",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "segra-raleigh-garner-station-data-center-nc",
   "name": "Segra Raleigh Data Center (Garner Station Boulevard)",
   "operator": "Segra",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Raleigh",
   "county": "Wake",
   "state": "NC",
   "latitude": 35.85417,
   "longitude": -78.76194,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-29",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/segra-raleigh-garner-station-data-center-nc"
  },
  {
   "id": "segra-winston-salem-data-center-nc",
   "name": "Segra Winston-Salem Data Center",
   "operator": "Segra",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Winston-Salem",
   "county": "Forsyth",
   "state": "NC",
   "latitude": 36.10278,
   "longitude": -80.26083,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-29",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/segra-winston-salem-data-center-nc"
  },
  {
   "id": "senawave-salt-lake-city-ut",
   "name": "Senawave Salt Lake City",
   "operator": "Senawave",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "West Valley City",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.71216,
   "longitude": -111.964329,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/senawave-salt-lake-city-ut"
  },
  {
   "id": "sentinel-jay-me",
   "name": "Sentinel Data Centers Androscoggin Mill Campus, Jay",
   "operator": "Sentinel Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Jay",
   "county": "Franklin",
   "state": "ME",
   "latitude": 44.5024,
   "longitude": -70.2175,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 82,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 550000000,
   "jobs_permanent": 137,
   "jobs_construction": 900,
   "cooling_type": "closed_loop",
   "water_reported_mgd": 0.3,
   "energy_source": "solar",
   "utility": "Central Maine Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-01",
   "record_updated": "2026-09-14",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sentinel-jay-me"
  },
  {
   "id": "sentinel-east-whiteland-chester-county-pa",
   "name": "Sentinel East Whiteland Data Center",
   "operator": "Sentinel Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "East Whiteland Township",
   "county": "Chester",
   "state": "PA",
   "latitude": 40.041,
   "longitude": -75.545,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 100,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "PECO",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-17",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sentinel-east-whiteland-chester-county-pa"
  },
  {
   "id": "sentinel-grove-technology-park-fort-pierce-fl",
   "name": "Sentinel Grove Technology Park (Project Jarvis)",
   "operator": "Undisclosed developer (marketed as 'Sentinel Grove Technology Park', county code-named 'Project Jarvis')",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Fort Pierce",
   "county": "St. Lucie",
   "state": "FL",
   "latitude": 27.4552,
   "longitude": -80.559,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1218,
   "investment_usd": 13500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sentinel-grove-technology-park-fort-pierce-fl"
  },
  {
   "id": "sentinum-bni-montana-richland-mt",
   "name": "Sentinum BNI Montana Bitcoin Mining Facility",
   "operator": "Sentinum (Hyperscale Data)",
   "company": "alliance-cloud-services",
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Sidney",
   "county": "Richland",
   "state": "MT",
   "latitude": 47.716735,
   "longitude": -104.155973,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 125,
   "capacity_mw_operational": 10,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-02",
   "record_updated": "2026-08-05",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sentinum-bni-montana-richland-mt"
  },
  {
   "id": "sequitor-edge-kearney-ne",
   "name": "Sequitor Edge Kearney Data Center",
   "operator": "Sequitor Edge",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Kearney",
   "county": "Buffalo",
   "state": "NE",
   "latitude": 40.6994,
   "longitude": -99.0817,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 16,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Nebraska Public Power District",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09-19",
   "record_updated": "2026-08-21",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sequitor-edge-kearney-ne"
  },
  {
   "id": "sequitor-edge-rapid-city-sd",
   "name": "Sequitor Edge Rapid City",
   "operator": "Sequitor Edge",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Rapid City",
   "county": "Pennington",
   "state": "SD",
   "latitude": 44.0222987,
   "longitude": -103.1914102,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 10,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Black Hills Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sequitor-edge-rapid-city-sd"
  },
  {
   "id": "serverfarm-ch1-chicago-il",
   "name": "Serverfarm CH1",
   "operator": "Serverfarm",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Chicago",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.8717114,
   "longitude": -87.6392312,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 21.5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 17812500,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/serverfarm-ch1-chicago-il"
  },
  {
   "id": "serverfarm-covington-hazelbrand-ga",
   "name": "Serverfarm Covington Data Center (Hazelbrand Road)",
   "operator": "Serverfarm",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Covington",
   "county": "Newton",
   "state": "GA",
   "latitude": 33.5968,
   "longitude": -83.8602,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-06",
   "record_updated": "2026-07-28",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/serverfarm-covington-hazelbrand-ga"
  },
  {
   "id": "serverfarm-lax1-el-segundo-ca",
   "name": "Serverfarm LAX1",
   "operator": "Serverfarm",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "El Segundo",
   "county": "Los Angeles",
   "state": "CA",
   "latitude": 33.9217807,
   "longitude": -118.3864589,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 17.3,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/serverfarm-lax1-el-segundo-ca"
  },
  {
   "id": "servistar-westfield-ma",
   "name": "Servistar Realties Westfield Data Center Campus",
   "operator": "Servistar Realties",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Westfield",
   "county": "Hampden",
   "state": "MA",
   "latitude": 42.157077,
   "longitude": -72.741619,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 42,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "City of Westfield",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/servistar-westfield-ma"
  },
  {
   "id": "servpac-mtp2-mililani-hi",
   "name": "Servpac MTP Building 2",
   "operator": "Servpac",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Mililani",
   "county": "Honolulu",
   "state": "HI",
   "latitude": 21.448,
   "longitude": -158.017,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 13000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Hawaiian Electric Company (HECO)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-01",
   "record_updated": "2026-07-06",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/servpac-mtp2-mililani-hi"
  },
  {
   "id": "aligned-shippingport-pa",
   "name": "Shippingport Industrial Park",
   "operator": "Aligned Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Shippingport",
   "county": "Beaver",
   "state": "PA",
   "latitude": 40.63,
   "longitude": -80.44,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 2000,
   "capacity_mw_operational": null,
   "land_acres": 660,
   "investment_usd": 10000000000,
   "jobs_permanent": 640,
   "jobs_construction": 3000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aligned-shippingport-pa"
  },
  {
   "id": "simple-helix-huntsville-al",
   "name": "Simple Helix Data Center",
   "operator": "Simple Helix, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Huntsville",
   "county": "Madison",
   "state": "AL",
   "latitude": 34.744816340398,
   "longitude": -86.691765682048,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "simple-mining-cascade-ia",
   "name": "Simple Mining Cascade (Dubuque County)",
   "operator": "Simple Mining",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Cascade",
   "county": "Dubuque",
   "state": "IA",
   "latitude": 42.2997,
   "longitude": -91.0143,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 15,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-03",
   "record_updated": "2026-08-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/simple-mining-cascade-ia"
  },
  {
   "id": "simple-mining-cedar-falls-ia",
   "name": "Simple Mining Cedar Falls (rezoning defeated)",
   "operator": "Simple Mining",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Cedar Falls",
   "county": "Black Hawk",
   "state": "IA",
   "latitude": 42.5347,
   "longitude": -92.4453,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 38,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-03",
   "record_updated": "2026-08-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/simple-mining-cedar-falls-ia"
  },
  {
   "id": "simple-mining-manchester-ia",
   "name": "Simple Mining Manchester",
   "operator": "Simple Mining",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Manchester",
   "county": "Delaware",
   "state": "IA",
   "latitude": 42.4842,
   "longitude": -91.4515,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-01",
   "record_updated": "2026-08-08",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/simple-mining-manchester-ia"
  },
  {
   "id": "gemini-data-center-sioux-falls-sd",
   "name": "Sioux Falls Technology Park (Gemini Data Center)",
   "operator": "Gemini Data Center SD LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Sioux Falls",
   "county": "Minnehaha",
   "state": "SD",
   "latitude": 43.583,
   "longitude": -96.685,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": 164,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Xcel Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-07-06",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/gemini-data-center-sioux-falls-sd"
  },
  {
   "id": "mara-site-mat-1177-matagorda-tx",
   "name": "Site MAT 1177",
   "operator": "MARA Holdings",
   "company": "mara-holdings",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": null,
   "county": "Matagorda",
   "state": "TX",
   "latitude": 28.95,
   "longitude": -95.97,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 1200,
   "investment_usd": 600000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/mara-site-mat-1177-matagorda-tx"
  },
  {
   "id": "skybox-chicago-i-il",
   "name": "Skybox Chicago I",
   "operator": "Skybox Datacenters",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Elk Grove Village",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.9936612,
   "longitude": -87.973521,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 30,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/skybox-chicago-i-il"
  },
  {
   "id": "skybox-houston-one-tx",
   "name": "Skybox Houston One",
   "operator": "Skybox Datacenters",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Katy",
   "county": "Harris",
   "state": "TX",
   "latitude": 29.802893,
   "longitude": -95.7553386,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 26,
   "land_acres": 20,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "CenterPoint Energy (ERCOT)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/skybox-houston-one-tx"
  },
  {
   "id": "slate-belt-holdings-upper-mount-bethel-northampton-pa",
   "name": "Slate Belt Holdings Data Center Campus (Upper Mount Bethel)",
   "operator": "Slate Belt Holdings LLC (Talen Energy / River Pointe Logistics joint venture)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Upper Mount Bethel Township",
   "county": "Northampton",
   "state": "PA",
   "latitude": 40.9,
   "longitude": -75.13,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 754,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/slate-belt-holdings-upper-mount-bethel-northampton-pa"
  },
  {
   "id": "tpa-social-circle-technology-park-ga",
   "name": "Social Circle Technology Park",
   "operator": "TPA Group (developer; end tenant undisclosed)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Social Circle",
   "county": "Newton",
   "state": "GA",
   "latitude": 33.6562,
   "longitude": -83.7182,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 317,
   "investment_usd": 5000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-01",
   "record_updated": "2026-07-06",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tpa-social-circle-technology-park-ga"
  },
  {
   "id": "global-stack-vallejo-fairgrounds-ca",
   "name": "Solano County Fairgrounds Data Center (Global Stack proposal)",
   "operator": "Global Stack LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Vallejo",
   "county": "Solano",
   "state": "CA",
   "latitude": 38.135514,
   "longitude": -122.2262112,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/global-stack-vallejo-fairgrounds-ca"
  },
  {
   "id": "solis-arx-progress-park-wythe-va",
   "name": "Solis Arx Progress Park Data Center Campus",
   "operator": "Solis Arx",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Max Meadows",
   "county": "Wythe",
   "state": "VA",
   "latitude": 36.958,
   "longitude": -80.899,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Appalachian Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-12-05",
   "record_updated": "2026-07-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/solis-arx-progress-park-wythe-va"
  },
  {
   "id": "soluna-project-annie-paris-tx",
   "name": "Soluna Project Annie",
   "operator": "Soluna Holdings",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Paris",
   "county": "Lamar",
   "state": "TX",
   "latitude": 33.6609,
   "longitude": -95.5555,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 75,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-03",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/soluna-project-annie-paris-tx"
  },
  {
   "id": "soluna-project-dorothy-silverton-tx",
   "name": "Soluna Project Dorothy",
   "operator": "Soluna Holdings",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Silverton",
   "county": "Briscoe",
   "state": "TX",
   "latitude": 34.391589,
   "longitude": -101.318337,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 98,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-18",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "soluna-project-ellen-rio-hondo-tx",
   "name": "Soluna Project Ellen",
   "operator": "Soluna Holdings",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Rio Hondo",
   "county": "Cameron",
   "state": "TX",
   "latitude": 26.2373,
   "longitude": -97.5814,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 100,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "wind",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-03",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/soluna-project-ellen-rio-hondo-tx"
  },
  {
   "id": "soluna-project-fei-childress-tx",
   "name": "Soluna Project Fei",
   "operator": "Soluna Holdings",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Childress",
   "county": "Childress",
   "state": "TX",
   "latitude": 34.4262,
   "longitude": -100.2013,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 100,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-03",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/soluna-project-fei-childress-tx"
  },
  {
   "id": "soluna-project-grace-silverton-tx",
   "name": "Soluna Project Grace",
   "operator": "Soluna Holdings",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Silverton",
   "county": "Briscoe",
   "state": "TX",
   "latitude": 34.4692,
   "longitude": -101.3082,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 2,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "wind",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-03",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/soluna-project-grace-silverton-tx"
  },
  {
   "id": "soluna-project-kati-willacy-tx",
   "name": "Soluna Project Kati",
   "operator": "Soluna Holdings",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Raymondville",
   "county": "Willacy",
   "state": "TX",
   "latitude": 26.4804,
   "longitude": -97.7836,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 166,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Magic Valley Electric Co-op Inc",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09",
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/soluna-project-kati-willacy-tx"
  },
  {
   "id": "soluna-project-sophie-murray-ky",
   "name": "Soluna Project Sophie",
   "operator": "Soluna Holdings",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Murray",
   "county": "Calloway",
   "state": "KY",
   "latitude": 36.61,
   "longitude": -88.315,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 25,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-17",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "sos-limited-park-falls-wi",
   "name": "SOS Limited Park Falls Crypto Mine (Former Flambeau River Paper Mill)",
   "operator": "SOS Limited",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Park Falls",
   "county": "Price County",
   "state": "WI",
   "latitude": 45.9305,
   "longitude": -90.438,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2022-01",
   "record_updated": "2026-09-01",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sos-limited-park-falls-wi"
  },
  {
   "id": "inch-eastern-land-south-annville-lebanon-pa",
   "name": "South Annville Township Data Center Campus (withdrawn)",
   "operator": "Inch & Co. / Eastern Land & Resources Co. (1235 Martina Drive Owner)",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "South Annville Township",
   "county": "Lebanon",
   "state": "PA",
   "latitude": 40.290713,
   "longitude": -76.5192514,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 99,
   "investment_usd": 1700000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/inch-eastern-land-south-annville-lebanon-pa"
  },
  {
   "id": "south-front-networks-davenport-ia",
   "name": "South Front Networks IA-Davenport Interconnection Facility",
   "operator": "South Front Networks",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Davenport",
   "county": "Scott",
   "state": "IA",
   "latitude": 41.5477099,
   "longitude": -90.620859,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-04",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/south-front-networks-davenport-ia"
  },
  {
   "id": "sovereign-gazelle-somerville-al",
   "name": "Sovereign Gazelle Bitcoin Mining Data Center",
   "operator": "Sovereign Gazelle",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Somerville",
   "county": "Morgan",
   "state": "AL",
   "latitude": 34.457,
   "longitude": -86.7603,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 50,
   "capacity_mw_operational": null,
   "land_acres": 15,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Joe Wheeler EMC",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026",
   "record_updated": "2026-09-09",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sovereign-gazelle-somerville-al"
  },
  {
   "id": "spalding-investments-high-falls-road-campus-ga",
   "name": "Spalding Investments Data Center Campus (High Falls Road)",
   "operator": "Spalding Investments, LLC (developer; end user undisclosed)",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Griffin",
   "county": "Spalding",
   "state": "GA",
   "latitude": 33.2468,
   "longitude": -84.2641,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 127.45,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-28",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/spalding-investments-high-falls-road-campus-ga"
  },
  {
   "id": "active-infrastructure-spring-valley-tech-park-loudoun-va",
   "name": "Spring Valley Technology Park",
   "operator": "Active Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.008,
   "longitude": -77.523,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/active-infrastructure-spring-valley-tech-park-loudoun-va"
  },
  {
   "id": "allegheny-dc-springdale-cheswick-pa",
   "name": "Springdale Data Center (former Cheswick Generating Station)",
   "operator": "Allegheny DC Property Co., LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Springdale",
   "county": "Allegheny",
   "state": "PA",
   "latitude": 40.5425,
   "longitude": -79.7844,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 180,
   "capacity_mw_operational": null,
   "land_acres": 47,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09",
   "record_updated": "2026-09-12",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/allegheny-dc-springdale-cheswick-pa"
  },
  {
   "id": "harner-sr-14-ravenna-portage-oh",
   "name": "SR-14 Data Center Proposal (Ravenna)",
   "operator": "Ray Harner (landowner-developer)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Ravenna",
   "county": "Portage",
   "state": "OH",
   "latitude": 41.157557,
   "longitude": -81.242047,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/harner-sr-14-ravenna-portage-oh"
  },
  {
   "id": "parkway-gravel-st-georges-de",
   "name": "St. Georges Business Park & Lighthouse Farms",
   "operator": "Parkway Gravel Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "rumored",
   "city": "St. Georges",
   "county": "New Castle",
   "state": "DE",
   "latitude": 39.5593065,
   "longitude": -75.6542782,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/parkway-gravel-st-georges-de"
  },
  {
   "id": "t5-atlanta-i-ga",
   "name": "STACK ATL01 (formerly T5@Atlanta)",
   "operator": "STACK Infrastructure",
   "company": "t5-data-centers",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Alpharetta",
   "county": "Fulton",
   "state": "GA",
   "latitude": 34.0757915,
   "longitude": -84.264267,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 20,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-08",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/t5-atlanta-i-ga"
  },
  {
   "id": "stack-chi01-il",
   "name": "STACK CHI01",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Elk Grove Village",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.006856,
   "longitude": -87.9651767,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 40,
   "land_acres": null,
   "investment_usd": 250000000,
   "jobs_permanent": 20,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 15625000,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-chi01-il"
  },
  {
   "id": "stack-dfw01-plano-tx",
   "name": "STACK DFW01 (Plano)",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Plano",
   "county": "Collin",
   "state": "TX",
   "latitude": 33.0136764,
   "longitude": -96.6925096,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 80,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "stack-dfw02-lancaster-tx",
   "name": "STACK DFW02 (Lancaster)",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Lancaster",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.5920798,
   "longitude": -96.7561083,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": 193,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Oncor",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-dfw02-lancaster-tx"
  },
  {
   "id": "stack-hillsboro-or",
   "name": "STACK Hillsboro Campus",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5229,
   "longitude": -122.9898,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 75,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Portland General Electric (PGE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-hillsboro-or"
  },
  {
   "id": "stack-infrastructure-goldendale-data-center-wa",
   "name": "STACK Infrastructure Goldendale Data Center",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Goldendale",
   "county": "Klickitat",
   "state": "WA",
   "latitude": 45.8213,
   "longitude": -120.8217,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 958,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-infrastructure-goldendale-data-center-wa"
  },
  {
   "id": "stack-nal01-new-albany-oh",
   "name": "STACK Infrastructure NAL01 (New Albany)",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "New Albany",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.07,
   "longitude": -82.8,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 60,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "stack-phx01-avondale-az",
   "name": "STACK Infrastructure PHX01 Campus",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Avondale",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.418842,
   "longitude": -112.357688,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 225,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "stack-phx02-phoenix-az",
   "name": "STACK Infrastructure PHX02 Campus",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Phoenix",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.456212,
   "longitude": -111.995301,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 250,
   "capacity_mw_operational": null,
   "land_acres": 51,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-phx02-phoenix-az"
  },
  {
   "id": "stack-nova-loudoun-va",
   "name": "STACK NVA Loudoun 144MW Hyperscale Campus",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Ashburn",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.04,
   "longitude": -77.49,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 144,
   "capacity_mw_operational": null,
   "land_acres": 122,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-02",
   "record_updated": "2026-07-25",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-nova-loudoun-va"
  },
  {
   "id": "stack-nva01a-va",
   "name": "STACK NVA01A",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sterling",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 39.0046933,
   "longitude": -77.4417399,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 17,
   "capacity_mw_operational": 18,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-nva01a-va"
  },
  {
   "id": "stack-por01-or",
   "name": "STACK POR01",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5493273,
   "longitude": -122.9278183,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 40,
   "capacity_mw_operational": 36,
   "land_acres": 18,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Portland General Electric (PGE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-por01-or"
  },
  {
   "id": "stack-por02-or",
   "name": "STACK POR02",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5473758,
   "longitude": -122.8973869,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 24,
   "land_acres": 15,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Portland General Electric (PGE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-por02-or"
  },
  {
   "id": "stack-por03-or",
   "name": "STACK POR03",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Hillsboro",
   "county": "Washington",
   "state": "OR",
   "latitude": 45.5541322,
   "longitude": -122.9379069,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": 72,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Portland General Electric (PGE)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-por03-or"
  },
  {
   "id": "stack-svy01-ca",
   "name": "STACK SVY01",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Jose",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.4027449,
   "longitude": -121.891051,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 100,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Pacific Gas & Electric (PG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-svy01-ca"
  },
  {
   "id": "stack-svy02-ca",
   "name": "STACK SVY02",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3619343,
   "longitude": -121.9537306,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 48,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-svy02-ca"
  },
  {
   "id": "stack-svy03a-hayward-ca",
   "name": "STACK SVY03A",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Hayward",
   "county": "Alameda",
   "state": "CA",
   "latitude": 37.6281336,
   "longitude": -122.1195048,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 67.2,
   "capacity_mw_operational": null,
   "land_acres": 11.3,
   "investment_usd": null,
   "jobs_permanent": 41,
   "jobs_construction": 380,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": 76.6,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-svy03a-hayward-ca"
  },
  {
   "id": "stack-stafford-technology-campus-va",
   "name": "Stafford Technology Campus",
   "operator": "STACK Infrastructure",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Falmouth",
   "county": "Stafford",
   "state": "VA",
   "latitude": 38.365,
   "longitude": -77.485,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1100,
   "capacity_mw_operational": null,
   "land_acres": 500,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-01",
   "record_updated": "2026-07-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stack-stafford-technology-campus-va"
  },
  {
   "id": "stak-energy-north-slope-ak",
   "name": "Stak Energy North Slope Data Center",
   "operator": "Stak Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": null,
   "county": "North Slope",
   "state": "AK",
   "latitude": 69.84,
   "longitude": -148.5,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 3000,
   "capacity_mw_operational": null,
   "land_acres": 715,
   "investment_usd": 500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "air",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "Tdx North Slope Generating Co",
   "on_site_generation_mw": 3000,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05",
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stak-energy-north-slope-ak"
  },
  {
   "id": "standard-power-coshocton-oh",
   "name": "Standard Power Coshocton",
   "operator": "Standard Power",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Coshocton",
   "county": "Coshocton",
   "state": "OH",
   "latitude": 40.2771782,
   "longitude": -81.8649437,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 50,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": 20,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "nuclear",
   "utility": "Energy Harbor",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/standard-power-coshocton-oh"
  },
  {
   "id": "the-data-centers-star-campus-newark-de",
   "name": "STAR Campus Data Center & Cogeneration Plant (The Data Centers, LLC)",
   "operator": "The Data Centers, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Newark",
   "county": "New Castle",
   "state": "DE",
   "latitude": 39.6655592,
   "longitude": -75.7541725,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": 279,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/the-data-centers-star-campus-newark-de"
  },
  {
   "id": "stargate-abilene-tx",
   "name": "Stargate Abilene",
   "operator": "OpenAI / Oracle / Crusoe",
   "company": "openai-oracle",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Abilene",
   "county": "Taylor",
   "state": "TX",
   "latitude": 32.4487,
   "longitude": -99.7331,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1200,
   "capacity_mw_operational": null,
   "land_acres": 800,
   "investment_usd": 3500000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "AEP Texas",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2025-01-21",
   "record_updated": "2026-09-08",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stargate-abilene-tx"
  },
  {
   "id": "stargate-port-washington-wi",
   "name": "Stargate Lighthouse Campus",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Port Washington",
   "county": "Ozaukee",
   "state": "WI",
   "latitude": 43.3882,
   "longitude": -87.8753,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 902,
   "capacity_mw_operational": null,
   "land_acres": 672,
   "investment_usd": 15000000000,
   "jobs_permanent": 1000,
   "jobs_construction": 4000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "We Energies (WEC Energy Group)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 458000000,
   "announced_date": "2025",
   "record_updated": "2026-09-10",
   "source_count": 13,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/port-washington-wisconsin-lawsuits",
   "profile_url": "https://suedatacenters.org/data-centers/stargate-port-washington-wi"
  },
  {
   "id": "stargate-lordstown-oh",
   "name": "Stargate Lordstown Campus",
   "operator": "OpenAI / SoftBank / Oracle",
   "company": "openai-oracle",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Lordstown",
   "county": "Trumbull",
   "state": "OH",
   "latitude": 41.1745,
   "longitude": -80.8534,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "FirstEnergy (Ohio Edison)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-09-23",
   "record_updated": "2026-07-05",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stargate-lordstown-oh"
  },
  {
   "id": "stargate-milam-county-tx",
   "name": "Stargate Milam County Campus",
   "operator": "OpenAI / SoftBank (SB Energy)",
   "company": "openai-oracle",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": null,
   "county": "Milam",
   "state": "TX",
   "latitude": 30.852,
   "longitude": -96.972,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1200,
   "capacity_mw_operational": null,
   "land_acres": 595,
   "investment_usd": 470000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "ERCOT",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09-23",
   "record_updated": "2026-07-06",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stargate-milam-county-tx"
  },
  {
   "id": "stargate-project-jupiter-dona-ana-nm",
   "name": "Stargate Project Jupiter",
   "operator": "OpenAI / Oracle / STACK Infrastructure",
   "company": "openai-oracle",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Santa Teresa",
   "county": "Dona Ana",
   "state": "NM",
   "latitude": 31.8636,
   "longitude": -106.6895,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 1400,
   "investment_usd": 50000000000,
   "jobs_permanent": 750,
   "jobs_construction": 2500,
   "cooling_type": "closed_loop",
   "water_reported_mgd": 0.02,
   "energy_source": "on_site_gas",
   "utility": "El Paso Electric",
   "on_site_generation_mw": 2450,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025-09-23",
   "record_updated": "2026-09-03",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stargate-project-jupiter-dona-ana-nm"
  },
  {
   "id": "stargate-saline-township-mi",
   "name": "Stargate The Barn Campus",
   "operator": "OpenAI / Oracle / Related Digital",
   "company": "openai-oracle",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Saline Township",
   "county": "Washtenaw",
   "state": "MI",
   "latitude": 42.174,
   "longitude": -83.8063,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1400,
   "capacity_mw_operational": null,
   "land_acres": 250,
   "investment_usd": 16000000000,
   "jobs_permanent": 450,
   "jobs_construction": 2500,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "DTE Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-09-09",
   "source_count": 11,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/saline-township-openai-data-center-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/stargate-saline-township-mi"
  },
  {
   "id": "state-of-ohio-computer-center-columbus-oh",
   "name": "State of Ohio Computer Center (SOCC)",
   "operator": "State of Ohio",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Columbus",
   "county": "Franklin",
   "state": "OH",
   "latitude": 40.0057597,
   "longitude": -83.0446845,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-27",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "midwest-power-investors-rochelle-il",
   "name": "Steward Drive Data Center (Rochelle)",
   "operator": "Midwest Power Investors LLC (LFF Industrial)",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Rochelle",
   "county": "Ogle",
   "state": "IL",
   "latitude": 41.8979132,
   "longitude": -89.0482469,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 150,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/midwest-power-investors-rochelle-il"
  },
  {
   "id": "stonebridge-pacific-columbia-county-wi",
   "name": "Stonebridge Pacific AI Data Center (Columbia County)",
   "operator": "Stonebridge",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Pacific",
   "county": "Columbia",
   "state": "WI",
   "latitude": 43.55,
   "longitude": -89.4,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 10000000000,
   "jobs_permanent": 400,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-08-04",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stonebridge-pacific-columbia-county-wi"
  },
  {
   "id": "suncap-stowe-township-allegheny-county-pa",
   "name": "Stowe Township Data Center (former railcar plant)",
   "operator": "SunCap Industries",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Stowe Township",
   "county": "Allegheny",
   "state": "PA",
   "latitude": 40.469,
   "longitude": -80.064,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-08-17",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/suncap-stowe-township-allegheny-county-pa"
  },
  {
   "id": "stratos-box-elder-ut",
   "name": "Stratos AI Data Center Campus",
   "operator": "O'Leary Digital",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Lucin",
   "county": "Box Elder",
   "state": "UT",
   "latitude": 41.5,
   "longitude": -113.5,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 9000,
   "capacity_mw_operational": null,
   "land_acres": 40000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": "Raft Rural Electric Co-op Inc",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-04",
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stratos-box-elder-ut"
  },
  {
   "id": "stream-chicago-i-orda-elk-grove-village-il",
   "name": "Stream Chicago I (ORDA)",
   "operator": "Stream Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Elk Grove Village",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.0039,
   "longitude": -87.9703,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 31,
   "land_acres": null,
   "investment_usd": 250000000,
   "jobs_permanent": 20,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 15625000,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stream-chicago-i-orda-elk-grove-village-il"
  },
  {
   "id": "stream-chicago-ii-ordb-elk-grove-village-il",
   "name": "Stream Chicago II (ORDB)",
   "operator": "Stream Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Elk Grove Village",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.0039,
   "longitude": -87.9703,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 32,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-17",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "stream-chicago-iii-ordc-elk-grove-village-il",
   "name": "Stream Chicago III (ORDC)",
   "operator": "Stream Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Elk Grove Village",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.0039,
   "longitude": -87.9703,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 40,
   "capacity_mw_operational": null,
   "land_acres": 35,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-17",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stream-chicago-iii-ordc-elk-grove-village-il"
  },
  {
   "id": "stream-data-centers-dfwa-dfw-vii-tx",
   "name": "Stream Data Centers DFWA (DFW VII)",
   "operator": "Stream Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Garland",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.9836243,
   "longitude": -96.6542632,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 43,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stream-data-centers-dfwa-dfw-vii-tx"
  },
  {
   "id": "stream-data-centers-phxa-phoenix-i-vii-goodyear-campus-az",
   "name": "Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus)",
   "operator": "Stream Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Goodyear",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.4194907,
   "longitude": -112.3599883,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 280,
   "capacity_mw_operational": null,
   "land_acres": 157,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "APS (Arizona Public Service)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stream-data-centers-phxa-phoenix-i-vii-goodyear-campus-az"
  },
  {
   "id": "stream-stamp-alabama-ny",
   "name": "STREAM U.S. Data Centers at STAMP",
   "operator": "Stream U.S. Data Centers LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Alabama",
   "county": "Genesee",
   "state": "NY",
   "latitude": 43.0837,
   "longitude": -78.3936,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": 90,
   "investment_usd": 19460000000,
   "jobs_permanent": 125,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 3,
   "subsidy_usd_known": 1746000000,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stream-stamp-alabama-ny"
  },
  {
   "id": "aws-summit-crossing-tech-campus-spotsylvania-va",
   "name": "Summit Crossing Tech Campus",
   "operator": "Amazon Web Services",
   "company": "amazon",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Massaponax",
   "county": "Spotsylvania",
   "state": "VA",
   "latitude": 38.18847901989237,
   "longitude": -77.44053482811216,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 231,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Rappahannock Electric Co-op",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-06",
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/aws-summit-crossing-tech-campus-spotsylvania-va"
  },
  {
   "id": "summit-ridge-santaquin-ut",
   "name": "Summit Ridge Data Center",
   "operator": "Data Center Power Company",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Santaquin",
   "county": "Utah",
   "state": "UT",
   "latitude": 39.97551,
   "longitude": -111.78521,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/summit-ridge-santaquin-ut"
  },
  {
   "id": "switch-apex-industrial-park-north-las-vegas-nv",
   "name": "Switch Apex Industrial Park Land Position",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "North Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.329138,
   "longitude": -114.9277774,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 316,
   "investment_usd": 180500000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-apex-industrial-park-north-las-vegas-nv"
  },
  {
   "id": "switch-atlanta-the-keep-ga",
   "name": "Switch Atlanta: The KEEP",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Lithia Springs",
   "county": "Douglas",
   "state": "GA",
   "latitude": 33.7550251,
   "longitude": -84.5872685,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-atlanta-the-keep-ga"
  },
  {
   "id": "switch-citadel-storey-county-nv",
   "name": "Switch CITADEL Campus",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "McCarran",
   "county": "Storey",
   "state": "NV",
   "latitude": 39.6183,
   "longitude": -119.3732,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 650,
   "capacity_mw_operational": 250,
   "land_acres": 2000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "NV Energy (grid interconnect)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2017",
   "record_updated": "2026-09-11",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-citadel-storey-county-nv"
  },
  {
   "id": "switch-edge-1-nv",
   "name": "Switch Edge 1",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.0591345,
   "longitude": -115.213688,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-edge-1-nv"
  },
  {
   "id": "switch-las-19-enterprise-nv",
   "name": "Switch LAS 19",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Enterprise",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.0571,
   "longitude": -115.2125,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-06",
   "record_updated": "2026-08-14",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-las-19-enterprise-nv"
  },
  {
   "id": "switch-las-vegas-10-nv",
   "name": "Switch Las Vegas 10",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.0555857,
   "longitude": -115.2230608,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-las-vegas-10-nv"
  },
  {
   "id": "switch-las-vegas-11-nv",
   "name": "Switch Las Vegas 11",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.0558853,
   "longitude": -115.2141369,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-las-vegas-11-nv"
  },
  {
   "id": "switch-las-vegas-12-nv",
   "name": "Switch Las Vegas 12",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.0617389,
   "longitude": -115.2132922,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-las-vegas-12-nv"
  },
  {
   "id": "switch-las-vegas-14-nv",
   "name": "Switch Las Vegas 14",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.0629139,
   "longitude": -115.2213882,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-29",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-las-vegas-14-nv"
  },
  {
   "id": "switch-las-vegas-5-nv",
   "name": "Switch Las Vegas 5",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.1427635,
   "longitude": -115.0766965,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-las-vegas-5-nv"
  },
  {
   "id": "switch-las-vegas-7-nv",
   "name": "Switch Las Vegas 7",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Enterprise",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.0599191,
   "longitude": -115.210197,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-las-vegas-7-nv"
  },
  {
   "id": "switch-las-vegas-9-nv",
   "name": "Switch Las Vegas 9",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Las Vegas",
   "county": "Clark",
   "state": "NV",
   "latitude": 36.0557074,
   "longitude": -115.2196277,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-las-vegas-9-nv"
  },
  {
   "id": "switch-pyramid-campus-grand-rapids-mi",
   "name": "Switch Pyramid Campus",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Gaines Township",
   "county": "Kent",
   "state": "MI",
   "latitude": 42.823,
   "longitude": -85.64,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 320,
   "capacity_mw_operational": 225,
   "land_acres": 138,
   "investment_usd": 5000000000,
   "jobs_permanent": 148,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "wind",
   "utility": "Consumers Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 2,
   "subsidy_usd_known": null,
   "announced_date": "2022",
   "record_updated": "2026-09-09",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-pyramid-campus-grand-rapids-mi"
  },
  {
   "id": "switch-tahoe-reno-1-the-citadel-campus-nv",
   "name": "Switch Tahoe Reno 1 (The Citadel Campus)",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "McCarran",
   "county": "Storey",
   "state": "NV",
   "latitude": 39.5140681,
   "longitude": -119.4755145,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 650,
   "capacity_mw_operational": 130,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "NV Energy",
   "on_site_generation_mw": 130,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-tahoe-reno-1-the-citadel-campus-nv"
  },
  {
   "id": "switch-tahoe-reno-2-the-citadel-campus-nv",
   "name": "Switch Tahoe Reno 2 (The Citadel Campus)",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "McCarran",
   "county": "Storey",
   "state": "NV",
   "latitude": 39.5138706,
   "longitude": -119.4848531,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "NV Energy",
   "on_site_generation_mw": 127,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-tahoe-reno-2-the-citadel-campus-nv"
  },
  {
   "id": "switch-tahoe-reno-3-the-citadel-campus-nv",
   "name": "Switch Tahoe Reno 3 (The Citadel Campus)",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "McCarran",
   "county": "Storey",
   "state": "NV",
   "latitude": 39.5115198,
   "longitude": -119.4833058,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "solar",
   "utility": "NV Energy",
   "on_site_generation_mw": 127,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-tahoe-reno-3-the-citadel-campus-nv"
  },
  {
   "id": "switch-the-rock-round-rock-tx",
   "name": "Switch: The Rock (Round Rock)",
   "operator": "Switch",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Round Rock",
   "county": "Williamson",
   "state": "TX",
   "latitude": 30.4880189,
   "longitude": -97.6725256,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 185,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Oncor",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/switch-the-rock-round-rock-tx"
  },
  {
   "id": "syringa-networks-west-valley-city-ut",
   "name": "Syringa Networks West Valley",
   "operator": "Syringa Networks",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "West Valley City",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.69679,
   "longitude": -111.9867,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/syringa-networks-west-valley-city-ut"
  },
  {
   "id": "t5-atlanta-iv-palmetto-ga",
   "name": "T5 @ Atlanta IV",
   "operator": "T5 Data Centers",
   "company": "t5-data-centers",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Palmetto",
   "county": "Fulton",
   "state": "GA",
   "latitude": 33.548,
   "longitude": -84.724,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 300,
   "capacity_mw_operational": null,
   "land_acres": 91,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "hybrid",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-08-28",
   "record_updated": "2026-09-10",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/t5-atlanta-iv-palmetto-ga"
  },
  {
   "id": "t5-chicago-iii-northlake-il",
   "name": "T5 @ Chicago III (Northlake)",
   "operator": "T5 Data Centers",
   "company": "t5-data-centers",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Northlake",
   "county": "Cook",
   "state": "IL",
   "latitude": 41.9310571,
   "longitude": -87.9145933,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 36,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 252000000,
   "jobs_permanent": 20,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 15750000,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/t5-chicago-iii-northlake-il"
  },
  {
   "id": "t5-chicago-ii-il",
   "name": "T5 Chicago II",
   "operator": "T5 Data Centers",
   "company": "t5-data-centers",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Elk Grove Village",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.0230424,
   "longitude": -87.9755567,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 250000000,
   "jobs_permanent": 20,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 15625000,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/t5-chicago-ii-il"
  },
  {
   "id": "t5-chicago-iv-grayslake-il",
   "name": "T5 Chicago IV (CHI IV)",
   "operator": "T5 Data Centers",
   "company": "t5-data-centers",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Grayslake",
   "county": "Lake",
   "state": "IL",
   "latitude": 42.3442,
   "longitude": -88.0417,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1550,
   "capacity_mw_operational": null,
   "land_acres": 472,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": 0.05,
   "energy_source": "grid",
   "utility": "ComEd",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 15625000,
   "announced_date": "2026",
   "record_updated": "2026-09-12",
   "source_count": 14,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/grayslake-t5-data-center-lawsuit",
   "profile_url": "https://suedatacenters.org/data-centers/t5-chicago-iv-grayslake-il"
  },
  {
   "id": "t5-nampa-id",
   "name": "T5 Nampa",
   "operator": "T5 Data Centers",
   "company": "t5-data-centers",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Nampa",
   "county": "Canyon",
   "state": "ID",
   "latitude": 43.5407,
   "longitude": -116.5635,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/t5-nampa-id"
  },
  {
   "id": "t5-charlotte-nc",
   "name": "T5@Charlotte",
   "operator": "T5 Data Centers",
   "company": "t5-data-centers",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Kings Mountain",
   "county": "Cleveland",
   "state": "NC",
   "latitude": 35.2504249,
   "longitude": -81.395039,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 300,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/t5-charlotte-nc"
  },
  {
   "id": "t5-cleveland-oh",
   "name": "T5@Cleveland",
   "operator": "T5 Data Centers",
   "company": "t5-data-centers",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Cleveland",
   "county": "Cuyahoga",
   "state": "OH",
   "latitude": 41.4430567,
   "longitude": -81.803445,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/t5-cleveland-oh"
  },
  {
   "id": "t5-silicon-valley-newark-ca",
   "name": "T5@Silicon Valley",
   "operator": "T5 Data Centers",
   "company": "t5-data-centers",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Newark",
   "county": "Alameda",
   "state": "CA",
   "latitude": 37.5461,
   "longitude": -122.0312,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 49.1,
   "capacity_mw_operational": 17,
   "land_acres": 13.45,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2020-10",
   "record_updated": "2026-08-02",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/t5-silicon-valley-newark-ca"
  },
  {
   "id": "ta-realty-east-tanners-church-ellenwood-ga",
   "name": "TA Realty East Tanners Church Road Data Center",
   "operator": "TA Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ellenwood",
   "county": "Clayton",
   "state": "GA",
   "latitude": 33.6101096,
   "longitude": -84.287978,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 180,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 959000000,
   "jobs_permanent": 30,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ta-realty-east-tanners-church-ellenwood-ga"
  },
  {
   "id": "ta-realty-elk-grove-village-il",
   "name": "TA Realty Elk Grove Village Data Center",
   "operator": "TA Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Elk Grove Village",
   "county": "Cook",
   "state": "IL",
   "latitude": 42.0039,
   "longitude": -87.9703,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 250,
   "capacity_mw_operational": null,
   "land_acres": 47,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-17",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ta-realty-elk-grove-village-il"
  },
  {
   "id": "tac-data-centers-wythe-county-va",
   "name": "TAC Data Centers Wythe County Campus",
   "operator": "TAC Data Centers (The Ardent Companies)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": null,
   "county": "Wythe",
   "state": "VA",
   "latitude": 36.93,
   "longitude": -80.86,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 1000,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Appalachian Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-06-04",
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tac-data-centers-wythe-county-va"
  },
  {
   "id": "talen-montour-data-center-campus-montour-county-pa",
   "name": "Talen Energy Montour Data Center Campus",
   "operator": "Talen Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Washingtonville",
   "county": "Montour",
   "state": "PA",
   "latitude": 41.05,
   "longitude": -76.67,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/talen-montour-data-center-campus-montour-county-pa"
  },
  {
   "id": "tecfusions-keystone-connect-upper-burrell-pa",
   "name": "TECfusions Keystone Connect",
   "operator": "TECfusions",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Upper Burrell Township",
   "county": "Westmoreland",
   "state": "PA",
   "latitude": 40.5817,
   "longitude": -79.705,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 3000,
   "capacity_mw_operational": 12,
   "land_acres": 1395,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 2000000,
   "announced_date": "2025-01-14",
   "record_updated": "2026-09-10",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tecfusions-keystone-connect-upper-burrell-pa"
  },
  {
   "id": "tech-vault-south-burlington-vt",
   "name": "Tech Vault Data Center",
   "operator": "Tech Vault, Inc.",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "South Burlington",
   "county": "Chittenden",
   "state": "VT",
   "latitude": 44.4541938,
   "longitude": -73.1417505,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tech-vault-south-burlington-vt"
  },
  {
   "id": "telehouse-staten-island-ny",
   "name": "Telehouse New York (Staten Island Teleport)",
   "operator": "Telehouse America (KDDI)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Staten Island",
   "county": "Richmond",
   "state": "NY",
   "latitude": 40.606205,
   "longitude": -74.171125,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/telehouse-staten-island-ny"
  },
  {
   "id": "telehouse-chelsea-manhattan-ny",
   "name": "Telehouse New York Chelsea (85 10th Avenue)",
   "operator": "Telehouse America (KDDI)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "New York",
   "county": "New York",
   "state": "NY",
   "latitude": 40.743446,
   "longitude": -74.00734,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "core-scientific-quinlan-tx",
   "name": "Telios Quinlan Campus",
   "operator": "Core Scientific",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Quinlan",
   "county": "Hunt",
   "state": "TX",
   "latitude": 32.911,
   "longitude": -96.138,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 430,
   "capacity_mw_operational": null,
   "land_acres": 260,
   "investment_usd": 232500000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Farmers Electric Coop, Inc",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/core-scientific-quinlan-tx"
  },
  {
   "id": "tenkey-franklin-ky",
   "name": "TenKey LandCo Project Lionsgate, Franklin Data Center",
   "operator": "TenKey LandCo I LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Franklin",
   "county": "Simpson",
   "state": "KY",
   "latitude": 36.703,
   "longitude": -86.591,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 200,
   "investment_usd": 4800000000,
   "jobs_permanent": 150,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Warren Rural Electric Co-op Corp",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-07-24",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tenkey-franklin-ky"
  },
  {
   "id": "terawulf-lansing-ny",
   "name": "TeraWulf AI Data Center Campus, Lansing",
   "operator": "TeraWulf",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Lansing",
   "county": "Tompkins",
   "state": "NY",
   "latitude": 42.5453,
   "longitude": -76.4968,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 400,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "New York State Electric & Gas (NYSEG)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-08",
   "record_updated": "2026-09-09",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/terawulf-lansing-ny"
  },
  {
   "id": "terawulf-lake-mariner-ny",
   "name": "TeraWulf Lake Mariner",
   "operator": "TeraWulf",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Barker",
   "county": "Niagara",
   "state": "NY",
   "latitude": 43.35055916999524,
   "longitude": -78.61459634619537,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 750,
   "capacity_mw_operational": 205,
   "land_acres": 410,
   "investment_usd": 3200000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "New York Power Authority (NYPA)",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/terawulf-lake-mariner-ny"
  },
  {
   "id": "terawulf-morgantown-charles-county-md",
   "name": "TeraWulf Morgantown Generating Station AI Campus",
   "operator": "TeraWulf",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": null,
   "county": "Charles",
   "state": "MD",
   "latitude": 38.362,
   "longitude": -77.129,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 250,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": 500,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-02",
   "record_updated": "2026-09-10",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/terawulf-morgantown-charles-county-md"
  },
  {
   "id": "terawulf-muskie-eastpark-ky",
   "name": "TeraWulf Muskie Data Campus (EastPark)",
   "operator": "TeraWulf",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "confirmed",
   "city": "Ashland",
   "county": "Greenup",
   "state": "KY",
   "latitude": 38.4042,
   "longitude": -82.79,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 285,
   "investment_usd": null,
   "jobs_permanent": 100,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Kentucky Power (AEP)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05-26",
   "record_updated": "2026-07-25",
   "source_count": 8,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/terawulf-muskie-eastpark-ky"
  },
  {
   "id": "terra-data-center-alviso-san-jose-ca",
   "name": "Terra Data Center",
   "operator": "Terra Ventures",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Jose",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3807591,
   "longitude": -121.9236758,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 9,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/terra-data-center-alviso-san-jose-ca"
  },
  {
   "id": "terra-hosting-vermillion-rise-newport-in",
   "name": "Terra Hosting Vermillion Rise Facility",
   "operator": "Terra Hosting",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Newport",
   "county": "Vermillion",
   "state": "IN",
   "latitude": 39.885,
   "longitude": -87.405,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Duke Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-05",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/terra-hosting-vermillion-rise-newport-in"
  },
  {
   "id": "terra-nexus-custer-avenue-fayetteville-cumberland-county-nc",
   "name": "Terra Nexus Custer Avenue Data Center (Fayetteville)",
   "operator": "Terra Nexus Ventures",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Fayetteville",
   "county": "Cumberland",
   "state": "NC",
   "latitude": 35.085,
   "longitude": -78.97722,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 180,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10",
   "record_updated": "2026-08-29",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/terra-nexus-custer-avenue-fayetteville-cumberland-county-nc"
  },
  {
   "id": "terra-nexus-rockingham-richmond-county-nc",
   "name": "Terra Nexus Rockingham Data Center (Old Cheraw Highway)",
   "operator": "Terra Nexus Land Fund I, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "mixed",
   "source_confidence": "reported",
   "city": "Rockingham",
   "county": "Richmond",
   "state": "NC",
   "latitude": 34.9151,
   "longitude": -79.7948,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 165,
   "investment_usd": 1200000000,
   "jobs_permanent": 30,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/terra-nexus-rockingham-richmond-county-nc"
  },
  {
   "id": "tesla-cortex-2-giga-texas-austin-tx",
   "name": "Tesla Cortex 2.0 AI Training Cluster (Giga Texas)",
   "operator": "Tesla",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Austin",
   "county": "Travis",
   "state": "TX",
   "latitude": 30.2223,
   "longitude": -97.6171,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": "Bluebonnet Electric Cooperative",
   "on_site_generation_mw": 30,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tesla-cortex-2-giga-texas-austin-tx"
  },
  {
   "id": "tcdc-ector-county-tx",
   "name": "Texas Critical Data Centers (TCDC)",
   "operator": "Sharon AI + New Era Energy & Digital (joint venture)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": null,
   "county": "Ector",
   "state": "TX",
   "latitude": 31.87,
   "longitude": -102.54,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 250,
   "capacity_mw_operational": null,
   "land_acres": 438,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": 250,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tcdc-ector-county-tx"
  },
  {
   "id": "tenhats-fort-summit-knoxville-tn",
   "name": "The Fort (TenHats Knoxville Data Center)",
   "operator": "TenHats (formerly SH Data Technologies)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Knoxville",
   "county": "Knox",
   "state": "TN",
   "latitude": 35.9704933,
   "longitude": -83.9184704,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tenhats-fort-summit-knoxville-tn"
  },
  {
   "id": "stem-practice-sycamore-view-memphis-tn",
   "name": "The STEM Practice Sycamore View AI Data Center",
   "operator": "Golden Acquisitions / The STEM Practice",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Memphis",
   "county": "Shelby",
   "state": "TN",
   "latitude": 35.161633,
   "longitude": -89.85969,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/stem-practice-sycamore-view-memphis-tn"
  },
  {
   "id": "thor-equities-augusta-township-mi",
   "name": "Thor Equities Augusta Township Data Center (Form8tion)",
   "operator": "Thor Equities",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Augusta Township",
   "county": "Washtenaw",
   "state": "MI",
   "latitude": 42.163,
   "longitude": -83.72,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 810,
   "investment_usd": 1000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "DTE Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-09-09",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/thor-equities-augusta-township-mi"
  },
  {
   "id": "thornberry-data-center-campus-caroline-va",
   "name": "Thornberry Data Center Campus",
   "operator": "Thornberry, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Ruther Glen",
   "county": "Caroline",
   "state": "VA",
   "latitude": 37.885,
   "longitude": -77.52,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 657,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Rappahannock Electric Co-op",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/thornberry-data-center-campus-caroline-va"
  },
  {
   "id": "thornburg-business-park-data-center-spotsylvania-va",
   "name": "Thornburg Business Park",
   "operator": "LID, LLC (with IWG Thornburg, LLC and JR Bluestar Thornburg, LLC)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Thornburg",
   "county": "Spotsylvania",
   "state": "VA",
   "latitude": 38.127876,
   "longitude": -77.52959,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 200.35,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Rappahannock Electric Co-op",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/thornburg-business-park-data-center-spotsylvania-va"
  },
  {
   "id": "thornburg-industrial-park-data-center-spotsylvania-va",
   "name": "Thornburg Industrial Park Data Center Campus",
   "operator": "South Roxbury Mill LLC / Grindstone VA LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Thornburg",
   "county": "Spotsylvania",
   "state": "VA",
   "latitude": 38.135,
   "longitude": -77.5208,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Rappahannock Electric Co-op",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/thornburg-industrial-park-data-center-spotsylvania-va"
  },
  {
   "id": "tierpoint-allentown-tekpark-breinigsville-pa",
   "name": "TierPoint Allentown TekPark",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Breinigsville",
   "county": "Lehigh",
   "state": "PA",
   "latitude": 40.5384,
   "longitude": -75.6288,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 137,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-17",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "tierpoint-baltimore-bwi-md",
   "name": "TierPoint Baltimore - BWI",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Linthicum Heights",
   "county": "Anne Arundel",
   "state": "MD",
   "latitude": 39.213455,
   "longitude": -76.682834,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "BGE",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-baltimore-bwi-md"
  },
  {
   "id": "tierpoint-russell-street-baltimore-md",
   "name": "TierPoint Baltimore (Russell Street)",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Baltimore",
   "county": null,
   "state": "MD",
   "latitude": 39.275776951529,
   "longitude": -76.625636130534,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-russell-street-baltimore-md"
  },
  {
   "id": "tierpoint-boston-andover-ma",
   "name": "TierPoint Boston - Andover",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Andover",
   "county": "Essex",
   "state": "MA",
   "latitude": 42.6857078,
   "longitude": -71.2086024,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "National Grid",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-boston-andover-ma"
  },
  {
   "id": "tierpoint-marlborough-ma",
   "name": "TierPoint Boston Data Center (Marlborough)",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Marlborough",
   "county": "Middlesex",
   "state": "MA",
   "latitude": 42.31391,
   "longitude": -71.58139,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "tierpoint-charlotte-center-park-nc",
   "name": "TierPoint Charlotte - Center Park",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Charlotte",
   "county": "Mecklenburg",
   "state": "NC",
   "latitude": 35.1731955,
   "longitude": -80.928121,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Duke Energy Carolinas",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-charlotte-center-park-nc"
  },
  {
   "id": "tierpoint-dallas-tx",
   "name": "TierPoint Dallas",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Dallas",
   "county": "Dallas",
   "state": "TX",
   "latitude": 32.8079818,
   "longitude": -96.8573889,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-dallas-tx"
  },
  {
   "id": "tierpoint-dallas-allen-tx",
   "name": "TierPoint Dallas-Allen",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Allen",
   "county": "Collin",
   "state": "TX",
   "latitude": 33.1379102,
   "longitude": -96.657329,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-dallas-allen-tx"
  },
  {
   "id": "tierpoint-hawthorne-westchester-ny",
   "name": "TierPoint Hawthorne (11 & 17 Skyline Drive)",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Hawthorne",
   "county": "Westchester",
   "state": "NY",
   "latitude": 41.088456,
   "longitude": -73.815184,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Con Edison",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-hawthorne-westchester-ny"
  },
  {
   "id": "tierpoint-jacksonville-fl",
   "name": "TierPoint Jacksonville Data Center",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Jacksonville",
   "county": "Duval",
   "state": "FL",
   "latitude": 30.220681,
   "longitude": -81.585108,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-jacksonville-fl"
  },
  {
   "id": "tierpoint-kansas-city-lenexa-ks",
   "name": "TierPoint Kansas City - Lenexa",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Lenexa",
   "county": "Johnson",
   "state": "KS",
   "latitude": 38.9406295,
   "longitude": -94.7552326,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-kansas-city-lenexa-ks"
  },
  {
   "id": "tierpoint-little-rock-ar",
   "name": "TierPoint Little Rock",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Little Rock",
   "county": "Pulaski",
   "state": "AR",
   "latitude": 34.7562396,
   "longitude": -92.4447234,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Entergy Arkansas",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-little-rock-ar"
  },
  {
   "id": "tierpoint-milwaukee-wi",
   "name": "TierPoint Milwaukee",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Milwaukee",
   "county": "Milwaukee",
   "state": "WI",
   "latitude": 43.0097937,
   "longitude": -87.9610932,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "We Energies",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-milwaukee-wi"
  },
  {
   "id": "tierpoint-nashville-tn",
   "name": "TierPoint Nashville",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Franklin",
   "county": "Williamson",
   "state": "TN",
   "latitude": 35.9245097,
   "longitude": -86.8556872,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Middle Tennessee Electric",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-nashville-tn"
  },
  {
   "id": "tierpoint-newton-ia",
   "name": "TierPoint Newton Data Center",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Newton",
   "county": "Jasper",
   "state": "IA",
   "latitude": 41.6997,
   "longitude": -93.0479,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-14",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "tierpoint-oklahoma-city-ok",
   "name": "TierPoint Oklahoma City (OKC / OKC2)",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Oklahoma City",
   "county": "Oklahoma",
   "state": "OK",
   "latitude": 35.4676,
   "longitude": -97.5164,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-oklahoma-city-ok"
  },
  {
   "id": "tierpoint-omaha-bellevue-ne",
   "name": "TierPoint Omaha - Bellevue Data Center",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Bellevue",
   "county": "Sarpy",
   "state": "NE",
   "latitude": 41.153,
   "longitude": -95.925,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 5.5,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-omaha-bellevue-ne"
  },
  {
   "id": "tierpoint-omaha-midlands-papillion-ne",
   "name": "TierPoint Omaha - Midlands Data Center",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Papillion",
   "county": "Sarpy",
   "state": "NE",
   "latitude": 41.11,
   "longitude": -96.046,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-14",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "tierpoint-sioux-falls-west-sd",
   "name": "TierPoint Sioux Falls - West",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sioux Falls",
   "county": "Minnehaha",
   "state": "SD",
   "latitude": 43.6069708,
   "longitude": -96.8091949,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-sioux-falls-west-sd"
  },
  {
   "id": "tierpoint-spokane-wa",
   "name": "TierPoint Spokane",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Liberty Lake",
   "county": "Spokane",
   "state": "WA",
   "latitude": 47.6719149,
   "longitude": -117.0959323,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-spokane-wa"
  },
  {
   "id": "tierpoint-st-louis-olive-mo",
   "name": "TierPoint St. Louis - Olive",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Saint Louis",
   "county": "St. Louis City",
   "state": "MO",
   "latitude": 38.6297601,
   "longitude": -90.1964208,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-st-louis-olive-mo"
  },
  {
   "id": "tierpoint-tulsa-archer-ok",
   "name": "TierPoint Tulsa - Archer",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tulsa",
   "county": "Tulsa",
   "state": "OK",
   "latitude": 36.1585898,
   "longitude": -95.9886293,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-tulsa-archer-ok"
  },
  {
   "id": "tierpoint-tulsa-state-farm-ok",
   "name": "TierPoint Tulsa - State Farm",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Tulsa",
   "county": "Tulsa",
   "state": "OK",
   "latitude": 36.154,
   "longitude": -95.9928,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-tulsa-state-farm-ok"
  },
  {
   "id": "tierpoint-valley-forge-pa",
   "name": "TierPoint Valley Forge",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Norristown",
   "county": "Montgomery",
   "state": "PA",
   "latitude": 40.1218812,
   "longitude": -75.4208776,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PECO",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-valley-forge-pa"
  },
  {
   "id": "tierpoint-waterbury-ct",
   "name": "TierPoint Waterbury",
   "operator": "TierPoint",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Waterbury",
   "county": null,
   "state": "CT",
   "latitude": 41.554366,
   "longitude": -73.0410751,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tierpoint-waterbury-ct"
  },
  {
   "id": "serverfarm-titan-moses-lake-wa",
   "name": "TiTAN (Serverfarm Moses Lake)",
   "operator": "Serverfarm LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Moses Lake",
   "county": "Grant",
   "state": "WA",
   "latitude": 47.1554,
   "longitude": -119.25,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 22,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-22",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "zenith-tooele-valley-burmester-ut",
   "name": "Tooele Valley Data Center Campus",
   "operator": "Zenith Development",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Burmester",
   "county": "Tooele",
   "state": "UT",
   "latitude": 40.748,
   "longitude": -112.674,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 500,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-25",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/zenith-tooele-valley-burmester-ut"
  },
  {
   "id": "townsite-solar-2-boulder-city-nv",
   "name": "Townsite Solar 2 Boulder City Data Center",
   "operator": "Townsite Solar 2 LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Boulder City",
   "county": "Clark",
   "state": "NV",
   "latitude": 35.9787649,
   "longitude": -114.8337574,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 167,
   "capacity_mw_operational": null,
   "land_acres": 88.5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-04",
   "record_updated": "2026-09-11",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/townsite-solar-2-boulder-city-nv"
  },
  {
   "id": "tract-altoona-ia",
   "name": "Tract Altoona Technology Park",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Altoona",
   "county": "Polk",
   "state": "IA",
   "latitude": 41.6439,
   "longitude": -93.4649,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": 453,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09-09",
   "record_updated": "2026-08-14",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-altoona-ia"
  },
  {
   "id": "tract-caldwell-valley-uhland-tx",
   "name": "Tract Caldwell Valley Technology Park",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Uhland",
   "county": "Caldwell",
   "state": "TX",
   "latitude": 29.9499,
   "longitude": -97.7889,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 2000,
   "capacity_mw_operational": null,
   "land_acres": 1515,
   "investment_usd": null,
   "jobs_permanent": 800,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Blue Bonnet Electric Cooperative",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-05",
   "record_updated": "2026-07-25",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-caldwell-valley-uhland-tx"
  },
  {
   "id": "tract-eagle-mountain-ut",
   "name": "Tract Eagle Mountain Data Center Park",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Eagle Mountain",
   "county": "Utah",
   "state": "UT",
   "latitude": 40.30935,
   "longitude": -112.01198,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 400,
   "capacity_mw_operational": null,
   "land_acres": 668,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Rocky Mountain Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-eagle-mountain-ut"
  },
  {
   "id": "tract-norwalk-ia",
   "name": "Tract Norwalk Data Center Park (Project West)",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "confirmed",
   "city": "Norwalk",
   "county": "Warren",
   "state": "IA",
   "latitude": 41.460963,
   "longitude": -93.6978644,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 282,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-03-05",
   "record_updated": "2026-09-04",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-norwalk-ia"
  },
  {
   "id": "tract-silver-springs-nv",
   "name": "Tract Silver Springs Data Center Park",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "Silver Springs",
   "county": "Lyon",
   "state": "NV",
   "latitude": 39.407,
   "longitude": -119.229,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1600,
   "capacity_mw_operational": null,
   "land_acres": 1060,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09",
   "record_updated": "2026-09-10",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-silver-springs-nv"
  },
  {
   "id": "tract-virginia-highlands-storey-county-nv",
   "name": "Tract Virginia Highlands Technology Park",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Lockwood",
   "county": "Storey",
   "state": "NV",
   "latitude": 39.5071009,
   "longitude": -119.6464691,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 2500,
   "capacity_mw_operational": null,
   "land_acres": 8590,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-virginia-highlands-storey-county-nv"
  },
  {
   "id": "trammell-crow-lewis-clark-ranch-west-richland-wa",
   "name": "Trammell Crow Lewis & Clark Ranch Data Center",
   "operator": "Trammell Crow Company",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "rumored",
   "city": "West Richland",
   "county": "Benton",
   "state": "WA",
   "latitude": 46.3046,
   "longitude": -119.3667,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 500,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-22",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/trammell-crow-lewis-clark-ranch-west-richland-wa"
  },
  {
   "id": "treetop-east-fishkill-ny",
   "name": "Treetop East Fishkill Data Center (proposed, no application filed)",
   "operator": "Treetop Development",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "rumored",
   "city": "East Fishkill",
   "county": "Dutchess",
   "state": "NY",
   "latitude": 41.534,
   "longitude": -73.801,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1000,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/treetop-east-fishkill-ny"
  },
  {
   "id": "triboro-industrial-park-jessup-olyphant-lackawanna-county-pa",
   "name": "Triboro Industrial Park / Triboro Commerce Park",
   "operator": "Ercor Triboro LLC (Sansone Group)",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Jessup / Olyphant",
   "county": "Lackawanna",
   "state": "PA",
   "latitude": 41.45,
   "longitude": -75.58,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 548,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PPL Electric",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/triboro-industrial-park-jessup-olyphant-lackawanna-county-pa"
  },
  {
   "id": "truss-energy-carpenter-wy",
   "name": "Truss Energy Carpenter Data Center",
   "operator": "Truss Energy",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Carpenter",
   "county": "Laramie",
   "state": "WY",
   "latitude": 41.0461861,
   "longitude": -104.3627365,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 540,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-05",
   "record_updated": "2026-09-02",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/truss-energy-carpenter-wy"
  },
  {
   "id": "tract-tuckahoe-technology-park-goochland-county-va",
   "name": "Tuckahoe Technology Park",
   "operator": "Tract",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": null,
   "county": "Goochland",
   "state": "VA",
   "latitude": 37.68,
   "longitude": -77.68,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 900,
   "capacity_mw_operational": null,
   "land_acres": 872,
   "investment_usd": 3000000000,
   "jobs_permanent": 350,
   "jobs_construction": 1200,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tract-tuckahoe-technology-park-goochland-county-va"
  },
  {
   "id": "tulsa-technology-exchange-tulsa-ok",
   "name": "Tulsa Technology Exchange",
   "operator": "Facility Gateway Corporation",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tulsa",
   "county": "Tulsa County",
   "state": "OK",
   "latitude": 36.1512,
   "longitude": -95.9903,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "tulsaconnect-downtown-dc5-tulsa-ok",
   "name": "TulsaConnect Downtown (DC-5)",
   "operator": "TulsaConnect",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tulsa",
   "county": "Tulsa",
   "state": "OK",
   "latitude": 36.154,
   "longitude": -95.9928,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tulsaconnect-downtown-dc5-tulsa-ok"
  },
  {
   "id": "tulsaconnect-east-dc3-tulsa-ok",
   "name": "TulsaConnect East (DC-3)",
   "operator": "TulsaConnect",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Tulsa",
   "county": "Tulsa",
   "state": "OK",
   "latitude": 36.154,
   "longitude": -95.9928,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tulsaconnect-east-dc3-tulsa-ok"
  },
  {
   "id": "tulsaconnect-dc1-tulsa-ok",
   "name": "TulsaConnect Tulsa Data Center (DC-1)",
   "operator": "TulsaConnect",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tulsa",
   "county": "Tulsa County",
   "state": "OK",
   "latitude": 36.1535,
   "longitude": -95.9905,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tulsaconnect-dc1-tulsa-ok"
  },
  {
   "id": "tulsaconnect-dc2-tulsa-ok",
   "name": "TulsaConnect Tulsa Data Center (DC-2)",
   "operator": "TulsaConnect",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tulsa",
   "county": "Tulsa County",
   "state": "OK",
   "latitude": 36.1523,
   "longitude": -95.9932,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/tulsaconnect-dc2-tulsa-ok"
  },
  {
   "id": "turin-hoefler-ilion-ny",
   "name": "Turin Hoefler Avenue AI Data Center (former Remington Arms plant, Site C)",
   "operator": "Turin Hoefler Avenue LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Ilion",
   "county": "Herkimer",
   "state": "NY",
   "latitude": 43.0119,
   "longitude": -75.0357,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": null,
   "land_acres": 7.837,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": 1000,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/turin-hoefler-ilion-ny"
  },
  {
   "id": "warrenton-group-halifax-road-petersburg-va",
   "name": "TWG Data Halifax Road Campus (former Collier Yard)",
   "operator": "Warrenton Group (TWG Data)",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Petersburg",
   "county": null,
   "state": "VA",
   "latitude": 37.177,
   "longitude": -77.418,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 175,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/warrenton-group-halifax-road-petersburg-va"
  },
  {
   "id": "umich-lanl-research-computing-ypsilanti-township-mi",
   "name": "U-M / Los Alamos Research Computing Center",
   "operator": "University of Michigan (with Los Alamos National Laboratory)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "confirmed",
   "city": "Ypsilanti",
   "county": "Washtenaw",
   "state": "MI",
   "latitude": 42.202962873437,
   "longitude": -83.557610942093,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 144,
   "investment_usd": 1200000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": 100000000,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/umich-lanl-research-computing-ypsilanti-township-mi"
  },
  {
   "id": "unisys-salt-lake-city-ut",
   "name": "Unisys Salt Lake City",
   "operator": "Unisys",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Salt Lake City",
   "county": "Salt Lake",
   "state": "UT",
   "latitude": 40.75962,
   "longitude": -111.8868,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 1,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/unisys-salt-lake-city-ut"
  },
  {
   "id": "university-of-alabama-hpc-tuscaloosa-al",
   "name": "University of Alabama High Performance Computing and Data Center",
   "operator": "University of Alabama",
   "company": null,
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Tuscaloosa",
   "county": "Tuscaloosa",
   "state": "AL",
   "latitude": 33.2120822,
   "longitude": -87.5396735,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024-11",
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/university-of-alabama-hpc-tuscaloosa-al"
  },
  {
   "id": "yeehaw-junction-us-development-osceola-fl",
   "name": "US Development Yeehaw Junction Data Center Campus",
   "operator": "US Development (end tenant undisclosed)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Yeehaw Junction",
   "county": "Osceola",
   "state": "FL",
   "latitude": 27.69944,
   "longitude": -80.88694,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 434,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/yeehaw-junction-us-development-osceola-fl"
  },
  {
   "id": "us-signal-ia01-waukee-ia",
   "name": "US Signal IA01 Des Moines Data Center (Waukee)",
   "operator": "US Signal",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Waukee",
   "county": "Dallas",
   "state": "IA",
   "latitude": 41.6118485,
   "longitude": -93.8845129,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-04",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/us-signal-ia01-waukee-ia"
  },
  {
   "id": "us-signal-mi01-kentwood-mi",
   "name": "US Signal MI01 Grand Rapids Data Center",
   "operator": "US Signal",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Kentwood",
   "county": "Kent",
   "state": "MI",
   "latitude": 42.87690347654,
   "longitude": -85.563698606365,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/us-signal-mi01-kentwood-mi"
  },
  {
   "id": "us-signal-mi02-byron-center-mi",
   "name": "US Signal MI02 Grand Rapids Data Center",
   "operator": "US Signal",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Byron Center",
   "county": "Kent",
   "state": "MI",
   "latitude": 42.826202163837,
   "longitude": -85.67268596115,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "us-signal-mi03-van-buren-township-mi",
   "name": "US Signal MI03 Detroit Data Center",
   "operator": "US Signal",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Belleville",
   "county": "Wayne",
   "state": "MI",
   "latitude": 42.2356076,
   "longitude": -83.4450278,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "us-signal-mi04-southfield-mi",
   "name": "US Signal MI04 Detroit Data Center",
   "operator": "US Signal",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Southfield",
   "county": "Oakland",
   "state": "MI",
   "latitude": 42.4477475,
   "longitude": -83.2562243,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "us-signal-mi05-auburn-hills-mi",
   "name": "US Signal MI05 Detroit Data Center",
   "operator": "US Signal",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Auburn Hills",
   "county": "Oakland",
   "state": "MI",
   "latitude": 42.6529314,
   "longitude": -83.2148612,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "us-signal-or01-bend-or",
   "name": "US Signal OR01 Bend",
   "operator": "US Signal",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Bend",
   "county": "Deschutes",
   "state": "OR",
   "latitude": 44.086105,
   "longitude": -121.2830411,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "us-signal-wi01-madison-wi",
   "name": "US Signal WI01 Madison",
   "operator": "US Signal",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Madison",
   "county": "Dane",
   "state": "WI",
   "latitude": 43.0732716,
   "longitude": -89.3870807,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 0.15,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-18",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "us-signal-wi02-fitchburg-wi",
   "name": "US Signal WI02 Madison (Fitchburg)",
   "operator": "US Signal",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Fitchburg",
   "county": "Dane",
   "state": "WI",
   "latitude": 42.9947535,
   "longitude": -89.42339,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 6,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-18",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/us-signal-wi02-fitchburg-wi"
  },
  {
   "id": "valley-oak-shinn-street-fremont-ca",
   "name": "Valley Oak Partners Shinn Street Data Center",
   "operator": "Valley Oak Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Fremont",
   "county": "Alameda",
   "state": "CA",
   "latitude": 37.567072,
   "longitude": -121.983674,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 90,
   "capacity_mw_operational": null,
   "land_acres": 12.5,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Pacific Gas & Electric (PG&E)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/valley-oak-shinn-street-fremont-ca"
  },
  {
   "id": "valorc3-oklahoma-city-ok",
   "name": "ValorC3 Oklahoma City Data Center",
   "operator": "ValorC3 Data Centers",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Oklahoma City",
   "county": "Oklahoma County",
   "state": "OK",
   "latitude": 35.4676,
   "longitude": -97.5164,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 1.25,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/valorc3-oklahoma-city-ok"
  },
  {
   "id": "valorc3-st-george-ut",
   "name": "ValorC3 Saint George Data Center",
   "operator": "ValorC3",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "St. George",
   "county": "Washington",
   "state": "UT",
   "latitude": 37.10988,
   "longitude": -113.58321,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 4,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/valorc3-st-george-ut"
  },
  {
   "id": "vantage-ashburn-ii-va2-va",
   "name": "Vantage Ashburn II (VA2)",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Sterling",
   "county": "Loudoun",
   "state": "VA",
   "latitude": 38.997949,
   "longitude": -77.4302306,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 96,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Dominion Energy Virginia",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-ashburn-ii-va2-va"
  },
  {
   "id": "vantage-co21-aurora-co",
   "name": "Vantage Data Centers CO21 Campus (Building 3)",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Aurora",
   "county": "Adams",
   "state": "CO",
   "latitude": 39.7837993,
   "longitude": -104.7259922,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 143,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-co21-aurora-co"
  },
  {
   "id": "vantage-douglasville-campus-ga",
   "name": "Vantage Data Centers Douglasville Campus",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Douglasville",
   "county": "Douglas",
   "state": "GA",
   "latitude": 33.7515,
   "longitude": -84.7477,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-08",
   "record_updated": "2026-08-28",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-douglasville-campus-ga"
  },
  {
   "id": "vantage-nv1-storey-county-nv",
   "name": "Vantage Data Centers NV1",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "McCarran",
   "county": "Storey",
   "state": "NV",
   "latitude": 39.5311,
   "longitude": -119.5904,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 224,
   "capacity_mw_operational": null,
   "land_acres": 137,
   "investment_usd": 3000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "NV Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-07",
   "record_updated": "2026-09-10",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-nv1-storey-county-nv"
  },
  {
   "id": "vantage-oh1-new-albany-licking-county-oh",
   "name": "Vantage Data Centers OH1",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Johnstown",
   "county": "Licking",
   "state": "OH",
   "latitude": 40.100989,
   "longitude": -82.746359,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 192,
   "capacity_mw_operational": null,
   "land_acres": 70,
   "investment_usd": 2000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "American Electric Power (AEP Ohio)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-oh1-new-albany-licking-county-oh"
  },
  {
   "id": "vantage-oh2-millersport-fairfield-oh",
   "name": "Vantage Data Centers OH2 (Millersport Campus)",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Millersport",
   "county": "Fairfield",
   "state": "OH",
   "latitude": 39.902,
   "longitude": -82.5324,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 696,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-oh2-millersport-fairfield-oh"
  },
  {
   "id": "vantage-stafford-va4-va",
   "name": "Vantage Data Centers VA4 Stafford Campus",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": null,
   "county": "Stafford",
   "state": "VA",
   "latitude": 38.44,
   "longitude": -77.44,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 192,
   "capacity_mw_operational": null,
   "land_acres": 82,
   "investment_usd": 2000000000,
   "jobs_permanent": 50,
   "jobs_construction": 1100,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Dominion Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-11",
   "record_updated": "2026-07-06",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-stafford-va4-va"
  },
  {
   "id": "vantage-westlake-south-fulton-ga",
   "name": "Vantage Data Centers Westlake",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "South Fulton",
   "county": "Fulton",
   "state": "GA",
   "latitude": 33.6273,
   "longitude": -84.5646,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-28",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-westlake-south-fulton-ga"
  },
  {
   "id": "vantage-frontier-shackelford-county-tx",
   "name": "Vantage Frontier Campus",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": null,
   "county": "Shackelford",
   "state": "TX",
   "latitude": 32.7272,
   "longitude": -99.2987,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1400,
   "capacity_mw_operational": null,
   "land_acres": 1200,
   "investment_usd": null,
   "jobs_permanent": 250,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": 700,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-07-05",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-frontier-shackelford-county-tx"
  },
  {
   "id": "vantage-phoenix-campus-goodyear-az-az",
   "name": "Vantage Phoenix Campus (Goodyear, AZ)",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Goodyear",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.4463027,
   "longitude": -112.3738867,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 176,
   "capacity_mw_operational": null,
   "land_acres": 50,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Arizona Public Service (APS)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-31",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-phoenix-campus-goodyear-az-az"
  },
  {
   "id": "vantage-pittsboro-in",
   "name": "Vantage Pittsboro Campus",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Pittsboro",
   "county": "Hendricks",
   "state": "IN",
   "latitude": 39.8656,
   "longitude": -86.4675,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 400,
   "capacity_mw_operational": null,
   "land_acres": 626,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-pittsboro-in"
  },
  {
   "id": "vantage-quincy-wa11-wa",
   "name": "Vantage Quincy WA11",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Quincy",
   "county": "Grant",
   "state": "WA",
   "latitude": 47.2501646,
   "longitude": -119.8144903,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": "PUD No 2 of Grant County",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-quincy-wa11-wa"
  },
  {
   "id": "vantage-san-antonio-tx11-tx",
   "name": "Vantage San Antonio TX11",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Antonio",
   "county": "Bexar",
   "state": "TX",
   "latitude": 29.4161404,
   "longitude": -98.7892449,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-22",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-san-antonio-tx11-tx"
  },
  {
   "id": "vantage-san-antonio-tx22-tx",
   "name": "Vantage San Antonio TX22",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "under_construction",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "San Antonio",
   "county": "Bexar",
   "state": "TX",
   "latitude": 29.4790852,
   "longitude": -98.6977011,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-san-antonio-tx22-tx"
  },
  {
   "id": "vantage-santa-clara-i-ca1-ca",
   "name": "Vantage Santa Clara I (CA1)",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3725693,
   "longitude": -121.9736589,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 77,
   "land_acres": 21,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": null
  },
  {
   "id": "vantage-santa-clara-ii-ca2-ca",
   "name": "Vantage Santa Clara II (CA2)",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3640012,
   "longitude": -121.94689,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 75,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-santa-clara-ii-ca2-ca"
  },
  {
   "id": "vantage-santa-clara-iii-ca3-ca",
   "name": "Vantage Santa Clara III (CA3)",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Santa Clara",
   "county": "Santa Clara",
   "state": "CA",
   "latitude": 37.3712362,
   "longitude": -121.9740103,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 64,
   "land_acres": 8,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Silicon Valley Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-santa-clara-iii-ca3-ca"
  },
  {
   "id": "vantage-wa12-wa",
   "name": "Vantage WA12",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Quincy",
   "county": "Grant",
   "state": "WA",
   "latitude": 47.2539697,
   "longitude": -119.8136985,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 68,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PUD No 2 of Grant County",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-wa12-wa"
  },
  {
   "id": "vantage-wa13-quincy-wa",
   "name": "Vantage WA13",
   "operator": "Vantage Data Centers",
   "company": "vantage-data-centers",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Quincy",
   "county": "Grant",
   "state": "WA",
   "latitude": 47.247,
   "longitude": -119.83,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 64,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "hydro",
   "utility": "Grant County PUD",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-05",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vantage-wa13-quincy-wa"
  },
  {
   "id": "vaultas-st-cloud-mn",
   "name": "Vaultas St. Cloud",
   "operator": "Vaultas",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "St. Cloud",
   "county": "Stearns",
   "state": "MN",
   "latitude": 45.5405392,
   "longitude": -94.2023528,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 0.6,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vaultas-st-cloud-mn"
  },
  {
   "id": "databank-vernon-la-ca",
   "name": "Vernon LA Campus (with Goodman Group)",
   "operator": "DataBank",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Vernon",
   "county": "Los Angeles",
   "state": "CA",
   "latitude": 34.00543,
   "longitude": -118.218653,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 32,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-04-07",
   "record_updated": "2026-07-25",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/databank-vernon-la-ca"
  },
  {
   "id": "vint-hill-corners-fauquier-va",
   "name": "Vint Hill Corners",
   "operator": "Vint Hill Corners LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Vint Hill",
   "county": "Fauquier",
   "state": "VA",
   "latitude": 38.746,
   "longitude": -77.664,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 50,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-19",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/vint-hill-corners-fauquier-va"
  },
  {
   "id": "virginia-technology-park-clear-brook-frederick-va",
   "name": "Virginia Technology Park",
   "operator": "Equus Capital Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Clear Brook",
   "county": "Frederick",
   "state": "VA",
   "latitude": 39.2564912,
   "longitude": -78.096111,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 220,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/virginia-technology-park-clear-brook-frederick-va"
  },
  {
   "id": "volition-spanish-fork-ut",
   "name": "Volition Spanish Fork Data Center",
   "operator": "Volition Industries",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Spanish Fork",
   "county": "Utah",
   "state": "UT",
   "latitude": 40.115,
   "longitude": -111.6461,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 250,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 4000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": "other",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-08",
   "source_count": 5,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/volition-spanish-fork-ut"
  },
  {
   "id": "chirisa-volo-data-center-il",
   "name": "Volo Data Center",
   "operator": "Chirisa Technology Parks",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Volo",
   "county": "Lake",
   "state": "IL",
   "latitude": 42.3486,
   "longitude": -88.1382,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 14,
   "land_acres": 50,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-02",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/chirisa-volo-data-center-il"
  },
  {
   "id": "voonami-orem-ut",
   "name": "Voonami Orem Data Center",
   "operator": "Voonami",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Orem",
   "county": "Utah",
   "state": "UT",
   "latitude": 40.29816,
   "longitude": -111.69443,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": 2,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-15",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/voonami-orem-ut"
  },
  {
   "id": "wagner-properties-wagner-road-petersburg-va",
   "name": "Wagner Road Data Center Campus",
   "operator": "Wagner Properties",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Petersburg",
   "county": "Petersburg",
   "state": "VA",
   "latitude": 37.2279,
   "longitude": -77.4019,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 73,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2024",
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/wagner-properties-wagner-road-petersburg-va"
  },
  {
   "id": "wahawk-power-waterloo-ia",
   "name": "Wahawk Power Data Center",
   "operator": "Wahawk Power, LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Waterloo",
   "county": "Black Hawk",
   "state": "IA",
   "latitude": 42.4429861,
   "longitude": -92.4006906,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 12,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "MidAmerican Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-12-15",
   "record_updated": "2026-08-21",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/wahawk-power-waterloo-ia"
  },
  {
   "id": "wallace-jackson-data-center-campus-spalding-ga",
   "name": "Wallace Jackson Data Center Campus",
   "operator": "Wallace Jackson, LLC (developer; end user undisclosed)",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Griffin",
   "county": "Spalding",
   "state": "GA",
   "latitude": 33.2468,
   "longitude": -84.2641,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 3700000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-28",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/wallace-jackson-data-center-campus-spalding-ga"
  },
  {
   "id": "walmart-bentonville-data-center-ar",
   "name": "Walmart Bentonville Data Center",
   "operator": "Walmart",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Bentonville",
   "county": "Benton",
   "state": "AR",
   "latitude": 36.363598477537,
   "longitude": -94.183277242948,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-13",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/walmart-bentonville-data-center-ar"
  },
  {
   "id": "prologis-washington-township-mi",
   "name": "Washington Township Technical Campus",
   "operator": "Prologis",
   "company": null,
   "facility_type": "data_center",
   "status": "cancelled",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Washington",
   "county": "Macomb",
   "state": "MI",
   "latitude": 42.80333473861,
   "longitude": -82.980045064045,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 312,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/prologis-washington-township-mi"
  },
  {
   "id": "sharpless-wellington-road-bristow-va",
   "name": "Wellington Road Data Center Campus (Sharpless)",
   "operator": "Sharpless Enterprises LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Bristow",
   "county": "Prince William",
   "state": "VA",
   "latitude": 38.746,
   "longitude": -77.523,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 181,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2023-11",
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sharpless-wellington-road-bristow-va"
  },
  {
   "id": "westblock-shiprock-nm",
   "name": "WestBlock Capital Bitcoin Mine (Shiprock)",
   "operator": "WestBlock Capital",
   "company": null,
   "facility_type": "crypto_mining",
   "status": "cancelled",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Shiprock",
   "county": "San Juan",
   "state": "NM",
   "latitude": 36.7867,
   "longitude": -108.6866,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 15,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2018",
   "record_updated": "2026-08-16",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/westblock-shiprock-nm"
  },
  {
   "id": "western-hospitality-childersburg-al",
   "name": "Western Hospitality Childersburg Campus",
   "operator": "Western Hospitality Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Childersburg",
   "county": "Talladega",
   "state": "AL",
   "latitude": 33.2781686,
   "longitude": -86.3549774,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 486,
   "investment_usd": 6000000000,
   "jobs_permanent": 200,
   "jobs_construction": 2000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/western-hospitality-childersburg-al"
  },
  {
   "id": "westin-building-digital-realty-seattle-sea10-wa",
   "name": "Westin Building (Digital Realty Seattle SEA10)",
   "operator": "Digital Realty",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Seattle",
   "county": "King",
   "state": "WA",
   "latitude": 47.6143555,
   "longitude": -122.3388637,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Seattle City Light",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/westin-building-digital-realty-seattle-sea10-wa"
  },
  {
   "id": "beacon-westline-dove-creek-san-angelo-tx",
   "name": "Westline Site / Dove Creek Technology Campus",
   "operator": "Beacon Data Centers (via Westline TX Holdings)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "San Angelo (Tankersley area, unincorporated)",
   "county": "Tom Green",
   "state": "TX",
   "latitude": 31.335,
   "longitude": -100.478,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1240,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "Concho Valley Electric Co-op Inc",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/beacon-westline-dove-creek-san-angelo-tx"
  },
  {
   "id": "shelbourne-white-clay-newark-de",
   "name": "White Clay Corporate Center Data Center Redevelopment",
   "operator": "Shelbourne",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Newark",
   "county": "New Castle",
   "state": "DE",
   "latitude": 39.6828358,
   "longitude": -75.7515682,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 44,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-12",
   "source_count": 4,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/shelbourne-white-clay-newark-de"
  },
  {
   "id": "white-cloud-acres-barnard-mo",
   "name": "White Cloud Acres",
   "operator": "Scale Microgrids",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Barnard",
   "county": "Nodaway",
   "state": "MO",
   "latitude": 40.2528,
   "longitude": -94.9436,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 600,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 4000000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": 0.2,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-24",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/white-cloud-acres-barnard-mo"
  },
  {
   "id": "white-oak-technology-park-columbia-county-ga",
   "name": "White Oak Technology Park",
   "operator": "Trammell Crow Company (CBRE subsidiary)",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Appling",
   "county": "Columbia",
   "state": "GA",
   "latitude": 33.6,
   "longitude": -82.28,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1945,
   "investment_usd": 11600000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Georgia Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/white-oak-technology-park-columbia-county-ga"
  },
  {
   "id": "whitefiber-nc1-madison-nc",
   "name": "WhiteFiber NC-1 AI Data Center Campus",
   "operator": "WhiteFiber (Bit Digital)",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Madison",
   "county": "Rockingham",
   "state": "NC",
   "latitude": 36.3801,
   "longitude": -79.9692,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 200,
   "capacity_mw_operational": 24,
   "land_acres": 96,
   "investment_usd": null,
   "jobs_permanent": 60,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Duke Energy",
   "on_site_generation_mw": null,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2025",
   "record_updated": "2026-08-29",
   "source_count": 7,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/whitefiber-nc1-madison-nc"
  },
  {
   "id": "bitdeer-whitetail-creek-trumbull-county-oh",
   "name": "Whitetail Creek Data Center",
   "operator": "Bitdeer",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Niles / Weathersfield Township",
   "county": "Trumbull",
   "state": "OH",
   "latitude": 41.19,
   "longitude": -80.77,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "grid",
   "utility": "Ohio Edison (FirstEnergy)",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-24",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/bitdeer-whitetail-creek-trumbull-county-oh"
  },
  {
   "id": "wildcat-ridge-archbald-lackawanna-county-pa",
   "name": "Wildcat Ridge AI Data Center Campus",
   "operator": "Cornell Realty Management",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Archbald",
   "county": "Lackawanna",
   "state": "PA",
   "latitude": 41.51,
   "longitude": -75.54,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 1600,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 2100000000,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": "PPL Electric",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-26",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/wildcat-ridge-archbald-lackawanna-county-pa"
  },
  {
   "id": "willow-lakes-west-midway-fort-pierce-fl",
   "name": "Willow Lakes Data Center (West Midway Road)",
   "operator": "Willow Lakes LLC (end operator undisclosed)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Fort Pierce",
   "county": "St. Lucie",
   "state": "FL",
   "latitude": 27.3742,
   "longitude": -80.4104,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 174,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/willow-lakes-west-midway-fort-pierce-fl"
  },
  {
   "id": "winchester-gateway-data-center-frederick-va",
   "name": "Winchester Gateway",
   "operator": "Winchester Gateway LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Winchester",
   "county": "Frederick",
   "state": "VA",
   "latitude": 39.1442224,
   "longitude": -78.1980384,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 72,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-26",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/winchester-gateway-data-center-frederick-va"
  },
  {
   "id": "windstream-wholesale-oklahoma-city-ok",
   "name": "Windstream Wholesale Oklahoma City Data Center",
   "operator": "Windstream",
   "company": null,
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Oklahoma City",
   "county": "Oklahoma County",
   "state": "OK",
   "latitude": 35.4791,
   "longitude": -97.5142,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-02",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/windstream-wholesale-oklahoma-city-ok"
  },
  {
   "id": "wintersburg-313-tonopah-az",
   "name": "Wintersburg 313",
   "operator": "313 Wintersburg LLC and Wintersburg Four LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Tonopah",
   "county": "Maricopa",
   "state": "AZ",
   "latitude": 33.472,
   "longitude": -112.911,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-08-28",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/wintersburg-313-tonopah-az"
  },
  {
   "id": "wiscasset-proposed-me",
   "name": "Wiscasset Data Center (Old Ferry Road Site)",
   "operator": "Unnamed developer (NDA with town)",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Wiscasset",
   "county": "Lincoln",
   "state": "ME",
   "latitude": 44.0015,
   "longitude": -69.6553,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 200,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "other",
   "utility": "Central Maine Power",
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-09",
   "record_updated": "2026-07-23",
   "source_count": 3,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/wiscasset-proposed-me"
  },
  {
   "id": "pch-wi-holdings-wisconsin-rapids-wood-county-wi",
   "name": "Wisconsin Rapids Data Center",
   "operator": "PCH WI Holdings LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Wisconsin Rapids",
   "county": "Wood",
   "state": "WI",
   "latitude": 44.39,
   "longitude": -89.82,
   "coordinate_precision": "exact",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 209,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-07-09",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/pch-wi-holdings-wisconsin-rapids-wood-county-wi"
  },
  {
   "id": "wise-innovation-hub-wise-va",
   "name": "Wise Innovation Hub (OASIS)",
   "operator": "Wise Innovation Hub Venture LLC",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": null,
   "county": "Wise",
   "state": "VA",
   "latitude": 36.99,
   "longitude": -82.53,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 600,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "other",
   "utility": null,
   "on_site_generation_mw": 600,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-12",
   "record_updated": "2026-09-09",
   "source_count": 9,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/wise-innovation-hub-wise-va"
  },
  {
   "id": "sansone-wixom-road-mi",
   "name": "Wixom Road Data Center Campus",
   "operator": "Wixom Industrial One / Sansone Group",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "opposed",
   "source_confidence": "reported",
   "city": "Wixom",
   "county": "Oakland",
   "state": "MI",
   "latitude": 42.518432572023,
   "longitude": -83.537488801805,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 55,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-09",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/sansone-wixom-road-mi"
  },
  {
   "id": "blue-ladder-wolcott-white-county-in",
   "name": "Wolcott Data Center",
   "operator": "Blue Ladder Development",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "litigation",
   "source_confidence": "reported",
   "city": "Wolcott",
   "county": "White",
   "state": "IN",
   "latitude": 40.7581,
   "longitude": -87.0281,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 322,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": 1000,
   "cooling_type": "closed_loop",
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/blue-ladder-wolcott-white-county-in"
  },
  {
   "id": "wylie-capital-broadway-merrillville-in",
   "name": "Wylie Capital Broadway Data Center",
   "operator": "Wylie Capital",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "reported",
   "city": "Merrillville",
   "county": "Lake",
   "state": "IN",
   "latitude": 41.4828,
   "longitude": -87.3328,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 600000000,
   "jobs_permanent": 200,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-01",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/wylie-capital-broadway-merrillville-in"
  },
  {
   "id": "xai-southaven-ms",
   "name": "xAI Southaven",
   "operator": "xAI",
   "company": "xai",
   "facility_type": "data_center",
   "status": "operational",
   "community_reception": "litigation",
   "source_confidence": "confirmed",
   "city": "Southaven",
   "county": "DeSoto",
   "state": "MS",
   "latitude": 34.993,
   "longitude": -89.974,
   "coordinate_precision": "exact",
   "capacity_mw_planned": 2000,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 20000000000,
   "jobs_permanent": 145,
   "jobs_construction": null,
   "cooling_type": "unknown",
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": 495,
   "subsidy_programs": 1,
   "subsidy_usd_known": null,
   "announced_date": "2026-01",
   "record_updated": "2026-09-09",
   "source_count": 19,
   "record_origin": "compute-atlas",
   "case_files": "https://suedatacenters.org/lawsuits/naacp-v-xai-clean-air-act https://suedatacenters.org/lawsuits/southaven-xai-turbine-noise-class-action",
   "profile_url": "https://suedatacenters.org/data-centers/xai-southaven-ms"
  },
  {
   "id": "yondr-cerberus-manassas-va",
   "name": "Yondr Manassas Data Center Campus",
   "operator": "Yondr Group / Cerberus Capital Management",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": null,
   "source_confidence": "confirmed",
   "city": "Manassas",
   "county": null,
   "state": "VA",
   "latitude": 38.7509,
   "longitude": -77.4753,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 72,
   "capacity_mw_operational": null,
   "land_acres": 40,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": null,
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2026-08-03",
   "record_updated": "2026-08-27",
   "source_count": 1,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/yondr-cerberus-manassas-va"
  },
  {
   "id": "ecp-york-2-energy-center-data-center-peach-bottom-york-pa",
   "name": "York 2 Energy Center Data Center",
   "operator": "Energy Capital Partners",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "contested",
   "source_confidence": "reported",
   "city": "Peach Bottom Township",
   "county": "York",
   "state": "PA",
   "latitude": 39.75,
   "longitude": -76.35,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": null,
   "investment_usd": 5000000000,
   "jobs_permanent": null,
   "jobs_construction": 2500,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-07-21",
   "record_updated": "2026-08-31",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/ecp-york-2-energy-center-data-center-peach-bottom-york-pa"
  },
  {
   "id": "cnx-zediker-station-south-strabane-washington-county-pa",
   "name": "Zediker Station Data Center Site",
   "operator": "CNX Resources",
   "company": null,
   "facility_type": "data_center",
   "status": "proposed",
   "community_reception": "supported",
   "source_confidence": "reported",
   "city": "South Strabane Township",
   "county": "Washington",
   "state": "PA",
   "latitude": 40.156,
   "longitude": -80.19,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": null,
   "capacity_mw_operational": null,
   "land_acres": 1500,
   "investment_usd": null,
   "jobs_permanent": null,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "on_site_gas",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": "2025-10-20",
   "record_updated": "2026-09-10",
   "source_count": 2,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/cnx-zediker-station-south-strabane-washington-county-pa"
  },
  {
   "id": "zenith-volts-roswell-chaves-county-data-center-nm",
   "name": "Zenith Volts Roswell / Chaves County Data Center",
   "operator": "Zenith Volts Corp.",
   "company": null,
   "facility_type": "data_center",
   "status": "permitted",
   "community_reception": "supported",
   "source_confidence": "confirmed",
   "city": "Roswell",
   "county": "Chaves",
   "state": "NM",
   "latitude": 33.14,
   "longitude": -104.52,
   "coordinate_precision": "approximate",
   "capacity_mw_planned": 1240,
   "capacity_mw_operational": null,
   "land_acres": 300,
   "investment_usd": null,
   "jobs_permanent": 140,
   "jobs_construction": null,
   "cooling_type": null,
   "water_reported_mgd": null,
   "energy_source": "mixed",
   "utility": null,
   "on_site_generation_mw": null,
   "subsidy_programs": 0,
   "subsidy_usd_known": null,
   "announced_date": null,
   "record_updated": "2026-09-03",
   "source_count": 6,
   "record_origin": "compute-atlas",
   "case_files": null,
   "profile_url": "https://suedatacenters.org/data-centers/zenith-volts-roswell-chaves-county-data-center-nm"
  }
 ]
}